Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.009235.6 | |
| Parish: West Baton Rouge | |
| Routes: LA 74 | |
| Description: LA 985 REGRADE ROADWAY | |
| Type Const: CLEARING AND GRUBBING, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPABE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMET AND RELATED WORK. | |
| Estimated Construction Cost: $562,527.67 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 14807 | Richard Price Contracting Co, Llc | $459,553.48 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $524,732.60 |
| 3 | 00481 | Coastal Bridge Co., L.L.C. | $576,859.25 |
| 4 | 39462 | Jb James Construction Llc | $579,359.40 |
| 5 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $588,643.00 |
| 6 | 05693 | Industrial Enterprises, Inc. | $594,362.01 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Richard Price Contracting Co, Llc |
- 2 - Barber Bros. Contracting Co., L.L.C |
- 3 - Coastal Bridge Co., L.L.C. |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 6,500.00 | 6,500.00 | 18,000.00 | 18,000.00 | 21,500.00 | 21,500.00 | 40,000.00 | 40,000.00 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 350 | SQYD | 6.00 | 2,100.00 | 20.00 | 7,000.00 | 10.00 | 3,500.00 | 5.50 | 1,925.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) REMOVE CMPA @ STATION 17+37 | 105 | LNFT | 9.00 | 945.00 | 50.00 | 5,250.00 | 11.00 | 1,155.00 | 16.00 | 1,680.00 |
| 0004 | 203-04-00300 | Nonplastic Embankment (Stone) | 380 | CUYD | 86.00 | 32,680.00 | 80.00 | 30,400.00 | 65.00 | 24,700.00 | 80.00 | 30,400.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 14.00 | 7,000.00 | 20.00 | 10,000.00 | 18.00 | 9,000.00 | 22.00 | 11,000.00 |
| 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 2,444.4 | CUYD | 14.00 | 34,221.60 | 18.00 | 43,999.20 | 18.00 | 43,999.20 | 25.00 | 61,110.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 4,224 | LNFT | 2.00 | 8,448.00 | 1.60 | 6,758.40 | 1.50 | 6,336.00 | 1.60 | 6,758.40 |
| 0008 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 3,055.5 | SQYD | 8.00 | 24,444.00 | 12.00 | 36,666.00 | 8.00 | 24,444.00 | 9.00 | 27,499.50 |
| 0009 | 303-02-00100 | Removal of Existing Patches | 200 | SQYD | 5.00 | 1,000.00 | 25.00 | 5,000.00 | 10.00 | 2,000.00 | 10.00 | 2,000.00 |
| 0010 | 304-01-00100 | Lime | 2 | TON | 199.00 | 398.00 | 250.00 | 500.00 | 400.00 | 800.00 | 300.00 | 600.00 |
| 0011 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 80 | SQYD | 15.50 | 1,240.00 | 8.00 | 640.00 | 55.00 | 4,400.00 | 14.00 | 1,120.00 |
| 0012 | 304-05-00100 | Lime Treatment (Type E) | 2.5 | TON | 300.00 | 750.00 | 1,000.00 | 2,500.00 | 2,100.00 | 5,250.00 | 600.00 | 1,500.00 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 209 | CUYD | 79.00 | 16,511.00 | 65.00 | 13,585.00 | 65.00 | 13,585.00 | 80.00 | 16,720.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 917.4 | TON | 100.00 | 91,740.00 | 85.00 | 77,979.00 | 100.00 | 91,740.00 | 95.00 | 87,153.00 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 169 | TON | 150.00 | 25,350.00 | 135.00 | 22,815.00 | 125.00 | 21,125.00 | 140.00 | 23,660.00 |
| 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 200 | SQYD | 98.50 | 19,700.00 | 80.00 | 16,000.00 | 90.00 | 18,000.00 | 80.00 | 16,000.00 |
| 0017 | 701-02-01180 | Cross Drain Pipe Arch (96" Equiv. RCPA) | 108 | LNFT | 500.00 | 54,000.00 | 700.00 | 75,600.00 | 850.00 | 91,800.00 | 580.00 | 62,640.00 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 19,000.00 | 19,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 18,000.00 | 18,000.00 |
| 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.05 | MILE | 1,116.00 | 55.80 | 1,200.00 | 60.00 | 1,100.00 | 55.00 | 1,000.00 | 50.00 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.6 | MILE | 614.00 | 982.40 | 650.00 | 1,040.00 | 600.00 | 960.00 | 550.00 | 880.00 |
| 0021 | 726-01-00100 | Bedding Material | 267 | CUYD | 54.00 | 14,418.00 | 10.00 | 2,670.00 | 75.00 | 20,025.00 | 70.00 | 18,690.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 58,000.00 | 58,000.00 | 57,000.00 | 57,000.00 |
| 0023 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 175.00 | 350.00 | 90.00 | 180.00 | 95.00 | 190.00 | 120.00 | 240.00 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 54 | EACH | 5.85 | 315.90 | 6.00 | 324.00 | 5.75 | 310.50 | 6.00 | 324.00 |
| 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.8 | MILE | 3,181.00 | 2,544.80 | 3,500.00 | 2,800.00 | 3,200.00 | 2,560.00 | 3,000.00 | 2,400.00 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.025 | MILE | 759.00 | 18.98 | 800.00 | 20.00 | 950.00 | 23.75 | 1,100.00 | 27.50 |
| 0027 | 739-01-00100 | Hydro-Seeding | 1.5 | ACRE | 1,216.00 | 1,824.00 | 1,500.00 | 2,250.00 | 1,200.00 | 1,800.00 | 1,100.00 | 1,650.00 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,348.00 | 6,348.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 |
| 0029 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 54.4 | CUYD | 850.00 | 46,240.00 | 850.00 | 46,240.00 | 1,000.00 | 54,400.00 | 1,100.00 | 59,840.00 |
| 0030 | 806-01-00100 | Deformed Reinforcing Steel | 4,728 | LB | 1.00 | 4,728.00 | 2.00 | 9,456.00 | 1.10 | 5,200.80 | 1.50 | 7,092.00 |
| 0031 | NS-500-00280 | Surface Preparation | 1 | LUMP | 18,500.00 | 18,500.00 | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 |
| 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,000 | INLF | 1.10 | 2,200.00 | 1.00 | 2,000.00 | 1.25 | 2,500.00 | 0.70 | 1,400.00 |
| CONTRACTOR TOTAL | 459,553.48 | 524,732.60 | 576,859.25 | 579,359.40 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - F.G. Sullivan, Jr. Contractor LLC |
- 6 - Industrial Enterprises, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 20,000.00 | 20,000.00 | 17,250.00 | 17,250.00 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 350 | SQYD | 5.00 | 1,750.00 | 5.75 | 2,012.50 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) REMOVE CMPA @ STATION 17+37 | 105 | LNFT | 10.00 | 1,050.00 | 11.50 | 1,207.50 |
| 0004 | 203-04-00300 | Nonplastic Embankment (Stone) | 380 | CUYD | 50.00 | 19,000.00 | 84.53 | 32,121.40 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 500 | CUYD | 20.00 | 10,000.00 | 20.00 | 10,000.00 |
| 0006 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 2,444.4 | CUYD | 30.00 | 73,332.00 | 20.00 | 48,888.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 4,224 | LNFT | 1.50 | 6,336.00 | 1.67 | 7,054.08 |
| 0008 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 3,055.5 | SQYD | 10.00 | 30,555.00 | 13.62 | 41,615.91 |
| 0009 | 303-02-00100 | Removal of Existing Patches | 200 | SQYD | 10.00 | 2,000.00 | 5.75 | 1,150.00 |
| 0010 | 304-01-00100 | Lime | 2 | TON | 10.00 | 20.00 | 180.00 | 360.00 |
| 0011 | 304-03-00400 | Lime Treatment (Type C) (12" Thick) | 80 | SQYD | 10.00 | 800.00 | 10.00 | 800.00 |
| 0012 | 304-05-00100 | Lime Treatment (Type E) | 2.5 | TON | 100.00 | 250.00 | 580.00 | 1,450.00 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 209 | CUYD | 40.00 | 8,360.00 | 115.75 | 24,191.75 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 917.4 | TON | 100.00 | 91,740.00 | 104.31 | 95,693.99 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 169 | TON | 100.00 | 16,900.00 | 114.74 | 19,391.06 |
| 0016 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 200 | SQYD | 150.00 | 30,000.00 | 125.00 | 25,000.00 |
| 0017 | 701-02-01180 | Cross Drain Pipe Arch (96" Equiv. RCPA) | 108 | LNFT | 1,200.00 | 129,600.00 | 889.69 | 96,086.52 |
| 0018 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 20,346.72 | 20,346.72 |
| 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.05 | MILE | 100.00 | 5.00 | 385.00 | 19.25 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.6 | MILE | 100.00 | 160.00 | 495.00 | 792.00 |
| 0021 | 726-01-00100 | Bedding Material | 267 | CUYD | 1.00 | 267.00 | 86.74 | 23,159.58 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 22,305.00 | 22,305.00 |
| 0023 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 50.00 | 100.00 | 115.00 | 230.00 |
| 0024 | 731-02-00100 | Reflectorized Raised Pavement Markers | 54 | EACH | 15.00 | 810.00 | 16.50 | 891.00 |
| 0025 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.8 | MILE | 5,000.00 | 4,000.00 | 5,500.00 | 4,400.00 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.025 | MILE | 6,000.00 | 150.00 | 5,500.00 | 137.50 |
| 0027 | 739-01-00100 | Hydro-Seeding | 1.5 | ACRE | 1,100.00 | 1,650.00 | 1,253.50 | 1,880.25 |
| 0028 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 17,250.00 | 17,250.00 |
| 0029 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 54.4 | CUYD | 700.00 | 38,080.00 | 1,265.00 | 68,816.00 |
| 0030 | 806-01-00100 | Deformed Reinforcing Steel | 4,728 | LB | 1.00 | 4,728.00 | 1.50 | 7,092.00 |
| 0031 | NS-500-00280 | Surface Preparation | 1 | LUMP | 5,000.00 | 5,000.00 | 1,150.00 | 1,150.00 |
| 0032 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,000 | INLF | 1.00 | 2,000.00 | 0.81 | 1,620.00 |
| CONTRACTOR TOTAL | 588,643.00 | 594,362.01 | ||||||