Bid Tabulations
Letting of
01/25/2012
LA DOTD Headquarters
| Lead Project: H.009124.6 | |
| Parish: Desoto | |
| Routes: La 513 | |
| Description: La 513: La 483 to La 346 | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK | |
| Estimated Construction Cost: $1,942,482.60 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 36374 | Best-Yet Builders, Llc | $1,973,122.75 |
| 2 | 08584 | Madden Contracting Co., Inc. | $2,026,828.52 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Best-Yet Builders, Llc |
- 2 - Madden Contracting Co., Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02040 | Removal of Asphalt Surfacing from Bridge Deck | 2,802 | SQYD | 2.75 | 7,705.50 | 0.10 | 280.20 |
| 0002 | 202-02-06040 | Removal of Concrete Box Headwall Remove Concrete Box Headwall | 4 | EACH | 500.00 | 2,000.00 | 500.00 | 2,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 8 | SQYD | 20.00 | 160.00 | 30.00 | 240.00 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) Remove pipe | 303.5 | LNFT | 25.00 | 7,587.50 | 35.00 | 10,622.50 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 3,000 | CUYD | 15.00 | 45,000.00 | 11.00 | 33,000.00 |
| 0006 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 51,044 | SQYD | 6.75 | 344,547.00 | 9.40 | 479,813.60 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 150 | CUYD | 50.00 | 7,500.00 | 50.00 | 7,500.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 9,454.2 | TON | 102.00 | 964,328.40 | 90.50 | 855,605.10 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 750 | TON | 107.65 | 80,737.50 | 50.00 | 37,500.00 |
| 0010 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 15,828 | GAL | 4.00 | 63,312.00 | 4.00 | 63,312.00 |
| 0011 | 507-02-00300 | Aggregate (S3) | 51,044 | SQYD | 1.50 | 76,566.00 | 2.00 | 102,088.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,565 | SQYD | 2.95 | 7,566.75 | 0.01 | 25.65 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -53 | CUYD | 0.10 | -5.30 | 0.01 | -0.53 |
| 0014 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 126 | LNFT | 68.00 | 8,568.00 | 160.00 | 20,160.00 |
| 0015 | 701-02-01000 | Cross Drain Pipe Arch (24" Equiv. RCPA) | 192 | LNFT | 83.00 | 15,936.00 | 175.00 | 33,600.00 |
| 0016 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 12 | LNFT | 40.00 | 480.00 | 180.00 | 2,160.00 |
| 0017 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 12 | LNFT | 68.00 | 816.00 | 200.00 | 2,400.00 |
| 0018 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,000.00 | 3,000.00 | 1,250.00 | 3,750.00 |
| 0019 | 712-04-00100 | Flexible Revetment | 176 | SQYD | 50.00 | 8,800.00 | 80.00 | 14,080.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 27,500.00 | 27,500.00 | 89,500.00 | 89,500.00 |
| 0021 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 13 | LNFT | 10.00 | 130.00 | 0.60 | 7.80 |
| 0022 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.66 | MILE | 800.00 | 6,128.00 | 325.00 | 2,489.50 |
| 0023 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 8.457 | MILE | 100.00 | 845.70 | 1.00 | 8.46 |
| 0024 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 35.913 | MILE | 200.00 | 7,182.60 | 1.00 | 35.91 |
| 0025 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 1,000 | EACH | 1.50 | 1,500.00 | 2.00 | 2,000.00 |
| 0026 | 716-01-00100 | Mulch (Vegetative) | 14.8 | TON | 900.00 | 13,320.00 | 600.00 | 8,880.00 |
| 0027 | 717-01-00100 | Seeding | 222 | LB | 7.50 | 1,665.00 | 10.00 | 2,220.00 |
| 0028 | 718-01-00100 | Fertilizer | 7,400 | LB | 0.50 | 3,700.00 | 1.00 | 7,400.00 |
| 0029 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 |
| 0030 | 726-01-00100 | Bedding Material | 35 | CUYD | 75.00 | 2,625.00 | 100.00 | 3,500.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 89,500.00 | 89,500.00 |
| 0032 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 100.00 | 200.00 | 75.00 | 150.00 |
| 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 506 | EACH | 4.00 | 2,024.00 | 4.50 | 2,277.00 |
| 0034 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 13 | LNFT | 20.00 | 260.00 | 5.00 | 65.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.971 | MILE | 2,900.00 | 34,715.90 | 2,600.00 | 31,124.60 |
| 0036 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.819 | MILE | 800.00 | 2,255.20 | 750.00 | 2,114.25 |
| 0037 | 735-01-00100 | Mailboxes | 20 | EACH | 50.00 | 1,000.00 | 1.00 | 20.00 |
| 0038 | 735-02-00100 | Mailbox Supports (Single) | 16 | EACH | 75.00 | 1,200.00 | 125.00 | 2,000.00 |
| 0039 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 100.00 | 200.00 | 175.00 | 350.00 |
| 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 32,500.00 | 32,500.00 | 25,000.00 | 25,000.00 |
| 0041 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 23.85 | CUYD | 500.00 | 11,925.00 | 1,000.00 | 23,850.00 |
| 0042 | 805-12-30020 | Reinforced Concrete Box Culverts (3' x 2') (Extension) | 8 | LNFT | 1,500.00 | 12,000.00 | 1,000.00 | 8,000.00 |
| 0043 | 805-12-34090 | Reinforced Concrete Box Culverts (10' x 4') (Extension) | 24 | LNFT | 1,500.00 | 36,000.00 | 1,000.00 | 24,000.00 |
| 0044 | 806-01-00100 | Deformed Reinforcing Steel | 1,733 | LB | 1.00 | 1,733.00 | 3.00 | 5,199.00 |
| 0045 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 136 | INLF | 3.00 | 408.00 | 3.68 | 500.48 |
| 0046 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,500.00 | 7,500.00 | 4,000.00 | 4,000.00 |
| 0047 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 2,000 | CUYD | 15.00 | 30,000.00 | 11.00 | 22,000.00 |
| CONTRACTOR TOTAL | 1,973,122.75 | 2,026,828.52 | ||||||