Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: H.009128.6 | |
| Parish: Rapides | |
| Routes: US 167 | |
| Description: US 167 FRONTAGE ROADS | |
| Type Const: PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK | |
| Estimated Construction Cost: $170,850.18 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 35849 | T.L. Construction LLC | $184,804.20 |
| 2 | 46404 | Tarver Land Development LLC | $201,299.92 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $222,438.00 |
| 4 | 05789 | D & J Construction Co., Inc. | $233,779.92 |
| 5 | 12487 | Diamond B Construction Co., L.L.C. | $307,772.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - T.L. Construction LLC |
- 2 - Tarver Land Development LLC |
- 3 - Gilchrist Construction Co. LLC |
- 4 - D & J Construction Co., Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 150 | CUYD | 110.00 | 16,500.00 | 82.00 | 12,300.00 | 85.00 | 12,750.00 | 95.00 | 14,250.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 1,050 | TON | 102.00 | 107,100.00 | 102.00 | 107,100.00 | 110.00 | 115,500.00 | 120.00 | 126,000.00 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 50 | TON | 150.00 | 7,500.00 | 185.00 | 9,250.00 | 215.00 | 10,750.00 | 300.00 | 15,000.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 300 | SQYD | 7.00 | 2,100.00 | 14.00 | 4,200.00 | 17.00 | 5,100.00 | 20.00 | 6,000.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -8 | CUYD | 0.10 | -0.80 | 0.01 | -0.08 | 10.00 | -80.00 | 0.01 | -0.08 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 60 | SQYD | 157.00 | 9,420.00 | 85.00 | 5,100.00 | 220.00 | 13,200.00 | 150.00 | 9,000.00 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,700.00 | 3,700.00 | 5,250.00 | 5,250.00 | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 |
| 0008 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.6 | MILE | 400.00 | 240.00 | 3,000.00 | 1,800.00 | 400.00 | 240.00 | 250.00 | 150.00 |
| 0009 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.5 | MILE | 510.00 | 255.00 | 3,000.00 | 1,500.00 | 620.00 | 310.00 | 500.00 | 250.00 |
| 0010 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.5 | MILE | 610.00 | 305.00 | 2,500.00 | 1,250.00 | 385.00 | 192.50 | 300.00 | 150.00 |
| 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 14,000.00 | 14,000.00 | 20,000.00 | 20,000.00 | 22,000.00 | 22,000.00 | 10,000.00 | 10,000.00 |
| 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 80 | EACH | 11.00 | 880.00 | 40.00 | 3,200.00 | 6.50 | 520.00 | 26.00 | 2,080.00 |
| 0013 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 40 | LNFT | 7.00 | 280.00 | 75.00 | 3,000.00 | 6.20 | 248.00 | 18.00 | 720.00 |
| 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.5 | MILE | 6,100.00 | 3,050.00 | 6,500.00 | 3,250.00 | 3,500.00 | 1,750.00 | 4,000.00 | 2,000.00 |
| 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.5 | MILE | 710.00 | 355.00 | 6,500.00 | 3,250.00 | 1,055.00 | 527.50 | 2,000.00 | 1,000.00 |
| 0016 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 2,600.00 | 1,300.00 | 2,500.00 | 1,250.00 | 3,100.00 | 1,550.00 | 5,000.00 | 2,500.00 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 3,200.00 | 3,200.00 | 6,900.00 | 6,900.00 | 3,000.00 | 3,000.00 |
| 0018 | NS-500-00280 | Surface Preparation | 1 | LUMP | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 |
| 0019 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,400 | INLF | 1.30 | 1,820.00 | 1.00 | 1,400.00 | 0.70 | 980.00 | 1.20 | 1,680.00 |
| CONTRACTOR TOTAL | 184,804.20 | 201,299.92 | 222,438.00 | 233,779.92 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Diamond B Construction Co., L.L.C. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 150 | CUYD | 200.00 | 30,000.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 1,050 | TON | 150.00 | 157,500.00 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 50 | TON | 300.00 | 15,000.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 300 | SQYD | 60.00 | 18,000.00 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -8 | CUYD | 1.00 | -8.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 60 | SQYD | 300.00 | 18,000.00 |
| 0007 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 |
| 0008 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.6 | MILE | 250.00 | 150.00 |
| 0009 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.5 | MILE | 700.00 | 350.00 |
| 0010 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.5 | MILE | 400.00 | 200.00 |
| 0011 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 |
| 0012 | 731-02-00100 | Reflectorized Raised Pavement Markers | 80 | EACH | 40.00 | 3,200.00 |
| 0013 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 40 | LNFT | 27.00 | 1,080.00 |
| 0014 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.5 | MILE | 5,200.00 | 2,600.00 |
| 0015 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.5 | MILE | 2,000.00 | 1,000.00 |
| 0016 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 2,500.00 | 1,250.00 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,500.00 | 3,500.00 |
| 0018 | NS-500-00280 | Surface Preparation | 1 | LUMP | 18,150.00 | 18,150.00 |
| 0019 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,400 | INLF | 2.00 | 2,800.00 |
| CONTRACTOR TOTAL | 307,772.00 | |||||