Bid Tabulations
Letting of
09/12/2012
LA DOTD Headquarters
| Lead Project: H.009275.6 | |
| Parish: Orleans | |
| Routes: LA 428 | |
| Description: LA 428: ROUNDABOUT @ MARDI GRAS BLVD. | |
| Type Const: INSTALL ROUNDABOUT USING PCC PAVEMENT AND ASPHALTIC CONCRETE WIDENING, INSTALL DRAINAGE, AND RELATED WORK | |
| Estimated Construction Cost: $976,921.04 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 02179 | Boh Bros. Construction Co., LLC. | $793,127.00 |
| 2 | 49356 | Kort's Trucking Inc. | $819,904.33 |
| 3 | 38610 | Three C's Properties Inc | $829,704.76 |
| 4 | 48896 | Command Construction Industries LLC | $876,819.40 |
| 5 | 00935 | Fleming Construction Co., LLC | $919,524.53 |
| 6 | 12198 | Byron E. Talbot Contractor, Inc. | $939,990.11 |
| 7 | 50078 | Fenton Excavating & Const. Inc. | $961,530.78 |
| 8 | 24901 | Hard Rock Construction LLC | $1,114,870.83 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Boh Bros. Construction Co., LLC. |
- 2 - Kort's Trucking Inc. |
- 3 - Three C's Properties Inc |
- 4 - Command Construction Industries LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of small shrub in the median | 5 | EACH | 350.00 | 1,750.00 | 125.00 | 625.00 | 130.00 | 650.00 | 1.00 | 5.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 2,710 | LNFT | 3.00 | 8,130.00 | 7.00 | 18,970.00 | 5.00 | 13,550.00 | 20.00 | 54,200.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 322 | SQYD | 8.00 | 2,576.00 | 9.00 | 2,898.00 | 11.00 | 3,542.00 | 20.00 | 6,440.00 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 371 | LNFT | 4.00 | 1,484.00 | 7.00 | 2,597.00 | 4.00 | 1,484.00 | 20.00 | 7,420.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 191 | SQYD | 12.00 | 2,292.00 | 12.00 | 2,292.00 | 13.00 | 2,483.00 | 20.00 | 3,820.00 |
| 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 5 | EACH | 31.00 | 155.00 | 50.00 | 250.00 | 26.00 | 130.00 | 1.00 | 5.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 3,386 | SQYD | 7.00 | 23,702.00 | 10.65 | 36,060.90 | 5.00 | 16,930.00 | 10.00 | 33,860.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,225 | CUYD | 25.00 | 55,625.00 | 17.00 | 37,825.00 | 15.50 | 34,487.50 | 20.00 | 44,500.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 842.5 | TON | 105.00 | 88,462.50 | 155.00 | 130,587.50 | 139.00 | 117,107.50 | 150.00 | 126,375.00 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 7,690 | SQYD | 3.00 | 23,070.00 | 3.75 | 28,837.50 | 4.00 | 30,760.00 | 2.00 | 15,380.00 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -427.2 | CUYD | 7.00 | -2,990.40 | 1.00 | -427.20 | 1.00 | -427.20 | 1.00 | -427.20 |
| 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 40 | SQYD | 120.00 | 4,800.00 | 250.00 | 10,000.00 | 180.00 | 7,200.00 | 200.00 | 8,000.00 |
| 0013 | 510-02-00100 | Pavement Widening | 949.5 | SQYD | 95.00 | 90,202.50 | 75.00 | 71,212.50 | 70.00 | 66,465.00 | 70.00 | 66,465.00 |
| 0014 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 540 | SQYD | 60.00 | 32,400.00 | 70.00 | 37,800.00 | 70.00 | 37,800.00 | 70.00 | 37,800.00 |
| 0015 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 220 | LNFT | 40.00 | 8,800.00 | 50.00 | 11,000.00 | 86.00 | 18,920.00 | 100.00 | 22,000.00 |
| 0016 | 702-03-00500 | Catch Basins (CB-06) | 10 | EACH | 1,300.00 | 13,000.00 | 2,000.00 | 20,000.00 | 3,700.00 | 37,000.00 | 4,000.00 | 40,000.00 |
| 0017 | 702-04-00100 | Adjusting Manholes | 11 | EACH | 750.00 | 8,250.00 | 500.00 | 5,500.00 | 250.00 | 2,750.00 | 750.00 | 8,250.00 |
| 0018 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 250.00 | 500.00 | 500.00 | 1,000.00 | 250.00 | 500.00 | 400.00 | 800.00 |
| 0019 | 706-01-00300 | Concrete Walk (6" Thick) | 408 | SQYD | 70.00 | 28,560.00 | 65.00 | 26,520.00 | 58.00 | 23,664.00 | 60.00 | 24,480.00 |
| 0020 | 706-04-00100 | Handicapped Curb Ramps | 65 | EACH | 1,600.00 | 104,000.00 | 800.00 | 52,000.00 | 1,300.00 | 84,500.00 | 750.00 | 48,750.00 |
| 0021 | 707-01-00200 | Concrete Curb (Barrier) | 746 | LNFT | 15.00 | 11,190.00 | 10.00 | 7,460.00 | 6.50 | 4,849.00 | 25.00 | 18,650.00 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,115 | LNFT | 25.00 | 77,875.00 | 27.50 | 85,662.50 | 17.50 | 54,512.50 | 35.00 | 109,025.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,592.20 | 13,592.20 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 1,000.00 | 1,000.00 |
| 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,244 | LNFT | 0.30 | 973.20 | 0.30 | 973.20 | 0.40 | 1,297.60 | 0.10 | 324.40 |
| 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 7,290 | LNFT | 1.00 | 7,290.00 | 1.00 | 7,290.00 | 1.10 | 8,019.00 | 0.10 | 729.00 |
| 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.52 | MILE | 610.00 | 317.20 | 100.00 | 52.00 | 950.00 | 494.00 | 5,000.00 | 2,600.00 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.8 | MILE | 610.00 | 3,538.00 | 650.00 | 3,770.00 | 1,100.00 | 6,380.00 | 500.00 | 2,900.00 |
| 0028 | 717-01-00100 | Seeding | 24 | LB | 5.00 | 120.00 | 20.00 | 480.00 | 17.00 | 408.00 | 20.00 | 480.00 |
| 0029 | 718-01-00100 | Fertilizer | 800 | LB | 5.00 | 4,000.00 | 1.50 | 1,200.00 | 2.00 | 1,600.00 | 2.00 | 1,600.00 |
| 0030 | 726-01-00100 | Bedding Material | 43 | CUYD | 80.00 | 3,440.00 | 55.00 | 2,365.00 | 165.00 | 7,095.00 | 100.00 | 4,300.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 31,000.00 | 31,000.00 | 40,000.00 | 40,000.00 | 42,000.00 | 42,000.00 | 85,000.00 | 85,000.00 |
| 0032 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 311 | SQFT | 17.00 | 5,287.00 | 20.00 | 6,220.00 | 22.00 | 6,842.00 | 18.00 | 5,598.00 |
| 0033 | 729-21-00100 | U-Channel Post | 41 | EACH | 56.00 | 2,296.00 | 65.00 | 2,665.00 | 67.00 | 2,747.00 | 100.00 | 4,100.00 |
| 0034 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") TO BE INSTALLED AS DIRECTED BY PROJECT ENGINEER | 50 | LNFT | 35.00 | 1,750.00 | 6.50 | 325.00 | 51.00 | 2,550.00 | 35.00 | 1,750.00 |
| 0035 | 730-15-01000 | Relocate Light Poles see plan sheets for location | 2 | EACH | 4,800.00 | 9,600.00 | 3,000.00 | 6,000.00 | 3,800.00 | 7,600.00 | 4,000.00 | 8,000.00 |
| 0036 | 730-16-00100 | Underground Junction Box (12" x 12") TO BE INSTALLED AS DIRECTED BY PROJECT ENGINEER | 4 | EACH | 780.00 | 3,120.00 | 600.00 | 2,400.00 | 480.00 | 1,920.00 | 500.00 | 2,000.00 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,457 | EACH | 6.00 | 8,742.00 | 4.50 | 6,556.50 | 5.00 | 7,285.00 | 5.00 | 7,285.00 |
| 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) TO BE USED FOR GORES | 1,547 | LNFT | 5.00 | 7,735.00 | 4.00 | 6,188.00 | 4.70 | 7,270.90 | 5.00 | 7,735.00 |
| 0039 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,622 | LNFT | 1.50 | 2,433.00 | 1.10 | 1,784.20 | 1.50 | 2,433.00 | 2.00 | 3,244.00 |
| 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) TO BE USED FOR CROSSWALKS AND STOP BARS | 2,098 | LNFT | 6.00 | 12,588.00 | 5.00 | 10,490.00 | 5.90 | 12,378.20 | 5.00 | 10,490.00 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.9 | MILE | 2,700.00 | 7,830.00 | 2,600.00 | 7,540.00 | 3,250.00 | 9,425.00 | 2,500.00 | 7,250.00 |
| 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.26 | MILE | 940.00 | 244.40 | 1,450.00 | 377.00 | 1,700.00 | 442.00 | 2,500.00 | 650.00 |
| 0043 | 732-03-02050 | Plastic Pvmt Strip (Dotted Line)(12" W)(2' L)(Thermo 90 mil) | 0.025 | MILE | 5,500.00 | 137.50 | 9,225.00 | 230.63 | 11,000.00 | 275.00 | 10,000.00 | 250.00 |
| 0044 | 732-04-25000 | Plastic Pavement Legends and Symbols (YIELD) | 4 | EACH | 330.00 | 1,320.00 | 250.00 | 1,000.00 | 300.00 | 1,200.00 | 500.00 | 2,000.00 |
| 0045 | 732-05-00100 | Removal of Existing Markings | 0.79 | MILE | 4,400.00 | 3,476.00 | 3,000.00 | 2,370.00 | 5,700.00 | 4,503.00 | 5,000.00 | 3,950.00 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 32,000.00 | 32,000.00 | 1,000.00 | 1,000.00 |
| 0047 | 741-05-01100 | Water Service Line (2" PVC) TO BE INSTALLED AS DIRECTED BY PROJECT ENGINEER | 50 | LNFT | 25.00 | 1,250.00 | 35.00 | 1,750.00 | 34.00 | 1,700.00 | 15.00 | 750.00 |
| 0048 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 9 | EACH | 350.00 | 3,150.00 | 500.00 | 4,500.00 | 950.00 | 8,550.00 | 250.00 | 2,250.00 |
| 0049 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 33,098 | INLF | 0.75 | 24,823.50 | 0.95 | 31,443.10 | 0.72 | 23,830.56 | 0.10 | 3,309.80 |
| 0050 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,764 | INLF | 1.10 | 5,240.40 | 1.00 | 4,764.00 | 1.05 | 5,002.20 | 0.10 | 476.40 |
| 0051 | NS-713-00001 | Dynamic Message Sign Unit | 8 | EACH | 1,500.00 | 12,000.00 | 3,500.00 | 28,000.00 | 3,000.00 | 24,000.00 | 1,250.00 | 10,000.00 |
| 0052 | NS-MSC-00120 | Drainage Structure CONVERT CATCH BASIN TO CB-01 | 9 | EACH | 2,700.00 | 24,300.00 | 1,500.00 | 13,500.00 | 2,200.00 | 19,800.00 | 2,000.00 | 18,000.00 |
| 0053 | NS-MSC-00120 | Drainage Structure CONVERT CATCH BASIN TO MANHOLE | 1 | EACH | 2,700.00 | 2,700.00 | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 |
| CONTRACTOR TOTAL | 793,127.00 | 819,904.33 | 829,704.76 | 876,819.40 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Fleming Construction Co., LLC |
- 6 - Byron E. Talbot Contractor, Inc. |
- 7 - Fenton Excavating & Const. Inc. |
- 8 - Hard Rock Construction LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-00010 | Removal of small shrub in the median | 5 | EACH | 50.00 | 250.00 | 150.00 | 750.00 | 45.00 | 225.00 | 100.00 | 500.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 2,710 | LNFT | 4.00 | 10,840.00 | 6.75 | 18,292.50 | 4.40 | 11,924.00 | 15.00 | 40,650.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 322 | SQYD | 15.00 | 4,830.00 | 8.10 | 2,608.20 | 9.00 | 2,898.00 | 10.00 | 3,220.00 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 371 | LNFT | 1.00 | 371.00 | 7.00 | 2,597.00 | 4.92 | 1,825.32 | 5.00 | 1,855.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 191 | SQYD | 20.00 | 3,820.00 | 11.65 | 2,225.15 | 13.53 | 2,584.23 | 20.00 | 3,820.00 |
| 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 5 | EACH | 30.00 | 150.00 | 100.00 | 500.00 | 33.92 | 169.60 | 25.00 | 125.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 3,386 | SQYD | 10.00 | 33,860.00 | 10.45 | 35,383.70 | 8.00 | 27,088.00 | 10.00 | 33,860.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,225 | CUYD | 20.00 | 44,500.00 | 21.35 | 47,503.75 | 16.63 | 37,001.75 | 40.00 | 89,000.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 842.5 | TON | 120.00 | 101,100.00 | 157.00 | 132,272.50 | 120.00 | 101,100.00 | 145.00 | 122,162.50 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 7,690 | SQYD | 3.50 | 26,915.00 | 2.75 | 21,147.50 | 4.25 | 32,682.50 | 2.50 | 19,225.00 |
| 0011 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -427.2 | CUYD | 1.00 | -427.20 | 1.00 | -427.20 | 7.11 | -3,037.39 | 1.00 | -427.20 |
| 0012 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 40 | SQYD | 150.00 | 6,000.00 | 150.00 | 6,000.00 | 150.00 | 6,000.00 | 180.00 | 7,200.00 |
| 0013 | 510-02-00100 | Pavement Widening | 949.5 | SQYD | 100.00 | 94,950.00 | 90.00 | 85,455.00 | 115.00 | 109,192.50 | 70.00 | 66,465.00 |
| 0014 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 540 | SQYD | 75.00 | 40,500.00 | 81.00 | 43,740.00 | 60.90 | 32,886.00 | 73.00 | 39,420.00 |
| 0015 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 220 | LNFT | 100.00 | 22,000.00 | 80.00 | 17,600.00 | 102.00 | 22,440.00 | 130.00 | 28,600.00 |
| 0016 | 702-03-00500 | Catch Basins (CB-06) | 10 | EACH | 3,700.00 | 37,000.00 | 2,730.00 | 27,300.00 | 4,000.00 | 40,000.00 | 4,000.00 | 40,000.00 |
| 0017 | 702-04-00100 | Adjusting Manholes | 11 | EACH | 500.00 | 5,500.00 | 285.00 | 3,135.00 | 300.00 | 3,300.00 | 800.00 | 8,800.00 |
| 0018 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 2 | EACH | 500.00 | 1,000.00 | 700.00 | 1,400.00 | 285.00 | 570.00 | 800.00 | 1,600.00 |
| 0019 | 706-01-00300 | Concrete Walk (6" Thick) | 408 | SQYD | 60.00 | 24,480.00 | 74.00 | 30,192.00 | 53.00 | 21,624.00 | 70.00 | 28,560.00 |
| 0020 | 706-04-00100 | Handicapped Curb Ramps | 65 | EACH | 1,800.00 | 117,000.00 | 1,000.00 | 65,000.00 | 1,100.00 | 71,500.00 | 2,000.00 | 130,000.00 |
| 0021 | 707-01-00200 | Concrete Curb (Barrier) | 746 | LNFT | 10.00 | 7,460.00 | 8.00 | 5,968.00 | 14.00 | 10,444.00 | 9.00 | 6,714.00 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 3,115 | LNFT | 30.00 | 93,450.00 | 33.00 | 102,795.00 | 21.80 | 67,907.00 | 24.00 | 74,760.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 14,500.00 | 14,500.00 | 60,000.00 | 60,000.00 |
| 0024 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 3,244 | LNFT | 0.30 | 973.20 | 0.30 | 973.20 | 0.28 | 908.32 | 0.30 | 973.20 |
| 0025 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 7,290 | LNFT | 1.00 | 7,290.00 | 0.80 | 5,832.00 | 0.85 | 6,196.50 | 1.00 | 7,290.00 |
| 0026 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.52 | MILE | 650.00 | 338.00 | 3,000.00 | 1,560.00 | 960.93 | 499.68 | 650.00 | 338.00 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 5.8 | MILE | 650.00 | 3,770.00 | 585.00 | 3,393.00 | 621.78 | 3,606.32 | 650.00 | 3,770.00 |
| 0028 | 717-01-00100 | Seeding | 24 | LB | 10.00 | 240.00 | 16.00 | 384.00 | 17.00 | 408.00 | 5.00 | 120.00 |
| 0029 | 718-01-00100 | Fertilizer | 800 | LB | 2.00 | 1,600.00 | 1.50 | 1,200.00 | 1.36 | 1,088.00 | 1.00 | 800.00 |
| 0030 | 726-01-00100 | Bedding Material | 43 | CUYD | 80.00 | 3,440.00 | 70.00 | 3,010.00 | 55.00 | 2,365.00 | 60.00 | 2,580.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 40,000.00 | 40,000.00 | 148,000.00 | 148,000.00 | 100,000.00 | 100,000.00 |
| 0032 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 311 | SQFT | 20.00 | 6,220.00 | 17.76 | 5,523.36 | 19.00 | 5,909.00 | 17.00 | 5,287.00 |
| 0033 | 729-21-00100 | U-Channel Post | 41 | EACH | 60.00 | 2,460.00 | 58.30 | 2,390.30 | 62.18 | 2,549.38 | 55.00 | 2,255.00 |
| 0034 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") TO BE INSTALLED AS DIRECTED BY PROJECT ENGINEER | 50 | LNFT | 20.00 | 1,000.00 | 44.00 | 2,200.00 | 17.00 | 850.00 | 60.00 | 3,000.00 |
| 0035 | 730-15-01000 | Relocate Light Poles see plan sheets for location | 2 | EACH | 2,000.00 | 4,000.00 | 5,000.00 | 10,000.00 | 2,487.10 | 4,974.20 | 3,500.00 | 7,000.00 |
| 0036 | 730-16-00100 | Underground Junction Box (12" x 12") TO BE INSTALLED AS DIRECTED BY PROJECT ENGINEER | 4 | EACH | 500.00 | 2,000.00 | 1,000.00 | 4,000.00 | 734.83 | 2,939.32 | 1,000.00 | 4,000.00 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,457 | EACH | 4.50 | 6,556.50 | 5.56 | 8,100.92 | 5.94 | 8,654.58 | 4.50 | 6,556.50 |
| 0038 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) TO BE USED FOR GORES | 1,547 | LNFT | 4.00 | 6,188.00 | 4.77 | 7,379.19 | 5.09 | 7,874.23 | 4.00 | 6,188.00 |
| 0039 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,622 | LNFT | 1.10 | 1,784.20 | 1.59 | 2,578.98 | 1.70 | 2,757.40 | 1.10 | 1,784.20 |
| 0040 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) TO BE USED FOR CROSSWALKS AND STOP BARS | 2,098 | LNFT | 5.00 | 10,490.00 | 5.30 | 11,119.40 | 5.65 | 11,853.70 | 5.00 | 10,490.00 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.9 | MILE | 2,600.00 | 7,540.00 | 2,650.00 | 7,685.00 | 2,826.25 | 8,196.13 | 2,600.00 | 7,540.00 |
| 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.26 | MILE | 1,450.00 | 377.00 | 901.00 | 234.26 | 960.93 | 249.84 | 1,450.00 | 377.00 |
| 0043 | 732-03-02050 | Plastic Pvmt Strip (Dotted Line)(12" W)(2' L)(Thermo 90 mil) | 0.025 | MILE | 9,225.00 | 230.63 | 5,300.00 | 132.50 | 5,652.50 | 141.31 | 9,225.00 | 230.63 |
| 0044 | 732-04-25000 | Plastic Pavement Legends and Symbols (YIELD) | 4 | EACH | 250.00 | 1,000.00 | 318.00 | 1,272.00 | 339.15 | 1,356.60 | 250.00 | 1,000.00 |
| 0045 | 732-05-00100 | Removal of Existing Markings | 0.79 | MILE | 3,000.00 | 2,370.00 | 4,240.00 | 3,349.60 | 4,522.00 | 3,572.38 | 3,000.00 | 2,370.00 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 42,000.00 | 42,000.00 |
| 0047 | 741-05-01100 | Water Service Line (2" PVC) TO BE INSTALLED AS DIRECTED BY PROJECT ENGINEER | 50 | LNFT | 50.00 | 2,500.00 | 100.00 | 5,000.00 | 38.32 | 1,916.00 | 35.00 | 1,750.00 |
| 0048 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 9 | EACH | 300.00 | 2,700.00 | 1,250.00 | 11,250.00 | 750.00 | 6,750.00 | 800.00 | 7,200.00 |
| 0049 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 33,098 | INLF | 0.60 | 19,858.80 | 1.05 | 34,752.90 | 1.05 | 34,752.90 | 1.00 | 33,098.00 |
| 0050 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 4,764 | INLF | 0.85 | 4,049.40 | 1.35 | 6,431.40 | 1.07 | 5,097.48 | 1.00 | 4,764.00 |
| 0051 | NS-713-00001 | Dynamic Message Sign Unit | 8 | EACH | 1,500.00 | 12,000.00 | 5,500.00 | 44,000.00 | 1,580.00 | 12,640.00 | 4,500.00 | 36,000.00 |
| 0052 | NS-MSC-00120 | Drainage Structure CONVERT CATCH BASIN TO CB-01 | 9 | EACH | 1,800.00 | 16,200.00 | 1,900.00 | 17,100.00 | 4,000.00 | 36,000.00 | 1,000.00 | 9,000.00 |
| 0053 | NS-MSC-00120 | Drainage Structure CONVERT CATCH BASIN TO MANHOLE | 1 | EACH | 1,800.00 | 1,800.00 | 2,700.00 | 2,700.00 | 4,600.00 | 4,600.00 | 1,000.00 | 1,000.00 |
| CONTRACTOR TOTAL | 919,524.53 | 939,990.11 | 961,530.78 | 1,114,870.83 | ||||||||