LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.009211.6
Parish: Orleans
Routes: I-10
Description: I-10: HIGH RISE BRIDGE RAIL MODIFICATIONS
Type Const: GUARD RAIL INSTALLATION AND RELATED WORK.
Estimated Construction Cost: $1,708,678.00
Maximum Number of Days Allowed for Construction: 9999
Calculated Daily User Cost: $5,000.00


RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 48896 Command Construction Industries LLC $1,588,232.00 60 $1,888,232.00
2 41747 Odum Services, L.P. $1,425,419.60 150 $2,175,419.60
3 00164 Traffic Solutions, Inc. $1,446,325.60 192 $2,406,325.60
4 34068 Alpha Service and Products, Inc. $1,662,614.20 157 $2,447,614.20
5 43371 RMD Holdings Ltd $2,613,888.74 219 $3,708,888.74


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Command Construction Industries LLC
- 2 -
Odum Services, L.P.
- 3 -
Traffic Solutions, Inc.
- 4 -
Alpha Service and Products, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions 1      LUMP 150,000.00 150,000.00 50,000.00 50,000.00 15,000.00 15,000.00 10,000.00 10,000.00
0002 202-02-14500 Removal of Guard Rail 738      LNFT 5.00 3,690.00 2.00 1,476.00 5.00 3,690.00 5.00 3,690.00
0003 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 46,052.8    LNFT 26.00 1,197,372.80 27.00 1,243,425.60 27.00 1,243,425.60 29.00 1,335,531.20
0004 704-03-00100 Blocked Out Guard Rail 425      LNFT 26.00 11,050.00 19.00 8,075.00 17.00 7,225.00 19.00 8,075.00
0005 704-07-00200 Guard Rail Bridge Attachments (Single Thrie Beam) 639.2    LNFT 26.00 16,619.20 40.00 25,568.00 50.00 31,960.00 40.00 25,568.00
0006 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 125      LNFT 100.00 12,500.00 61.00 7,625.00 55.00 6,875.00 55.00 6,875.00
0007 704-11-00100 Guard Rail End Treatment (Flared) 5      EACH 2,000.00 10,000.00 1,900.00 9,500.00 2,000.00 10,000.00 2,000.00 10,000.00
0008 705-09-00100 Rebuilt Fence 110      LNFT 50.00 5,500.00 20.00 2,200.00 160.00 17,600.00 95.00 10,450.00
0009 713-01-00100 Temporary Signs and Barricades 1      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 20,000.00 20,000.00 100,000.00 100,000.00
0010 727-01-00100 Mobilization 1      LUMP 150,000.00 150,000.00 50,000.00 50,000.00 70,000.00 70,000.00 130,000.00 130,000.00
0011 729-16-00300 Object Marker Assembly (Type 3) 5      EACH 100.00 500.00 110.00 550.00 70.00 350.00 85.00 425.00
0012 740-01-00100 Construction Layout 1      LUMP 1,000.00 1,000.00 5,000.00 5,000.00 17,000.00 17,000.00 8,000.00 8,000.00
0013 NS-713-00001 Dynamic Message Sign Unit 2      EACH 10,000.00 20,000.00 6,000.00 12,000.00 1,600.00 3,200.00 7,000.00 14,000.00
                         
    ITEM TOTAL (CONSTRUCTION BID)       1,588,232.00   1,425,419.60   1,446,325.60   1,662,614.20
    NUMBER OF DAYS BID AT $5000 PER DAY.       300,000.00   750,000.00   960,000.00   785,000.00
    TOTAL BID       1,888,232.00   2,175,419.60   2,406,325.60   2,447,614.20



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
RMD Holdings Ltd
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions 1      LUMP 275,325.00 275,325.00
0002 202-02-14500 Removal of Guard Rail 738      LNFT 5.50 4,059.00
0003 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 46,052.8    LNFT 34.20 1,575,005.76
0004 704-03-00100 Blocked Out Guard Rail 425      LNFT 25.30 10,752.50
0005 704-07-00200 Guard Rail Bridge Attachments (Single Thrie Beam) 639.2    LNFT 30.65 19,591.48
0006 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 125      LNFT 120.80 15,100.00
0007 704-11-00100 Guard Rail End Treatment (Flared) 5      EACH 2,145.00 10,725.00
0008 705-09-00100 Rebuilt Fence 110      LNFT 50.50 5,555.00
0009 713-01-00100 Temporary Signs and Barricades 1      LUMP 263,700.00 263,700.00
0010 727-01-00100 Mobilization 1      LUMP 238,000.00 238,000.00
0011 729-16-00300 Object Marker Assembly (Type 3) 5      EACH 235.00 1,175.00
0012 740-01-00100 Construction Layout 1      LUMP 167,000.00 167,000.00
0013 NS-713-00001 Dynamic Message Sign Unit 2      EACH 13,950.00 27,900.00
             
    ITEM TOTAL (CONSTRUCTION BID)       2,613,888.74
    NUMBER OF DAYS BID AT $5000 PER DAY.       1,095,000.00
    TOTAL BID       3,708,888.74