Bid Tabulations
Letting of
01/25/2012
LA DOTD Headquarters
| Lead Project: H.009220.6 | |
| Parish: Ascension | |
| Routes: US 61 | |
| Description: US 61: SOUTHBOUND RTL @ LA 427 | |
| Type Const: CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $217,665.08 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 14807 | Richard Price Contracting Co, Llc | $212,477.41 |
| 2 | 05693 | Industrial Enterprises, Inc. | $239,589.42 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $249,321.46 |
| 4 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $267,649.55 |
| 5 | 29595 | Boone Services Inc. | $281,811.05 |
| 6 | 06276 | Barriere Construction Co., LLC | $288,075.90 |
| 7 | 12031 | R.J. Daigle & Sons Contractors, Inc | $295,238.70 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Richard Price Contracting Co, Llc |
- 2 - Industrial Enterprises, Inc. |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - F.G. Sullivan, Jr. Contractor LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 230 | SQYD | 5.00 | 1,150.00 | 8.05 | 1,851.50 | 10.25 | 2,357.50 | 10.00 | 2,300.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 80 | LNFT | 6.00 | 480.00 | 3.45 | 276.00 | 2.50 | 200.00 | 10.00 | 800.00 |
| 0003 | 202-02-32120 | Removal of Pipe (Side Drain) STA 13+71.19 | 56 | LNFT | 11.00 | 616.00 | 5.75 | 322.00 | 2.50 | 140.00 | 10.00 | 560.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 614.2 | SQYD | 5.50 | 3,378.10 | 5.75 | 3,531.65 | 7.50 | 4,606.50 | 10.00 | 6,142.00 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 7,000.00 | 7,000.00 | 12,374.26 | 12,374.26 | 10,000.00 | 10,000.00 | 7,000.00 | 7,000.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 430.67 | CUYD | 16.00 | 6,890.72 | 13.50 | 5,814.05 | 15.45 | 6,653.85 | 35.00 | 15,073.45 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 2.20 | 1,320.00 | 2.30 | 1,380.00 | 2.50 | 1,500.00 | 3.50 | 2,100.00 |
| 0008 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 578.5 | SQYD | 16.50 | 9,545.25 | 27.09 | 15,671.57 | 18.95 | 10,962.58 | 25.00 | 14,462.50 |
| 0009 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 794.8 | SQYD | 26.25 | 20,863.50 | 42.44 | 33,731.31 | 28.10 | 22,333.88 | 35.00 | 27,818.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 603.2 | TON | 120.00 | 72,384.00 | 118.31 | 71,364.59 | 128.00 | 77,209.60 | 135.00 | 81,432.00 |
| 0011 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 60 | LNFT | 57.25 | 3,435.00 | 52.90 | 3,174.00 | 60.00 | 3,600.00 | 150.00 | 9,000.00 |
| 0012 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 81 | LNFT | 88.00 | 7,128.00 | 84.80 | 6,868.80 | 85.00 | 6,885.00 | 65.00 | 5,265.00 |
| 0013 | 704-03-00100 | Blocked Out Guard Rail | 63.4 | LNFT | 24.18 | 1,533.01 | 23.32 | 1,478.49 | 24.00 | 1,521.60 | 21.00 | 1,331.40 |
| 0014 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 6.25 | LNFT | 99.00 | 618.75 | 95.40 | 596.25 | 110.00 | 687.50 | 100.00 | 625.00 |
| 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 230 | SQYD | 36.50 | 8,395.00 | 69.00 | 15,870.00 | 56.00 | 12,880.00 | 55.00 | 12,650.00 |
| 0016 | 707-01-00200 | Concrete Curb (Barrier) | 80 | LNFT | 23.50 | 1,880.00 | 9.20 | 736.00 | 10.00 | 800.00 | 20.00 | 1,600.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,275.00 | 7,275.00 | 18,937.97 | 18,937.97 | 20,000.00 | 20,000.00 | 20,500.00 | 20,500.00 |
| 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 200 | LNFT | 0.25 | 50.00 | 0.23 | 46.00 | 0.30 | 60.00 | 0.22 | 44.00 |
| 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.82 | 19.68 | 0.80 | 19.20 | 0.85 | 20.40 | 0.75 | 18.00 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.25 | MILE | 605.00 | 151.25 | 583.00 | 145.75 | 625.00 | 156.25 | 550.00 | 137.50 |
| 0021 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 49.50 | 396.00 | 47.70 | 381.60 | 50.00 | 400.00 | 45.00 | 360.00 |
| 0022 | 726-01-00100 | Bedding Material | 17 | CUYD | 61.00 | 1,037.00 | 82.50 | 1,402.50 | 72.00 | 1,224.00 | 50.00 | 850.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 19,320.00 | 19,320.00 | 35,000.00 | 35,000.00 | 34,000.00 | 34,000.00 |
| 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 159.50 | 319.00 | 84.80 | 169.60 | 90.00 | 180.00 | 75.00 | 150.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 10 | EACH | 5.75 | 57.50 | 5.57 | 55.70 | 5.78 | 57.80 | 5.25 | 52.50 |
| 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 100 | LNFT | 1.50 | 150.00 | 1.43 | 143.00 | 1.49 | 149.00 | 1.35 | 135.00 |
| 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 5.50 | 66.00 | 5.30 | 63.60 | 5.50 | 66.00 | 5.00 | 60.00 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.125 | MILE | 3,168.00 | 396.00 | 3,180.00 | 397.50 | 3,300.00 | 412.50 | 3,120.00 | 390.00 |
| 0029 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.08 | MILE | 3,300.00 | 264.00 | 3,180.00 | 254.40 | 3,300.00 | 264.00 | 3,000.00 | 240.00 |
| 0030 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 236.50 | 946.00 | 227.90 | 911.60 | 236.50 | 946.00 | 215.00 | 860.00 |
| 0031 | 736-02-00200 | Conduit with Conductors (1" HPDE, Sch 80) (W/2 - # 14 Conductors) | 300 | LNFT | 2.00 | 600.00 | 1.94 | 582.00 | 2.00 | 600.00 | 1.85 | 555.00 |
| 0032 | 736-09-00100 | Loop Detector | 100 | LNFT | 13.75 | 1,375.00 | 13.11 | 1,311.00 | 13.25 | 1,325.00 | 3.00 | 300.00 |
| 0033 | 736-10-00100 | Underground Junction Box (Type D) | 3 | EACH | 331.00 | 993.00 | 316.01 | 948.03 | 320.00 | 960.00 | 300.00 | 900.00 |
| 0034 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 250 | LNFT | 1.30 | 325.00 | 1.24 | 310.00 | 1.30 | 325.00 | 1.23 | 307.50 |
| 0035 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 2,475.00 | 1,113.75 | 2,385.00 | 1,073.25 | 2,500.00 | 1,125.00 | 2,550.00 | 1,147.50 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,000.00 | 12,000.00 | 5,750.00 | 5,750.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 |
| 0037 | NS-200-00020 | Cleaning Existing Ditches | 200 | LNFT | 9.00 | 1,800.00 | 11.50 | 2,300.00 | 5.35 | 1,070.00 | 10.00 | 2,000.00 |
| 0039 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,760.00 | 1,760.00 | 1,696.00 | 1,696.00 | 1,700.00 | 1,700.00 | 1,250.00 | 1,250.00 |
| 0040 | NS-713-00001 | Dynamic Message Sign Unit | 1 | EACH | 1,790.00 | 1,790.00 | 1,449.00 | 1,449.00 | 3,500.00 | 3,500.00 | 4,000.00 | 4,000.00 |
| 0041 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.1 | MILE | 54,975.00 | 5,497.50 | 412.50 | 41.25 | 425.00 | 42.50 | 6,700.00 | 670.00 |
| 0042 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 9,120 | INLF | 0.82 | 7,478.40 | 0.75 | 6,840.00 | 1.25 | 11,400.00 | 0.61 | 5,563.20 |
| CONTRACTOR TOTAL | 212,477.41 | 239,589.42 | 249,321.46 | 267,649.55 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Boone Services Inc. |
- 6 - Barriere Construction Co., LLC |
- 7 - R.J. Daigle & Sons Contractors, Inc |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 230 | SQYD | 13.46 | 3,095.80 | 20.00 | 4,600.00 | 15.35 | 3,530.50 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 80 | LNFT | 7.74 | 619.20 | 10.00 | 800.00 | 1.00 | 80.00 |
| 0003 | 202-02-32120 | Removal of Pipe (Side Drain) STA 13+71.19 | 56 | LNFT | 12.19 | 682.64 | 50.00 | 2,800.00 | 31.52 | 1,765.12 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 614.2 | SQYD | 17.62 | 10,822.20 | 10.00 | 6,142.00 | 24.05 | 14,771.51 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 3,867.00 | 3,867.00 | 10,000.00 | 10,000.00 | 16,350.00 | 16,350.00 |
| 0006 | 203-07-00100 | Borrow (Vehicular Measurement) | 430.67 | CUYD | 21.52 | 9,268.02 | 30.00 | 12,920.10 | 51.00 | 21,964.17 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 3.24 | 1,944.00 | 3.50 | 2,100.00 | 2.00 | 1,200.00 |
| 0008 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 578.5 | SQYD | 20.18 | 11,674.13 | 18.00 | 10,413.00 | 23.20 | 13,421.20 |
| 0009 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 794.8 | SQYD | 28.78 | 22,874.34 | 30.00 | 23,844.00 | 35.85 | 28,493.58 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 603.2 | TON | 132.00 | 79,622.40 | 125.00 | 75,400.00 | 128.60 | 77,571.52 |
| 0011 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 60 | LNFT | 51.95 | 3,117.00 | 85.00 | 5,100.00 | 56.25 | 3,375.00 |
| 0012 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 81 | LNFT | 88.00 | 7,128.00 | 80.00 | 6,480.00 | 90.00 | 7,290.00 |
| 0013 | 704-03-00100 | Blocked Out Guard Rail | 63.4 | LNFT | 24.20 | 1,534.28 | 22.00 | 1,394.80 | 25.00 | 1,585.00 |
| 0014 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 6.25 | LNFT | 99.00 | 618.75 | 90.00 | 562.50 | 100.00 | 625.00 |
| 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 230 | SQYD | 40.63 | 9,344.90 | 55.00 | 12,650.00 | 36.35 | 8,360.50 |
| 0016 | 707-01-00200 | Concrete Curb (Barrier) | 80 | LNFT | 23.95 | 1,916.00 | 30.00 | 2,400.00 | 18.71 | 1,496.80 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 21,660.00 | 21,660.00 | 28,000.00 | 28,000.00 | 7,700.00 | 7,700.00 |
| 0018 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 200 | LNFT | 0.55 | 110.00 | 0.20 | 40.00 | 0.25 | 50.00 |
| 0019 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 1.21 | 29.04 | 0.50 | 12.00 | 0.85 | 20.40 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.25 | MILE | 1,100.00 | 275.00 | 600.00 | 150.00 | 605.00 | 151.25 |
| 0021 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 55.00 | 440.00 | 50.00 | 400.00 | 50.00 | 400.00 |
| 0022 | 726-01-00100 | Bedding Material | 17 | CUYD | 44.35 | 753.95 | 100.00 | 1,700.00 | 25.00 | 425.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 51,200.00 | 51,200.00 | 28,000.00 | 28,000.00 | 51,720.00 | 51,720.00 |
| 0024 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 88.00 | 176.00 | 85.00 | 170.00 | 90.00 | 180.00 |
| 0025 | 731-02-00100 | Reflectorized Raised Pavement Markers | 10 | EACH | 5.78 | 57.80 | 5.50 | 55.00 | 6.00 | 60.00 |
| 0026 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 100 | LNFT | 1.49 | 149.00 | 1.40 | 140.00 | 1.50 | 150.00 |
| 0027 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 5.50 | 66.00 | 5.00 | 60.00 | 5.50 | 66.00 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.125 | MILE | 3,300.00 | 412.50 | 3,000.00 | 375.00 | 3,300.00 | 412.50 |
| 0029 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.08 | MILE | 3,300.00 | 264.00 | 3,000.00 | 240.00 | 3,300.00 | 264.00 |
| 0030 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 237.00 | 948.00 | 215.00 | 860.00 | 240.00 | 960.00 |
| 0031 | 736-02-00200 | Conduit with Conductors (1" HPDE, Sch 80) (W/2 - # 14 Conductors) | 300 | LNFT | 2.04 | 612.00 | 2.00 | 600.00 | 2.05 | 615.00 |
| 0032 | 736-09-00100 | Loop Detector | 100 | LNFT | 13.75 | 1,375.00 | 13.00 | 1,300.00 | 13.75 | 1,375.00 |
| 0033 | 736-10-00100 | Underground Junction Box (Type D) | 3 | EACH | 332.00 | 996.00 | 310.00 | 930.00 | 332.00 | 996.00 |
| 0034 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 250 | LNFT | 1.30 | 325.00 | 1.20 | 300.00 | 1.30 | 325.00 |
| 0035 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 3,025.00 | 1,361.25 | 2,250.00 | 1,012.50 | 2,475.00 | 1,113.75 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 25,000.00 | 25,000.00 | 3,500.00 | 3,500.00 |
| 0037 | NS-200-00020 | Cleaning Existing Ditches | 200 | LNFT | 11.03 | 2,206.00 | 7.00 | 1,400.00 | 24.00 | 4,800.00 |
| 0039 | NS-700-00240 | Special Guard Rail Anchor Section | 1 | EACH | 1,760.00 | 1,760.00 | 2,000.00 | 2,000.00 | 1,760.00 | 1,760.00 |
| 0040 | NS-713-00001 | Dynamic Message Sign Unit | 1 | EACH | 4,879.00 | 4,879.00 | 4,000.00 | 4,000.00 | 4,100.00 | 4,100.00 |
| 0041 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.1 | MILE | 412.50 | 41.25 | 450.00 | 45.00 | 36,421.00 | 3,642.10 |
| 0042 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 9,120 | INLF | 1.38 | 12,585.60 | 1.50 | 13,680.00 | 0.94 | 8,572.80 |
| CONTRACTOR TOTAL | 281,811.05 | 288,075.90 | 295,238.70 | |||||||