Bid Tabulations
Letting of
05/09/2012
LA DOTD Headquarters
| Lead Project: H.009114.6 | |
| Parish: St. Tammany | |
| Routes: US 190X | |
| Description: Boston Street Signals | |
| Type Const: TRAFFIC SIGNALIZATION AND RELATED WORK. | |
| Estimated Construction Cost: $759,846.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05473 | Jack B. Harper Electrical LLC | $591,892.00 |
| 2 | 08470 | Diamond Electrical Co., Inc. | $617,936.85 |
| 3 | 13082 | Wye Electric, Inc. | $623,417.25 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jack B. Harper Electrical LLC |
- 2 - Diamond Electrical Co., Inc. |
- 3 - Wye Electric, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 180 | SQYD | 20.00 | 3,600.00 | 30.00 | 5,400.00 | 20.00 | 3,600.00 |
| 0002 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 4,000.00 | 4,000.00 | 6,662.00 | 6,662.00 | 10,000.00 | 10,000.00 |
| 0003 | 706-01-00300 | Concrete Walk (6" Thick) | 104 | SQYD | 65.00 | 6,760.00 | 76.00 | 7,904.00 | 80.00 | 8,320.00 |
| 0004 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 43 | SQYD | 65.00 | 2,795.00 | 93.50 | 4,020.50 | 80.00 | 3,440.00 |
| 0005 | 706-04-00100 | Handicapped Curb Ramps | 15 | EACH | 2,200.00 | 33,000.00 | 1,228.00 | 18,420.00 | 2,600.00 | 39,000.00 |
| 0006 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 28,517.00 | 28,517.00 | 15,000.00 | 15,000.00 |
| 0007 | 727-01-00100 | Mobilization | 1 | LUMP | 56,500.00 | 56,500.00 | 24,871.00 | 24,871.00 | 25,000.00 | 25,000.00 |
| 0008 | 729-01-00100 | Sign (Type A) | 46 | SQFT | 85.00 | 3,910.00 | 59.00 | 2,714.00 | 50.00 | 2,300.00 |
| 0009 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 1,200 | LNFT | 3.30 | 3,960.00 | 1.75 | 2,100.00 | 4.00 | 4,800.00 |
| 0010 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 290 | LNFT | 9.90 | 2,871.00 | 5.84 | 1,693.60 | 12.00 | 3,480.00 |
| 0011 | 736-01-00100 | Trenching and Backfilling | 400 | LNFT | 5.90 | 2,360.00 | 8.25 | 3,300.00 | 3.00 | 1,200.00 |
| 0012 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 65 | LNFT | 13.00 | 845.00 | 40.00 | 2,600.00 | 15.00 | 975.00 |
| 0013 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 195 | LNFT | 16.00 | 3,120.00 | 28.00 | 5,460.00 | 18.00 | 3,510.00 |
| 0014 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 32 | EACH | 745.00 | 23,840.00 | 1,124.00 | 35,968.00 | 1,000.00 | 32,000.00 |
| 0015 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 8 | EACH | 1,172.00 | 9,376.00 | 1,682.00 | 13,456.00 | 2,000.00 | 16,000.00 |
| 0016 | 736-06-00600 | Signal Service (Existing Pole) | 4 | EACH | 995.00 | 3,980.00 | 1,895.00 | 7,580.00 | 800.00 | 3,200.00 |
| 0017 | 736-08-00091 | Sig Cntrlr (TS-2, Type 2)(Type 3E Cabinet)(Furnish & Install) | 3 | EACH | 17,815.00 | 53,445.00 | 19,267.00 | 57,801.00 | 20,000.00 | 60,000.00 |
| 0018 | 736-08-00111 | Sig Cntrlr (TS-2, Type 2)(Type 6E Cabinet)(Furnish & Install) | 1 | EACH | 23,370.00 | 23,370.00 | 24,795.00 | 24,795.00 | 25,000.00 | 25,000.00 |
| 0019 | 736-10-00300 | Underground Junction Box (Type F) | 16 | EACH | 346.00 | 5,536.00 | 498.00 | 7,968.00 | 350.00 | 5,600.00 |
| 0020 | 736-10-00500 | Underground Junction Box (Type H) | 4 | EACH | 775.00 | 3,100.00 | 1,028.00 | 4,112.00 | 700.00 | 2,800.00 |
| 0021 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 170 | LNFT | 4.50 | 765.00 | 1.50 | 255.00 | 2.00 | 340.00 |
| 0022 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 230 | LNFT | 6.50 | 1,495.00 | 2.60 | 598.00 | 3.00 | 690.00 |
| 0023 | 736-12-01001 | Conductor (2c, Loop Lead in, imsa 50-2, #14 awg, Twisted Pair) | 605 | LNFT | 1.10 | 665.50 | 1.20 | 726.00 | 1.00 | 605.00 |
| 0024 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 250 | LNFT | 7.80 | 1,950.00 | 2.40 | 600.00 | 3.50 | 875.00 |
| 0025 | 736-12-04000 | Conductor (6c, #14 awg) | 605 | LNFT | 1.45 | 877.25 | 1.65 | 998.25 | 2.00 | 1,210.00 |
| 0026 | 736-12-06000 | Conductor (10c, #14 awg) | 1,365 | LNFT | 1.85 | 2,525.25 | 2.50 | 3,412.50 | 2.25 | 3,071.25 |
| 0027 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 310 | INLF | 4.00 | 1,240.00 | 3.80 | 1,178.00 | 10.00 | 3,100.00 |
| 0028 | NS-736-00001 | GPS | 4 | EACH | 865.00 | 3,460.00 | 950.00 | 3,800.00 | 1,000.00 | 4,000.00 |
| 0029 | NS-736-00005 | Video Detection Cabinet Components | 4 | EACH | 7,445.00 | 29,780.00 | 7,666.00 | 30,664.00 | 7,000.00 | 28,000.00 |
| 0030 | NS-736-00006 | Video Detection Camera | 16 | EACH | 1,745.00 | 27,920.00 | 1,944.00 | 31,104.00 | 2,300.00 | 36,800.00 |
| 0031 | NS-736-00007 | Video Detection Training | 1 | LUMP | 1.00 | 1.00 | 266.00 | 266.00 | 1.00 | 1.00 |
| 0032 | NS-736-00009 | LED Pedestrian Signal Head | 8 | EACH | 550.00 | 4,400.00 | 1,261.00 | 10,088.00 | 1,000.00 | 8,000.00 |
| 0033 | NS-736-00011 | Pedestrian Push Buttons | 8 | EACH | 155.00 | 1,240.00 | 284.00 | 2,272.00 | 100.00 | 800.00 |
| 0034 | NS-P52-00002 | Signal Support Orn (Mast Arm Stnd w/ 20 Arm)(Furn & Install) | 2 | EACH | 13,770.00 | 27,540.00 | 12,642.00 | 25,284.00 | 13,000.00 | 26,000.00 |
| 0035 | NS-P52-00003 | Signal Support Orn (Mast Arm Stnd w/ 25 Arm)(Furn) | 1 | EACH | 12,125.00 | 12,125.00 | 12,610.00 | 12,610.00 | 10,000.00 | 10,000.00 |
| 0036 | NS-P52-00004 | Signal Support Orn (Mast Arm Stnd w/ 25 Arm)(Furn & Install) | 1 | EACH | 13,185.00 | 13,185.00 | 16,567.00 | 16,567.00 | 14,000.00 | 14,000.00 |
| 0037 | NS-P52-00006 | Signal Support Orn (Mast Arm Stnd w/ 30 Arm)(Furn & Install) | 2 | EACH | 15,285.00 | 30,570.00 | 17,025.00 | 34,050.00 | 15,000.00 | 30,000.00 |
| 0038 | NS-P52-00007 | Signal Support Orn (Mast Arm Stnd w/ 35 Arm)(Furn) | 2 | EACH | 13,560.00 | 27,120.00 | 14,140.00 | 28,280.00 | 12,100.00 | 24,200.00 |
| 0039 | NS-P52-00008 | Signal Support Orn (Mast Arm Stnd w/ 35 Arm)(Furn & Install) | 4 | EACH | 16,290.00 | 65,160.00 | 15,880.00 | 63,520.00 | 16,500.00 | 66,000.00 |
| 0040 | NS-P52-00009 | Signal Support Orn (Mast Arm Stnd w/ 40 Arm)(Furn) | 2 | EACH | 12,090.00 | 24,180.00 | 12,572.00 | 25,144.00 | 14,800.00 | 29,600.00 |
| 0041 | NS-P52-00010 | Signal Support Orn (Mast Arm Stnd w/ 40 Arm)(Furn & Install) | 2 | EACH | 14,820.00 | 29,640.00 | 16,528.00 | 33,056.00 | 19,000.00 | 38,000.00 |
| 0042 | NS-P52-00025 | Additional Mast Arm Ornamental (30 ft (6 m) Arm) (Furnish) | 1 | EACH | 3,495.00 | 3,495.00 | 3,370.00 | 3,370.00 | 2,900.00 | 2,900.00 |
| 0043 | NS-P52-00026 | Add Mast Arm Orn (30 ft (6 m) Arm) (Furnish & Install) | 4 | EACH | 3,795.00 | 15,180.00 | 3,912.00 | 15,648.00 | 4,400.00 | 17,600.00 |
| 0044 | NS-P52-00031 | Additional Mast Arm Ornamental (45 ft (6 m) Arm) (Furnish) | 1 | EACH | 4,355.00 | 4,355.00 | 4,280.00 | 4,280.00 | 5,400.00 | 5,400.00 |
| 0045 | NS-P52-00032 | Add Mast Arm Orn (45 ft (6 m) Arm) (Furnish & Install) | 1 | EACH | 4,655.00 | 4,655.00 | 4,824.00 | 4,824.00 | 7,000.00 | 7,000.00 |
| CONTRACTOR TOTAL | 591,892.00 | 617,936.85 | 623,417.25 | |||||||