Bid Tabulations
Letting of
10/10/2012
LA DOTD Headquarters
| Lead Project: H.009099.6 | |
| Parish: Iberville | |
| Routes: | |
| Description: LEVEE ACCESS ROAD BRIDGE OVER BORROW PIT | |
| Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE GIRDER SPAN BRIDGE AND RELATED WORK. | |
| Estimated Construction Cost: $1,146,074.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 39462 | Jb James Construction Llc | $1,104,354.40 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $1,302,701.70 |
| 3 | 34567 | James Construction Group LLC | $1,332,833.50 |
| 4 | 00044 | Guinn Construction, LLC | $1,607,704.50 |
| 5 | 55519 | Key, LLC Of Mississippi | $1,830,194.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jb James Construction Llc |
- 2 - Coastal Bridge Co., L.L.C. |
- 3 - James Construction Group LLC |
- 4 - Guinn Construction, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 15,000.00 | 15,000.00 |
| 0002 | 202-02-00010 | Removal of CATTLE GUARD | 1 | EACH | 100.00 | 100.00 | 500.00 | 500.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA. 15+95 - 22' X190' PRECAST CONCRETE BRIDGE WITH TIMBER PILES) | 1 | EACH | 40,000.00 | 40,000.00 | 67,000.00 | 67,000.00 | 110,000.00 | 110,000.00 | 50,000.00 | 50,000.00 |
| 0004 | 202-02-06000 | Removal of Concrete Approach Slabs | 47 | SQYD | 20.00 | 940.00 | 105.00 | 4,935.00 | 400.00 | 18,800.00 | 170.00 | 7,990.00 |
| 0005 | 202-02-12000 | Removal of Fence | 73 | LNFT | 1.00 | 73.00 | 13.00 | 949.00 | 3.50 | 255.50 | 10.00 | 730.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 84,000.00 | 84,000.00 | 20,000.00 | 20,000.00 |
| 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 7 | EACH | 20.00 | 140.00 | 20.00 | 140.00 | 50.00 | 350.00 | 10.00 | 70.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 150.00 | 450.00 | 200.00 | 600.00 | 220.00 | 660.00 | 100.00 | 300.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,028 | LNFT | 2.00 | 2,056.00 | 2.50 | 2,570.00 | 3.00 | 3,084.00 | 3.00 | 3,084.00 |
| 0010 | 302-01-00100 | Class II Base Course | 208.6 | CUYD | 110.00 | 22,946.00 | 105.00 | 21,903.00 | 150.00 | 31,290.00 | 85.00 | 17,731.00 |
| 0011 | 304-05-00100 | Lime Treatment (Type E) | 12.52 | TON | 150.00 | 1,878.00 | 800.00 | 10,016.00 | 300.00 | 3,756.00 | 750.00 | 9,390.00 |
| 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 96.3 | CUYD | 65.00 | 6,259.50 | 100.00 | 9,630.00 | 100.00 | 9,630.00 | 85.00 | 8,185.50 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 172.8 | TON | 172.00 | 29,721.60 | 260.00 | 44,928.00 | 195.00 | 33,696.00 | 200.00 | 34,560.00 |
| 0014 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 105.00 | 840.00 | 380.00 | 3,040.00 | 300.00 | 2,400.00 | 200.00 | 1,600.00 |
| 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 775.00 | 775.00 | 500.00 | 500.00 | 1,200.00 | 1,200.00 | 2,000.00 | 2,000.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 15.00 | 750.00 | 20.00 | 1,000.00 | 15.00 | 750.00 | 26.00 | 1,300.00 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 55.00 | 5,500.00 | 73.00 | 7,300.00 | 55.00 | 5,500.00 | 75.00 | 7,500.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,250.00 | 9,000.00 | 3,000.00 | 12,000.00 | 2,250.00 | 9,000.00 | 2,500.00 | 10,000.00 |
| 0019 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 62 | LNFT | 16.50 | 1,023.00 | 16.00 | 992.00 | 5.00 | 310.00 | 30.00 | 1,860.00 |
| 0020 | 709-01-00100 | Steel Cattle Guard | 1 | EACH | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 23,000.00 | 23,000.00 |
| 0021 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 408 | SQYD | 50.00 | 20,400.00 | 55.00 | 22,440.00 | 60.00 | 24,480.00 | 75.00 | 30,600.00 |
| 0022 | 711-04-00100 | Geotextile Fabric | 408 | SQYD | 3.30 | 1,346.40 | 4.00 | 1,632.00 | 5.00 | 2,040.00 | 5.00 | 2,040.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 26,000.00 | 26,000.00 | 3,500.00 | 3,500.00 | 2,500.00 | 2,500.00 | 6,500.00 | 6,500.00 |
| 0024 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 1,500.00 | 450.00 | 3,500.00 | 1,050.00 | 2,500.00 | 750.00 | 5,000.00 | 1,500.00 |
| 0025 | 717-01-00100 | Seeding | 8 | LB | 23.00 | 184.00 | 65.00 | 520.00 | 50.00 | 400.00 | 20.00 | 160.00 |
| 0026 | 718-01-00100 | Fertilizer | 170 | LB | 0.97 | 164.90 | 2.75 | 467.50 | 2.00 | 340.00 | 1.00 | 170.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 130,000.00 | 130,000.00 | 130,000.00 | 130,000.00 | 335,000.00 | 335,000.00 |
| 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 85.00 | 340.00 | 75.00 | 300.00 | 100.00 | 400.00 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 60,000.00 | 60,000.00 | 23,000.00 | 23,000.00 | 20,000.00 | 20,000.00 |
| 0030 | 804-01-00600 | Precast Concrete Piles (24") | 2,232 | LNFT | 91.00 | 203,112.00 | 110.00 | 245,520.00 | 90.00 | 200,880.00 | 160.00 | 357,120.00 |
| 0031 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 60,000.00 | 60,000.00 | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | 45,000.00 | 45,000.00 |
| 0032 | 804-09-00100 | Loading Test Piles | 1 | EACH | 8,500.00 | 8,500.00 | 17,000.00 | 17,000.00 | 5,000.00 | 5,000.00 | 1.00 | 1.00 |
| 0033 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 100.00 | 100.00 | 200.00 | 200.00 | 1,000.00 | 1,000.00 | 1.00 | 1.00 |
| 0034 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 100.00 | 100.00 | 200.00 | 200.00 | 1,000.00 | 1,000.00 | 1.00 | 1.00 |
| 0035 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 200.00 | 200.00 | 1,000.00 | 1,000.00 | 1.00 | 1.00 |
| 0036 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 100.00 | 500.00 | 600.00 | 3,000.00 | 1,000.00 | 5,000.00 | 1,500.00 | 7,500.00 |
| 0037 | 805-01-00700 | Class A Concrete (Bents) | 83.72 | CUYD | 1,250.00 | 104,650.00 | 1,600.00 | 133,952.00 | 1,250.00 | 104,650.00 | 1,250.00 | 104,650.00 |
| 0038 | 805-03-00100 | Class AA Concrete | 151.4 | CUYD | 975.00 | 147,615.00 | 1,000.00 | 151,400.00 | 1,100.00 | 166,540.00 | 1,150.00 | 174,110.00 |
| 0039 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 1,185 | LNFT | 52.00 | 61,620.00 | 66.00 | 78,210.00 | 60.00 | 71,100.00 | 130.00 | 154,050.00 |
| 0040 | 806-01-00100 | Deformed Reinforcing Steel | 62,560 | LB | 1.00 | 62,560.00 | 1.12 | 70,067.20 | 1.20 | 75,072.00 | 1.00 | 62,560.00 |
| 0041 | 807-08-00100 | Structural Metalwork (4058 LBS.) | 1 | LUMP | 16,000.00 | 16,000.00 | 12,500.00 | 12,500.00 | 20,000.00 | 20,000.00 | 16,000.00 | 16,000.00 |
| 0042 | 810-01-00100 | Concrete Railing (Standard Barrier) | 400 | LNFT | 65.00 | 26,000.00 | 63.00 | 25,200.00 | 55.00 | 22,000.00 | 70.00 | 28,000.00 |
| 0043 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY; 60 DEG CROSSING; CURVED; W/O ASPHALT) | 2 | EACH | 10,000.00 | 20,000.00 | 9,550.00 | 19,100.00 | 10,000.00 | 20,000.00 | 13,000.00 | 26,000.00 |
| 0044 | NS-804-00001 | Vibration Monitoring (INCLUDES INITIAL SITE SURVEY) | 24 | EACH | 300.00 | 7,200.00 | 550.00 | 13,200.00 | 400.00 | 9,600.00 | 835.00 | 20,040.00 |
| CONTRACTOR TOTAL | 1,104,354.40 | 1,302,701.70 | 1,332,833.50 | 1,607,704.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Key, LLC Of Mississippi |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 |
| 0002 | 202-02-00010 | Removal of CATTLE GUARD | 1 | EACH | 2,500.00 | 2,500.00 |
| 0003 | 202-02-04000 | Removal of Bridge (STA. 15+95 - 22' X190' PRECAST CONCRETE BRIDGE WITH TIMBER PILES) | 1 | EACH | 100,000.00 | 100,000.00 |
| 0004 | 202-02-06000 | Removal of Concrete Approach Slabs | 47 | SQYD | 100.00 | 4,700.00 |
| 0005 | 202-02-12000 | Removal of Fence | 73 | LNFT | 7.00 | 511.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 |
| 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 7 | EACH | 15.00 | 105.00 |
| 0008 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 150.00 | 450.00 |
| 0009 | 204-06-00100 | Temporary Silt Fencing | 1,028 | LNFT | 3.75 | 3,855.00 |
| 0010 | 302-01-00100 | Class II Base Course | 208.6 | CUYD | 125.00 | 26,075.00 |
| 0011 | 304-05-00100 | Lime Treatment (Type E) | 12.52 | TON | 450.00 | 5,634.00 |
| 0012 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 96.3 | CUYD | 50.00 | 4,815.00 |
| 0013 | 502-01-00100 | Superpave Asphaltic Concrete | 172.8 | TON | 195.00 | 33,696.00 |
| 0014 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 150.00 | 1,200.00 |
| 0015 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,500.00 | 1,500.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 50 | LNFT | 24.00 | 1,200.00 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 100.00 | 10,000.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,500.00 | 10,000.00 |
| 0019 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 62 | LNFT | 10.00 | 620.00 |
| 0020 | 709-01-00100 | Steel Cattle Guard | 1 | EACH | 25,000.00 | 25,000.00 |
| 0021 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 408 | SQYD | 60.00 | 24,480.00 |
| 0022 | 711-04-00100 | Geotextile Fabric | 408 | SQYD | 3.00 | 1,224.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,500.00 | 4,500.00 |
| 0024 | 716-01-00100 | Mulch (Vegetative) | 0.3 | TON | 2,500.00 | 750.00 |
| 0025 | 717-01-00100 | Seeding | 8 | LB | 50.00 | 400.00 |
| 0026 | 718-01-00100 | Fertilizer | 170 | LB | 2.00 | 340.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 375,000.00 | 375,000.00 |
| 0028 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 |
| 0030 | 804-01-00600 | Precast Concrete Piles (24") | 2,232 | LNFT | 150.00 | 334,800.00 |
| 0031 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 10,000.00 | 10,000.00 |
| 0032 | 804-09-00100 | Loading Test Piles | 1 | EACH | 25,000.00 | 25,000.00 |
| 0033 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 5,000.00 | 5,000.00 |
| 0034 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 5,000.00 | 5,000.00 |
| 0035 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 5,000.00 | 5,000.00 |
| 0036 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 1,500.00 | 7,500.00 |
| 0037 | 805-01-00700 | Class A Concrete (Bents) | 83.72 | CUYD | 1,400.00 | 117,208.00 |
| 0038 | 805-03-00100 | Class AA Concrete | 151.4 | CUYD | 1,500.00 | 227,100.00 |
| 0039 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 1,185 | LNFT | 95.00 | 112,575.00 |
| 0040 | 806-01-00100 | Deformed Reinforcing Steel | 62,560 | LB | 1.35 | 84,456.00 |
| 0041 | 807-08-00100 | Structural Metalwork (4058 LBS.) | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0042 | 810-01-00100 | Concrete Railing (Standard Barrier) | 400 | LNFT | 57.00 | 22,800.00 |
| 0043 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY; 60 DEG CROSSING; CURVED; W/O ASPHALT) | 2 | EACH | 11,400.00 | 22,800.00 |
| 0044 | NS-804-00001 | Vibration Monitoring (INCLUDES INITIAL SITE SURVEY) | 24 | EACH | 500.00 | 12,000.00 |
| CONTRACTOR TOTAL | 1,830,194.00 | |||||