Bid Tabulations
Letting of
01/25/2012
LA DOTD Headquarters
| Lead Project: H.009219.6 | |
| Parish: St. James | |
| Routes: LA 3125 | |
| Description: LA 3125: EASTBOUND RIGHT TURN LANE AT LA 642 | |
| Type Const: CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $128,197.57 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $139,872.63 |
| 2 | 06276 | Barriere Construction Co., LLC | $155,762.70 |
| 3 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $162,530.00 |
| 4 | 12031 | R.J. Daigle & Sons Contractors, Inc | $165,341.32 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Byron E. Talbot Contractor, Inc. |
- 2 - Barriere Construction Co., LLC |
- 3 - F.G. Sullivan, Jr. Contractor LLC |
- 4 - R.J. Daigle & Sons Contractors, Inc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-38500 | Removal of Surfacing and Stablized Base | 578.2 | SQYD | 10.00 | 5,782.00 | 16.00 | 9,251.20 | 10.00 | 5,782.00 | 16.15 | 9,337.93 |
| 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 12,000.00 | 12,000.00 | 9,000.00 | 9,000.00 | 5,000.00 | 5,000.00 | 10,730.00 | 10,730.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 150 | CUYD | 17.25 | 2,587.50 | 20.00 | 3,000.00 | 20.00 | 3,000.00 | 15.35 | 2,302.50 |
| 0004 | 204-06-00100 | Temporary Silt Fencing | 600 | LNFT | 3.00 | 1,800.00 | 0.25 | 150.00 | 3.00 | 1,800.00 | 1.95 | 1,170.00 |
| 0005 | 302-02-02101 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 524.5 | SQYD | 18.00 | 9,441.00 | 36.00 | 18,882.00 | 20.00 | 10,490.00 | 19.00 | 9,965.50 |
| 0006 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 676.7 | SQYD | 25.35 | 17,154.35 | 45.00 | 30,451.50 | 30.00 | 20,301.00 | 32.60 | 22,060.42 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 258.9 | TON | 125.00 | 32,362.50 | 160.00 | 41,424.00 | 190.00 | 49,191.00 | 145.62 | 37,701.02 |
| 0008 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | 20,500.00 | 20,500.00 | 7,820.00 | 7,820.00 |
| 0009 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 200 | LNFT | 0.25 | 50.00 | 0.05 | 10.00 | 0.22 | 44.00 | 0.25 | 50.00 |
| 0010 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 24 | LNFT | 0.85 | 20.40 | 1.00 | 24.00 | 0.75 | 18.00 | 0.85 | 20.40 |
| 0011 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.053 | MILE | 1,075.00 | 56.98 | 1,000.00 | 53.00 | 1,000.00 | 53.00 | 1,100.00 | 58.30 |
| 0012 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.25 | MILE | 1,625.00 | 406.25 | 500.00 | 125.00 | 1,500.00 | 375.00 | 1,650.00 | 412.50 |
| 0013 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 50.00 | 400.00 | 5.00 | 40.00 | 45.00 | 360.00 | 50.00 | 400.00 |
| 0014 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 27,000.00 | 27,000.00 | 43,350.00 | 43,350.00 |
| 0015 | 731-02-00100 | Reflectorized Raised Pavement Markers | 10 | EACH | 5.75 | 57.50 | 15.00 | 150.00 | 5.25 | 52.50 | 5.75 | 57.50 |
| 0016 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 100 | LNFT | 2.20 | 220.00 | 3.00 | 300.00 | 2.00 | 200.00 | 2.20 | 220.00 |
| 0017 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 12 | LNFT | 5.45 | 65.40 | 12.00 | 144.00 | 5.00 | 60.00 | 5.50 | 66.00 |
| 0018 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.1 | MILE | 3,250.00 | 325.00 | 3,100.00 | 310.00 | 3,000.00 | 300.00 | 3,300.00 | 330.00 |
| 0019 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.065 | MILE | 3,250.00 | 211.25 | 3,200.00 | 208.00 | 3,000.00 | 195.00 | 3,300.00 | 214.50 |
| 0020 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 4 | EACH | 230.00 | 920.00 | 316.00 | 1,264.00 | 215.00 | 860.00 | 236.50 | 946.00 |
| 0021 | 736-02-00200 | Conduit with Conductors (1" HPDE, Sch 80) (W/2 - # 14 Conductors) | 300 | LNFT | 2.00 | 600.00 | 2.50 | 750.00 | 1.85 | 555.00 | 2.05 | 615.00 |
| 0022 | 736-09-00100 | Loop Detector | 100 | LNFT | 13.25 | 1,325.00 | 18.00 | 1,800.00 | 12.49 | 1,249.00 | 13.75 | 1,375.00 |
| 0023 | 736-10-00100 | Underground Junction Box (Type D) | 3 | EACH | 325.00 | 975.00 | 400.00 | 1,200.00 | 300.00 | 900.00 | 333.00 | 999.00 |
| 0024 | 736-12-01000 | Conductor (2c, Loop Lead in, imsa 50-2, #19 awg, Twisted Pair) | 250 | LNFT | 1.30 | 325.00 | 1.50 | 375.00 | 1.20 | 300.00 | 1.30 | 325.00 |
| 0025 | 739-01-00100 | Hydro-Seeding | 0.45 | ACRE | 2,500.00 | 1,125.00 | 3,000.00 | 1,350.00 | 2,250.00 | 1,012.50 | 2,475.00 | 1,113.75 |
| 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 | 5,500.00 | 5,500.00 |
| 0027 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 9,120 | INLF | 1.00 | 9,120.00 | 0.05 | 456.00 | 0.60 | 5,472.00 | 0.50 | 4,560.00 |
| 0028 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.1 | MILE | 425.00 | 42.50 | 450.00 | 45.00 | 4,600.00 | 460.00 | 36,410.00 | 3,641.00 |
| CONTRACTOR TOTAL | 139,872.63 | 155,762.70 | 162,530.00 | 165,341.32 | ||||||||