Bid Tabulations
Letting of
05/30/2012
LA DOTD Headquarters
| Lead Project: H.009116.6 | |
| Parish: East Baton Rouge | |
| Routes: LA 3246 | |
| Description: SIEGEN LANE IMPROVEMENTS AT I-10 | |
| Type Const: DRAINAGE STRUCTURES, CLASS II BASE COURSE, PORTLAND CEMENT CONCRETE PAVEMENT, LIME TREATMENT, AND RELATED WORK | |
| Estimated Construction Cost: $831,520.06 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 24901 | Hard Rock Construction LLC | $904,671.58 |
| 2 | 14807 | Richard Price Contracting Co, Llc | $1,051,493.69 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $1,068,120.44 |
| 4 | 48896 | Command Construction Industries LLC | $1,092,940.51 |
| 5 | 39462 | Jb James Construction Llc | $1,112,243.04 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Hard Rock Construction LLC |
- 2 - Richard Price Contracting Co, Llc |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Command Construction Industries LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 10,000.00 | 10,000.00 | 17,500.00 | 17,500.00 | 50,000.00 | 50,000.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,360.76 | LNFT | 2.00 | 2,721.52 | 10.00 | 13,607.60 | 7.75 | 10,545.89 | 10.00 | 13,607.60 |
| 0003 | 202-02-26300 | Removal of Median / Island | 898.99 | SQYD | 15.00 | 13,484.85 | 10.00 | 8,989.90 | 10.35 | 9,304.55 | 50.00 | 44,949.50 |
| 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 407.22 | SQYD | 15.00 | 6,108.30 | 10.00 | 4,072.20 | 11.85 | 4,825.56 | 50.00 | 20,361.00 |
| 0005 | 202-02-38220 | Removal of Sign Supports | 28 | EACH | 100.00 | 2,800.00 | 475.00 | 13,300.00 | 300.00 | 8,400.00 | 200.00 | 5,600.00 |
| 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 3 | EACH | 100.00 | 300.00 | 55.00 | 165.00 | 80.00 | 240.00 | 50.00 | 150.00 |
| 0007 | 202-02-38360 | Removal of Sign Faces | 40 | EACH | 80.00 | 3,200.00 | 109.00 | 4,360.00 | 92.00 | 3,680.00 | 100.00 | 4,000.00 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,893.25 | SQYD | 10.00 | 18,932.50 | 7.00 | 13,252.75 | 11.85 | 22,435.01 | 1.00 | 1,893.25 |
| 0009 | 203-01-00100 | General Excavation | 2,343.73 | CUYD | 10.00 | 23,437.30 | 11.50 | 26,952.90 | 16.00 | 37,499.68 | 1.00 | 2,343.73 |
| 0010 | 203-03-00100 | Embankment | 973.83 | CUYD | 5.00 | 4,869.15 | 22.00 | 21,424.26 | 22.00 | 21,424.26 | 1.00 | 973.83 |
| 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 21 | EACH | 10.00 | 210.00 | 45.00 | 945.00 | 15.00 | 315.00 | 20.00 | 420.00 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 150.00 | 300.00 | 240.00 | 480.00 | 300.00 | 600.00 | 300.00 | 600.00 |
| 0013 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 2,606.72 | SQYD | 20.00 | 52,134.40 | 29.00 | 75,594.88 | 29.00 | 75,594.88 | 25.00 | 65,168.00 |
| 0014 | 304-05-00100 | Lime Treatment (Type E) | 154.83 | TON | 50.00 | 7,741.50 | 400.00 | 61,932.00 | 300.00 | 46,449.00 | 50.00 | 7,741.50 |
| 0015 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 2,445.5 | SQYD | 100.00 | 244,550.00 | 83.00 | 202,976.50 | 80.85 | 197,718.68 | 85.00 | 207,867.50 |
| 0016 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 113 | LNFT | 55.00 | 6,215.00 | 41.25 | 4,661.25 | 50.00 | 5,650.00 | 100.00 | 11,300.00 |
| 0017 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 24 | LNFT | 300.00 | 7,200.00 | 158.00 | 3,792.00 | 225.00 | 5,400.00 | 400.00 | 9,600.00 |
| 0018 | 701-04-01140 | Storm Drain Pipe Arch (54" Equiv. RCPA) | 110 | LNFT | 200.00 | 22,000.00 | 165.00 | 18,150.00 | 180.00 | 19,800.00 | 400.00 | 44,000.00 |
| 0019 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,000.00 | 1,000.00 | 900.00 | 900.00 | 700.00 | 700.00 | 1,500.00 | 1,500.00 |
| 0020 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 2,000.00 | 2,000.00 | 1,700.00 | 1,700.00 | 1,900.00 | 1,900.00 | 4,000.00 | 4,000.00 |
| 0021 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 5,000.00 | 10,000.00 | 3,300.00 | 6,600.00 | 4,300.00 | 8,600.00 | 5,000.00 | 10,000.00 |
| 0022 | 702-03-00800 | Catch Basins (CB-09) | 2 | EACH | 5,000.00 | 10,000.00 | 2,500.00 | 5,000.00 | 4,000.00 | 8,000.00 | 4,000.00 | 8,000.00 |
| 0023 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,000.00 | 1,000.00 | 850.00 | 850.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 |
| 0024 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 302.65 | SQYD | 50.00 | 15,132.50 | 50.50 | 15,283.83 | 41.50 | 12,559.98 | 50.00 | 15,132.50 |
| 0025 | 707-01-00300 | Concrete Curb (Mountable) | 1,426.75 | LNFT | 10.00 | 14,267.50 | 5.50 | 7,847.13 | 12.00 | 17,121.00 | 10.00 | 14,267.50 |
| 0026 | 707-03-00100 | Combination Concrete Curb and Gutter | 8 | LNFT | 100.00 | 800.00 | 50.00 | 400.00 | 100.00 | 800.00 | 50.00 | 400.00 |
| 0027 | 711-04-00100 | Geotextile Fabric | 183.3 | SQYD | 3.00 | 549.90 | 6.50 | 1,191.45 | 2.00 | 366.60 | 3.00 | 549.90 |
| 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 1,000.00 | 1,000.00 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 | 2,700.00 | 2,700.00 | 6,500.00 | 6,500.00 | 1,000.00 | 1,000.00 |
| 0030 | 726-01-00100 | Bedding Material | 69.69 | CUYD | 50.00 | 3,484.50 | 70.00 | 4,878.30 | 65.00 | 4,529.85 | 150.00 | 10,453.50 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 46,000.00 | 46,000.00 | 35,000.00 | 35,000.00 | 120,000.00 | 120,000.00 |
| 0032 | 729-01-00100 | Sign (Type A) | 325 | SQFT | 28.00 | 9,100.00 | 27.40 | 8,905.00 | 30.00 | 9,750.00 | 20.00 | 6,500.00 |
| 0033 | 729-02-00100 | Sign (Type B) | 15.4 | SQFT | 33.00 | 508.20 | 32.88 | 506.35 | 35.00 | 539.00 | 30.00 | 462.00 |
| 0034 | 729-04-00100 | Sign (Type D) | 88 | SQFT | 35.00 | 3,080.00 | 27.40 | 2,411.20 | 37.00 | 3,256.00 | 25.00 | 2,200.00 |
| 0035 | 729-08-00100 | Mounting (2 1/2" Size Post) | 11 | EACH | 900.00 | 9,900.00 | 822.05 | 9,042.55 | 955.00 | 10,505.00 | 750.00 | 8,250.00 |
| 0036 | 729-08-00200 | Mounting (3 1/2" Size Post) | 7 | EACH | 950.00 | 6,650.00 | 1,041.27 | 7,288.89 | 1,010.00 | 7,070.00 | 950.00 | 6,650.00 |
| 0037 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 1,900.00 | 3,800.00 | 1,644.11 | 3,288.22 | 2,015.00 | 4,030.00 | 1,500.00 | 3,000.00 |
| 0038 | 730-01-00100 | Trenching and Backfilling | 800 | LNFT | 3.50 | 2,800.00 | 3.83 | 3,064.00 | 3.75 | 3,000.00 | 4.00 | 3,200.00 |
| 0039 | 730-02-01080 | Conduit with Conductors (PVC/HDPE) (1 1/2") 2#6, 1#8 Bare Solid Ground | 800 | LNFT | 6.00 | 4,800.00 | 6.26 | 5,008.00 | 6.05 | 4,840.00 | 6.00 | 4,800.00 |
| 0040 | 730-05-12100 | Light Pole (40') (Aluminum) (Single Arm) | 7 | EACH | 3,500.00 | 24,500.00 | 3,834.06 | 26,838.42 | 3,710.00 | 25,970.00 | 3,500.00 | 24,500.00 |
| 0041 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) | 7 | EACH | 350.00 | 2,450.00 | 385.82 | 2,700.74 | 375.00 | 2,625.00 | 400.00 | 2,800.00 |
| 0042 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 685.00 | 685.00 | 750.81 | 750.81 | 745.00 | 745.00 | 700.00 | 700.00 |
| 0043 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) Aluminum, single arm, 40' | 3 | EACH | 250.00 | 750.00 | 280.59 | 841.77 | 276.00 | 828.00 | 250.00 | 750.00 |
| 0044 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 3 | EACH | 400.00 | 1,200.00 | 445.00 | 1,335.00 | 435.00 | 1,305.00 | 400.00 | 1,200.00 |
| 0045 | 730-14-00100 | Removal and Disposal of Luminaires | 3 | EACH | 40.00 | 120.00 | 43.84 | 131.52 | 100.00 | 300.00 | 40.00 | 120.00 |
| 0046 | 730-16-00100 | Underground Junction Box (12" x 12") | 7 | EACH | 200.00 | 1,400.00 | 200.75 | 1,405.25 | 200.00 | 1,400.00 | 200.00 | 1,400.00 |
| 0047 | 730-19-00010 | Modular Breakaway Cable System | 7 | EACH | 2,000.00 | 14,000.00 | 1,989.37 | 13,925.59 | 2,200.00 | 15,400.00 | 2,000.00 | 14,000.00 |
| 0048 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 800 | LNFT | 1.00 | 800.00 | 0.62 | 496.00 | 0.65 | 520.00 | 0.50 | 400.00 |
| 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,030 | EACH | 5.00 | 5,150.00 | 5.75 | 5,922.50 | 5.60 | 5,768.00 | 7.00 | 7,210.00 |
| 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.457 | MILE | 2,850.00 | 7,002.45 | 3,114.90 | 7,653.31 | 3,025.00 | 7,432.43 | 2,800.00 | 6,879.60 |
| 0051 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.738 | MILE | 6,500.00 | 4,797.00 | 7,047.24 | 5,200.86 | 7,000.00 | 5,166.00 | 5,000.00 | 3,690.00 |
| 0052 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.216 | MILE | 25,000.00 | 5,400.00 | 26,640.60 | 5,754.37 | 26,500.00 | 5,724.00 | 22,000.00 | 4,752.00 |
| 0053 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.793 | MILE | 850.00 | 1,524.05 | 930.10 | 1,667.67 | 900.00 | 1,613.70 | 900.00 | 1,613.70 |
| 0054 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.195 | MILE | 1,250.00 | 243.75 | 1,334.92 | 260.31 | 1,325.00 | 258.38 | 2,000.00 | 390.00 |
| 0055 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.306 | MILE | 3,000.00 | 918.00 | 3,223.73 | 986.46 | 3,180.00 | 973.08 | 2,200.00 | 673.20 |
| 0056 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 29 | EACH | 215.00 | 6,235.00 | 235.66 | 6,834.14 | 230.00 | 6,670.00 | 250.00 | 7,250.00 |
| 0057 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 14 | EACH | 215.00 | 3,010.00 | 235.66 | 3,299.24 | 230.00 | 3,220.00 | 250.00 | 3,500.00 |
| 0058 | 732-05-00100 | Removal of Existing Markings | 0.428 | MILE | 5,000.00 | 2,140.00 | 5,377.92 | 2,301.75 | 5,300.00 | 2,268.40 | 3,000.00 | 1,284.00 |
| 0059 | 736-01-00100 | Trenching and Backfilling | 1,640 | LNFT | 3.50 | 5,740.00 | 3.83 | 6,281.20 | 3.75 | 6,150.00 | 4.00 | 6,560.00 |
| 0060 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 885 | LNFT | 18.00 | 15,930.00 | 19.73 | 17,461.05 | 20.00 | 17,700.00 | 20.00 | 17,700.00 |
| 0061 | 736-04-02000 | Signal Support (Pedestal Pole) | 2 | EACH | 1,250.00 | 2,500.00 | 1,367.90 | 2,735.80 | 1,325.00 | 2,650.00 | 1,300.00 | 2,600.00 |
| 0062 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 14 | EACH | 800.00 | 11,200.00 | 875.76 | 12,260.64 | 850.00 | 11,900.00 | 800.00 | 11,200.00 |
| 0063 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 11 | EACH | 800.00 | 8,800.00 | 882.34 | 9,705.74 | 855.00 | 9,405.00 | 800.00 | 8,800.00 |
| 0064 | 736-05-02040 | Signal Heads (3 Section, 12" Led Lens, R, RT. Y, RT. G) | 6 | EACH | 800.00 | 4,800.00 | 882.34 | 5,294.04 | 855.00 | 5,130.00 | 800.00 | 4,800.00 |
| 0065 | 736-06-00200 | Signal Service (Pedestal Required) | 2 | EACH | 1,500.00 | 3,000.00 | 1,715.35 | 3,430.70 | 1,700.00 | 3,400.00 | 2,000.00 | 4,000.00 |
| 0066 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 1 | EACH | 26,000.00 | 26,000.00 | 28,640.37 | 28,640.37 | 28,000.00 | 28,000.00 | 25,000.00 | 25,000.00 |
| 0067 | 736-08-00081 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Typ 6E Cab, Ex Bs) (F&I) | 1 | EACH | 24,000.00 | 24,000.00 | 26,486.59 | 26,486.59 | 26,000.00 | 26,000.00 | 25,000.00 | 25,000.00 |
| 0068 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 500.00 | 3,000.00 | 533.79 | 3,202.74 | 525.00 | 3,150.00 | 750.00 | 4,500.00 |
| 0069 | 736-10-00300 | Underground Junction Box (Type F) | 16 | EACH | 500.00 | 8,000.00 | 602.84 | 9,645.44 | 585.00 | 9,360.00 | 750.00 | 12,000.00 |
| 0070 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 1,000.00 | 2,000.00 | 1,107.03 | 2,214.06 | 1,100.00 | 2,200.00 | 1,200.00 | 2,400.00 |
| 0071 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 30 | LNFT | 1.50 | 45.00 | 1.64 | 49.20 | 2.00 | 60.00 | 1.00 | 30.00 |
| 0072 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 155 | LNFT | 2.50 | 387.50 | 2.79 | 432.45 | 3.00 | 465.00 | 2.00 | 310.00 |
| 0073 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 1,480 | LNFT | 4.50 | 6,660.00 | 4.82 | 7,133.60 | 5.00 | 7,400.00 | 5.00 | 7,400.00 |
| 0074 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 3,780 | LNFT | 1.20 | 4,536.00 | 1.29 | 4,876.20 | 1.50 | 5,670.00 | 1.00 | 3,780.00 |
| 0075 | 736-12-01040 | Conductor (2c, #14 awg) | 1,670 | LNFT | 1.20 | 2,004.00 | 1.29 | 2,154.30 | 1.50 | 2,505.00 | 2.00 | 3,340.00 |
| 0076 | 736-12-04000 | Conductor (6c, #14 awg) | 750 | LNFT | 1.50 | 1,125.00 | 1.70 | 1,275.00 | 1.75 | 1,312.50 | 2.00 | 1,500.00 |
| 0077 | 736-12-06000 | Conductor (10c, #14 awg) | 8,225 | LNFT | 2.00 | 16,450.00 | 2.17 | 17,848.25 | 2.30 | 18,917.50 | 2.00 | 16,450.00 |
| 0078 | 739-01-00100 | Hydro-Seeding | 0.66 | ACRE | 1,000.00 | 660.00 | 2,038.70 | 1,345.54 | 2,000.00 | 1,320.00 | 2,000.00 | 1,320.00 |
| 0079 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 12,465.82 | 12,465.82 | 7,500.00 | 7,500.00 | 1,000.00 | 1,000.00 |
| 0080 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 6 | INLF | 15.00 | 90.00 | 1.10 | 6.60 | 0.95 | 5.70 | 10.00 | 60.00 |
| 0081 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,113.57 | INLF | 3.00 | 3,340.71 | 1.10 | 1,224.93 | 1.60 | 1,781.71 | 10.00 | 11,135.70 |
| 0082 | NS-736-00001 | GPS | 2 | EACH | 1,000.00 | 2,000.00 | 1,041.27 | 2,082.54 | 1,500.00 | 3,000.00 | 1,000.00 | 2,000.00 |
| 0083 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 8,000.00 | 8,000.00 | 8,960.39 | 8,960.39 | 9,000.00 | 9,000.00 | 8,000.00 | 8,000.00 |
| 0084 | NS-736-00006 | Video Detection Camera | 3 | EACH | 2,000.00 | 6,000.00 | 2,246.95 | 6,740.85 | 2,500.00 | 7,500.00 | 2,000.00 | 6,000.00 |
| 0085 | NS-736-00007 | Video Detection Training | 1 | LUMP | 1.00 | 1.00 | 1.09 | 1.09 | 1.10 | 1.10 | 1.00 | 1.00 |
| 0086 | NS-P17-00032 | Support (Mast Arm Standard w/35 ft Arm | 2 | EACH | 10,000.00 | 20,000.00 | 11,179.94 | 22,359.88 | 11,500.00 | 23,000.00 | 12,000.00 | 24,000.00 |
| 0087 | NS-P17-00038 | Signal Support (Mast Arm Standard w/45 ft Arm | 1 | EACH | 13,000.00 | 13,000.00 | 14,358.54 | 14,358.54 | 14,000.00 | 14,000.00 | 14,000.00 | 14,000.00 |
| 0088 | NS-P17-00044 | Signal Support (Mast Arm Standard w/55 ft Arm | 2 | EACH | 20,000.00 | 40,000.00 | 21,784.44 | 43,568.88 | 21,500.00 | 43,000.00 | 21,000.00 | 42,000.00 |
| 0089 | NS-P17-00047 | Signal Support (Mast Arm Standard w/60 ft Arm | 1 | EACH | 20,000.00 | 20,000.00 | 22,853.11 | 22,853.11 | 22,500.00 | 22,500.00 | 22,000.00 | 22,000.00 |
| 0090 | NS-P17-00111 | Additional Mast Arm (35 foot Arm) | 2 | EACH | 4,000.00 | 8,000.00 | 4,285.64 | 8,571.28 | 4,500.00 | 9,000.00 | 4,000.00 | 8,000.00 |
| CONTRACTOR TOTAL | 904,671.58 | 1,051,493.69 | 1,068,120.44 | 1,092,940.51 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Jb James Construction Llc |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 27,500.00 | 27,500.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 1,360.76 | LNFT | 5.00 | 6,803.80 |
| 0003 | 202-02-26300 | Removal of Median / Island | 898.99 | SQYD | 10.00 | 8,989.90 |
| 0004 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 407.22 | SQYD | 20.00 | 8,144.40 |
| 0005 | 202-02-38220 | Removal of Sign Supports | 28 | EACH | 200.00 | 5,600.00 |
| 0006 | 202-02-38300 | Removal of Sign and U-Channel Post | 3 | EACH | 90.00 | 270.00 |
| 0007 | 202-02-38360 | Removal of Sign Faces | 40 | EACH | 120.00 | 4,800.00 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,893.25 | SQYD | 9.00 | 17,039.25 |
| 0009 | 203-01-00100 | General Excavation | 2,343.73 | CUYD | 5.00 | 11,718.65 |
| 0010 | 203-03-00100 | Embankment | 973.83 | CUYD | 23.00 | 22,398.09 |
| 0011 | 204-02-00100 | Temporary Hay or Straw Bales | 21 | EACH | 20.00 | 420.00 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 250.00 | 500.00 |
| 0013 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 2,606.72 | SQYD | 26.00 | 67,774.72 |
| 0014 | 304-05-00100 | Lime Treatment (Type E) | 154.83 | TON | 50.00 | 7,741.50 |
| 0015 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 2,445.5 | SQYD | 90.00 | 220,095.00 |
| 0016 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 113 | LNFT | 75.00 | 8,475.00 |
| 0017 | 701-03-01120 | Storm Drain Pipe (54" RCP) | 24 | LNFT | 125.00 | 3,000.00 |
| 0018 | 701-04-01140 | Storm Drain Pipe Arch (54" Equiv. RCPA) | 110 | LNFT | 150.00 | 16,500.00 |
| 0019 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,000.00 | 1,000.00 |
| 0020 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,500.00 | 3,500.00 |
| 0021 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 3,000.00 | 6,000.00 |
| 0022 | 702-03-00800 | Catch Basins (CB-09) | 2 | EACH | 5,500.00 | 11,000.00 |
| 0023 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 1,250.00 | 1,250.00 |
| 0024 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 302.65 | SQYD | 45.00 | 13,619.25 |
| 0025 | 707-01-00300 | Concrete Curb (Mountable) | 1,426.75 | LNFT | 5.00 | 7,133.75 |
| 0026 | 707-03-00100 | Combination Concrete Curb and Gutter | 8 | LNFT | 35.00 | 280.00 |
| 0027 | 711-04-00100 | Geotextile Fabric | 183.3 | SQYD | 2.00 | 366.60 |
| 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 100,000.00 | 100,000.00 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 500.00 | 500.00 |
| 0030 | 726-01-00100 | Bedding Material | 69.69 | CUYD | 75.00 | 5,226.75 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 110,000.00 | 110,000.00 |
| 0032 | 729-01-00100 | Sign (Type A) | 325 | SQFT | 28.00 | 9,100.00 |
| 0033 | 729-02-00100 | Sign (Type B) | 15.4 | SQFT | 33.00 | 508.20 |
| 0034 | 729-04-00100 | Sign (Type D) | 88 | SQFT | 35.00 | 3,080.00 |
| 0035 | 729-08-00100 | Mounting (2 1/2" Size Post) | 11 | EACH | 900.00 | 9,900.00 |
| 0036 | 729-08-00200 | Mounting (3 1/2" Size Post) | 7 | EACH | 950.00 | 6,650.00 |
| 0037 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 2 | EACH | 1,900.00 | 3,800.00 |
| 0038 | 730-01-00100 | Trenching and Backfilling | 800 | LNFT | 5.50 | 4,400.00 |
| 0039 | 730-02-01080 | Conduit with Conductors (PVC/HDPE) (1 1/2") 2#6, 1#8 Bare Solid Ground | 800 | LNFT | 6.00 | 4,800.00 |
| 0040 | 730-05-12100 | Light Pole (40') (Aluminum) (Single Arm) | 7 | EACH | 3,500.00 | 24,500.00 |
| 0041 | 730-07-05000 | Luminaire (250 Watt) (High PressureSodium) | 7 | EACH | 360.00 | 2,520.00 |
| 0042 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 2,000.00 | 2,000.00 |
| 0043 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) Aluminum, single arm, 40' | 3 | EACH | 300.00 | 900.00 |
| 0044 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 3 | EACH | 500.00 | 1,500.00 |
| 0045 | 730-14-00100 | Removal and Disposal of Luminaires | 3 | EACH | 50.00 | 150.00 |
| 0046 | 730-16-00100 | Underground Junction Box (12" x 12") | 7 | EACH | 200.00 | 1,400.00 |
| 0047 | 730-19-00010 | Modular Breakaway Cable System | 7 | EACH | 1,900.00 | 13,300.00 |
| 0048 | 730-22-00420 | Underground Marker Tape (6")(Detectable) | 800 | LNFT | 0.60 | 480.00 |
| 0049 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,030 | EACH | 5.25 | 5,407.50 |
| 0050 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.457 | MILE | 2,750.00 | 6,756.75 |
| 0051 | 732-02-02040 | Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) | 0.738 | MILE | 5,400.00 | 3,985.20 |
| 0052 | 732-02-02080 | Plastic Pavement Striping (Solid Line) (24" Width) (Thermoplastic 90 mil) | 0.216 | MILE | 22,500.00 | 4,860.00 |
| 0053 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.793 | MILE | 900.00 | 1,613.70 |
| 0054 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.195 | MILE | 2,100.00 | 409.50 |
| 0055 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.306 | MILE | 2,300.00 | 703.80 |
| 0056 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 29 | EACH | 200.00 | 5,800.00 |
| 0057 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 14 | EACH | 200.00 | 2,800.00 |
| 0058 | 732-05-00100 | Removal of Existing Markings | 0.428 | MILE | 2,600.00 | 1,112.80 |
| 0059 | 736-01-00100 | Trenching and Backfilling | 1,640 | LNFT | 4.00 | 6,560.00 |
| 0060 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 885 | LNFT | 19.00 | 16,815.00 |
| 0061 | 736-04-02000 | Signal Support (Pedestal Pole) | 2 | EACH | 1,300.00 | 2,600.00 |
| 0062 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 14 | EACH | 1,000.00 | 14,000.00 |
| 0063 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 11 | EACH | 1,000.00 | 11,000.00 |
| 0064 | 736-05-02040 | Signal Heads (3 Section, 12" Led Lens, R, RT. Y, RT. G) | 6 | EACH | 1,000.00 | 6,000.00 |
| 0065 | 736-06-00200 | Signal Service (Pedestal Required) | 2 | EACH | 1,800.00 | 3,600.00 |
| 0066 | 736-08-00071 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Type 6E Cabinet) (F&I) | 1 | EACH | 27,000.00 | 27,000.00 |
| 0067 | 736-08-00081 | Sig Cntrlr (TS-2, Type 2, w/Eth cap)(Typ 6E Cab, Ex Bs) (F&I) | 1 | EACH | 25,000.00 | 25,000.00 |
| 0068 | 736-10-00200 | Underground Junction Box (Type E) | 6 | EACH | 450.00 | 2,700.00 |
| 0069 | 736-10-00300 | Underground Junction Box (Type F) | 16 | EACH | 500.00 | 8,000.00 |
| 0070 | 736-10-00500 | Underground Junction Box (Type H) | 2 | EACH | 900.00 | 1,800.00 |
| 0071 | 736-11-00100 | Conduit (1/2" HDPE, Schedule 80) | 30 | LNFT | 5.00 | 150.00 |
| 0072 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 155 | LNFT | 5.00 | 775.00 |
| 0073 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 1,480 | LNFT | 6.00 | 8,880.00 |
| 0074 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 3,780 | LNFT | 1.50 | 5,670.00 |
| 0075 | 736-12-01040 | Conductor (2c, #14 awg) | 1,670 | LNFT | 1.30 | 2,171.00 |
| 0076 | 736-12-04000 | Conductor (6c, #14 awg) | 750 | LNFT | 1.60 | 1,200.00 |
| 0077 | 736-12-06000 | Conductor (10c, #14 awg) | 8,225 | LNFT | 2.00 | 16,450.00 |
| 0078 | 739-01-00100 | Hydro-Seeding | 0.66 | ACRE | 1,900.00 | 1,254.00 |
| 0079 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 |
| 0080 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 6 | INLF | 200.00 | 1,200.00 |
| 0081 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,113.57 | INLF | 2.50 | 2,783.93 |
| 0082 | NS-736-00001 | GPS | 2 | EACH | 950.00 | 1,900.00 |
| 0083 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 8,000.00 | 8,000.00 |
| 0084 | NS-736-00006 | Video Detection Camera | 3 | EACH | 2,000.00 | 6,000.00 |
| 0085 | NS-736-00007 | Video Detection Training | 1 | LUMP | 100.00 | 100.00 |
| 0086 | NS-P17-00032 | Support (Mast Arm Standard w/35 ft Arm | 2 | EACH | 10,500.00 | 21,000.00 |
| 0087 | NS-P17-00038 | Signal Support (Mast Arm Standard w/45 ft Arm | 1 | EACH | 13,000.00 | 13,000.00 |
| 0088 | NS-P17-00044 | Signal Support (Mast Arm Standard w/55 ft Arm | 2 | EACH | 19,900.00 | 39,800.00 |
| 0089 | NS-P17-00047 | Signal Support (Mast Arm Standard w/60 ft Arm | 1 | EACH | 20,750.00 | 20,750.00 |
| 0090 | NS-P17-00111 | Additional Mast Arm (35 foot Arm) | 2 | EACH | 4,000.00 | 8,000.00 |
| CONTRACTOR TOTAL | 1,112,243.04 | |||||