Bid Tabulations
Letting of
06/12/2013
LA DOTD Headquarters
| Lead Project: H.009163.6 | |
| Parish: St. Charles | |
| Routes: LA 48 | |
| Description: LA 48: WESCO ST. - US 61 | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $526,698.60 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $475,774.10 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $477,474.50 |
| 3 | 06487 | Huey Stockstill, Inc. | $532,200.30 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $535,541.70 |
| 5 | 00935 | Fleming Construction Co., LLC | $648,930.70 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Barber Bros. Contracting Co., L.L.C |
- 3 - Huey Stockstill, Inc. |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 42 | LNFT | 8.00 | 336.00 | 30.00 | 1,260.00 | 12.00 | 504.00 | 15.00 | 630.00 |
| 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 5 | EACH | 30.00 | 150.00 | 5.00 | 25.00 | 5.00 | 25.00 | 50.00 | 250.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 250 | CUYD | 15.00 | 3,750.00 | 25.00 | 6,250.00 | 15.00 | 3,750.00 | 40.00 | 10,000.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 2,951.7 | TON | 100.00 | 295,170.00 | 85.00 | 250,894.50 | 98.00 | 289,266.60 | 110.00 | 324,687.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 140 | TON | 145.00 | 20,300.00 | 90.00 | 12,600.00 | 180.00 | 25,200.00 | 150.00 | 21,000.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 27,070 | SQYD | 2.00 | 54,140.00 | 2.00 | 54,140.00 | 3.00 | 81,210.00 | 2.50 | 67,675.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,128 | CUYD | 20.00 | -22,560.00 | 0.00 | 0.00 | 15.00 | -16,920.00 | 15.00 | -16,920.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 50 | SQYD | 120.00 | 6,000.00 | 120.00 | 6,000.00 | 200.00 | 10,000.00 | 110.00 | 5,500.00 |
| 0009 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 900.00 | 900.00 | 2,000.00 | 2,000.00 | 1,200.00 | 1,200.00 | 1,500.00 | 1,500.00 |
| 0010 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 3 | EACH | 150.00 | 450.00 | 200.00 | 600.00 | 300.00 | 900.00 | 150.00 | 450.00 |
| 0011 | 707-03-00100 | Combination Concrete Curb and Gutter | 42 | LNFT | 55.00 | 2,310.00 | 80.00 | 3,360.00 | 35.00 | 1,470.00 | 70.00 | 2,940.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 27,000.00 | 27,000.00 |
| 0013 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 260 | LNFT | 0.05 | 13.00 | 0.25 | 65.00 | 0.20 | 52.00 | 0.22 | 57.20 |
| 0014 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 380 | LNFT | 0.10 | 38.00 | 0.85 | 323.00 | 0.70 | 266.00 | 0.75 | 285.00 |
| 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.64 | MILE | 150.00 | 2,196.00 | 100.00 | 1,464.00 | 550.00 | 8,052.00 | 20.00 | 292.80 |
| 0016 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 5.00 | 40.00 | 55.00 | 440.00 | 50.00 | 400.00 | 45.00 | 360.00 |
| 0017 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 5.00 | 20.00 | 60.00 | 240.00 | 40.00 | 160.00 | 45.00 | 180.00 |
| 0018 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 10.00 | 80.00 | 100.00 | 800.00 | 80.00 | 640.00 | 80.00 | 640.00 |
| 0019 | 717-01-00100 | Seeding | 24.3 | LB | 10.00 | 243.00 | 15.00 | 364.50 | 10.00 | 243.00 | 15.00 | 364.50 |
| 0020 | 718-01-00100 | Fertilizer | 810 | LB | 0.50 | 405.00 | 1.50 | 1,215.00 | 0.75 | 607.50 | 0.85 | 688.50 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 43,000.00 | 43,000.00 | 75,000.00 | 75,000.00 | 53,000.00 | 53,000.00 | 53,000.00 | 53,000.00 |
| 0022 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,250.00 | 1,250.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,000.00 | 1,200.00 | 1,200.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 700 | EACH | 5.50 | 3,850.00 | 6.00 | 4,200.00 | 6.00 | 4,200.00 | 5.50 | 3,850.00 |
| 0024 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 130 | LNFT | 1.75 | 227.50 | 2.00 | 260.00 | 1.50 | 195.00 | 1.50 | 195.00 |
| 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 190 | LNFT | 5.25 | 997.50 | 6.00 | 1,140.00 | 5.00 | 950.00 | 5.25 | 997.50 |
| 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.32 | MILE | 2,650.00 | 19,398.00 | 3,000.00 | 21,960.00 | 2,700.00 | 19,764.00 | 2,600.00 | 19,032.00 |
| 0027 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.021 | MILE | 3,100.00 | 65.10 | 3,500.00 | 73.50 | 3,200.00 | 67.20 | 3,200.00 | 67.20 |
| 0028 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 225.00 | 450.00 | 250.00 | 500.00 | 230.00 | 460.00 | 225.00 | 450.00 |
| 0029 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 225.00 | 450.00 | 250.00 | 500.00 | 230.00 | 460.00 | 225.00 | 450.00 |
| 0030 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 250.00 | 500.00 | 260.00 | 520.00 | 250.00 | 500.00 | 240.00 | 480.00 |
| 0031 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 450.00 | 1,800.00 | 500.00 | 2,000.00 | 500.00 | 2,000.00 | 425.00 | 1,700.00 |
| 0032 | 736-09-00100 | Loop Detector | 306 | LNFT | 16.50 | 5,049.00 | 20.00 | 6,120.00 | 28.00 | 8,568.00 | 14.00 | 4,284.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 8,200.00 | 8,200.00 | 1,500.00 | 1,500.00 |
| 0034 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,080 | INLF | 0.70 | 756.00 | 2.00 | 2,160.00 | 0.75 | 810.00 | 0.70 | 756.00 |
| CONTRACTOR TOTAL | 475,774.10 | 477,474.50 | 532,200.30 | 535,541.70 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Fleming Construction Co., LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 42 | LNFT | 20.00 | 840.00 |
| 0002 | 202-02-38300 | Removal of Sign and U-Channel Post | 5 | EACH | 45.00 | 225.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 250 | CUYD | 25.00 | 6,250.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 2,951.7 | TON | 125.00 | 368,962.50 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 140 | TON | 170.00 | 23,800.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 27,070 | SQYD | 3.50 | 94,745.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,128 | CUYD | 1.00 | -1,128.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 50 | SQYD | 150.00 | 7,500.00 |
| 0009 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,200.00 | 1,200.00 |
| 0010 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 3 | EACH | 1,000.00 | 3,000.00 |
| 0011 | 707-03-00100 | Combination Concrete Curb and Gutter | 42 | LNFT | 100.00 | 4,200.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0013 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 260 | LNFT | 0.22 | 57.20 |
| 0014 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 380 | LNFT | 0.75 | 285.00 |
| 0015 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.64 | MILE | 550.00 | 8,052.00 |
| 0016 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 45.00 | 360.00 |
| 0017 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 45.00 | 180.00 |
| 0018 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 8 | EACH | 80.00 | 640.00 |
| 0019 | 717-01-00100 | Seeding | 24.3 | LB | 10.00 | 243.00 |
| 0020 | 718-01-00100 | Fertilizer | 810 | LB | 2.00 | 1,620.00 |
| 0021 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 |
| 0022 | 729-19-00300 | Dead End Road Installations (Type C) | 1 | EACH | 1,100.00 | 1,100.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 700 | EACH | 5.25 | 3,675.00 |
| 0024 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 130 | LNFT | 1.50 | 195.00 |
| 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 190 | LNFT | 5.00 | 950.00 |
| 0026 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.32 | MILE | 2,500.00 | 18,300.00 |
| 0027 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.021 | MILE | 3,000.00 | 63.00 |
| 0028 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 215.00 | 430.00 |
| 0029 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 215.00 | 430.00 |
| 0030 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 225.00 | 450.00 |
| 0031 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 4 | EACH | 400.00 | 1,600.00 |
| 0032 | 736-09-00100 | Loop Detector | 306 | LNFT | 16.00 | 4,896.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 |
| 0034 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,080 | INLF | 0.75 | 810.00 |
| CONTRACTOR TOTAL | 648,930.70 | |||||