Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.009064.6 | |
| Parish: Orleans | |
| Routes: | |
| Description: Hayne Blvd., Morrison Blvd., Mayo Blvd. - SRP | |
| Type Const: COLD PLANE ASPHALTIC CONCRETE, ASPHALTIC CONCRETE REPAIR, ASPHALTIC CONCRETE OVERLAY, STRIPING, CONCRETE ADA RAMPS | |
| Estimated Construction Cost: $3,384,473.95 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $5,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $2,404,791.96 | 90 | $2,854,791.96 |
| 2 | 49954 | Plus Concrete Inc. | $2,640,276.50 | 90 | $3,090,276.50 |
| 3 | 38610 | Three C's Properties Inc | $2,490,845.91 | 172 | $3,350,845.91 |
| 4 | 24901 | Hard Rock Construction LLC | $3,045,959.00 | 100 | $3,545,959.00 |
| 5 | 02179 | Boh Bros. Construction Co., LLC. | $3,141,818.00 | 180 | $4,041,818.00 |
| 6 | 52550 | Gibbs & Register Inc. | $3,856,919.50 | 300 | $5,356,919.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Plus Concrete Inc. |
- 3 - Three C's Properties Inc |
- 4 - Hard Rock Construction LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1.00 | 1.00 | 6,000.00 | 6,000.00 | 6,767.01 | 6,767.01 | 50,000.00 | 50,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 215.3 | SQYD | 18.00 | 3,875.40 | 24.00 | 5,167.20 | 11.70 | 2,519.01 | 10.00 | 2,153.00 |
| 0003 | 204-02-00100 | Temporary Hay or Straw Bales | 186 | EACH | 1.00 | 186.00 | 9.00 | 1,674.00 | 24.20 | 4,501.20 | 20.00 | 3,720.00 |
| 0004 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 2.00 | 600.00 | 1.50 | 450.00 | 4.39 | 1,317.00 | 2.00 | 600.00 |
| 0005 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,200 | CUYD | 25.00 | 55,000.00 | 18.00 | 39,600.00 | 34.09 | 74,998.00 | 0.00 | 0.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 7,027.2 | TON | 97.00 | 681,638.40 | 100.00 | 702,720.00 | 129.32 | 908,757.50 | 110.00 | 772,992.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 265.2 | TON | 220.00 | 58,344.00 | 150.00 | 39,780.00 | 233.20 | 61,844.64 | 220.00 | 58,344.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 55,125 | SQYD | 2.00 | 110,250.00 | 2.00 | 110,250.00 | 3.18 | 175,297.50 | 3.00 | 165,375.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,117.5 | SQYD | 80.00 | 89,400.00 | 90.00 | 100,575.00 | 95.40 | 106,609.50 | 130.00 | 145,275.00 |
| 0010 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 2,100 | LNFT | 3.00 | 6,300.00 | 1.75 | 3,675.00 | 3.71 | 7,791.00 | 2.00 | 4,200.00 |
| 0011 | 602-03-00100 | Cleaning and Sealing Random cracks | 1,100 | LNFT | 6.00 | 6,600.00 | 1.75 | 1,925.00 | 1.96 | 2,156.00 | 2.00 | 2,200.00 |
| 0012 | 706-01-00100 | Concrete Walk (4" Thick) | 400 | SQYD | 60.00 | 24,000.00 | 90.00 | 36,000.00 | 47.52 | 19,008.00 | 100.00 | 40,000.00 |
| 0013 | 706-01-00300 | Concrete Walk (6" Thick) | 100 | SQYD | 74.00 | 7,400.00 | 102.00 | 10,200.00 | 83.72 | 8,372.00 | 100.00 | 10,000.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 34,000.00 | 34,000.00 | 150,000.00 | 150,000.00 | 15,693.30 | 15,693.30 | 50,000.00 | 50,000.00 |
| 0015 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,500 | LNFT | 1.00 | 1,500.00 | 1.75 | 2,625.00 | 0.14 | 210.00 | 0.15 | 225.00 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 220,000.00 | 220,000.00 | 316,500.00 | 316,500.00 | 128,828.16 | 128,828.16 | 280,000.00 | 280,000.00 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 390 | EACH | 6.00 | 2,340.00 | 5.25 | 2,047.50 | 5.88 | 2,293.20 | 5.00 | 1,950.00 |
| 0018 | 732-01-02020 | Plastic Pavement Striping (6" Width) (Thermoplastic 125 mil) | 3,045 | LNFT | 1.00 | 3,045.00 | 0.85 | 2,588.25 | 0.90 | 2,740.50 | 1.00 | 3,045.00 |
| 0019 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 576 | LNFT | 2.75 | 1,584.00 | 2.50 | 1,440.00 | 2.65 | 1,526.40 | 3.00 | 1,728.00 |
| 0020 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.688 | MILE | 2,800.00 | 15,926.40 | 2,500.00 | 14,220.00 | 2,650.00 | 15,073.20 | 3,000.00 | 17,064.00 |
| 0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.023 | MILE | 900.00 | 2,720.70 | 850.00 | 2,569.55 | 901.00 | 2,723.72 | 1,000.00 | 3,023.00 |
| 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 46,671.52 | 46,671.52 | 25,000.00 | 25,000.00 |
| 0023 | NS-300-00060 | Geogrid | 2,200 | SQYD | 6.00 | 13,200.00 | 4.50 | 9,900.00 | 2.42 | 5,324.00 | 2.00 | 4,400.00 |
| 0024 | NS-SRP-00001 | ADA Ramps (Type A) | 42 | EACH | 2,100.00 | 88,200.00 | 2,100.00 | 88,200.00 | 2,153.07 | 90,428.94 | 2,000.00 | 84,000.00 |
| 0025 | NS-SRP-00002 | ADA Ramps (Type B) | 11 | EACH | 2,200.00 | 24,200.00 | 1,800.00 | 19,800.00 | 2,013.56 | 22,149.16 | 2,000.00 | 22,000.00 |
| 0026 | NS-SRP-00003 | Adjust (Manhole with Rings) | 47 | EACH | 120.00 | 5,640.00 | 450.00 | 21,150.00 | 252.23 | 11,854.81 | 300.00 | 14,100.00 |
| 0027 | NS-SRP-00004 | Adjust (Manhole) | 33 | EACH | 600.00 | 19,800.00 | 750.00 | 24,750.00 | 403.67 | 13,321.11 | 1,500.00 | 49,500.00 |
| 0028 | NS-SRP-00005 | Adjust Catch Basin (Type A) | 9 | EACH | 850.00 | 7,650.00 | 750.00 | 6,750.00 | 4,624.66 | 41,621.94 | 2,000.00 | 18,000.00 |
| 0029 | NS-SRP-00006 | Adjust Catch Basin (Type C) | 8 | EACH | 1,300.00 | 10,400.00 | 3,300.00 | 26,400.00 | 871.88 | 6,975.04 | 3,000.00 | 24,000.00 |
| 0030 | NS-SRP-00007 | Adjust Drop Inlet | 57 | EACH | 800.00 | 45,600.00 | 750.00 | 42,750.00 | 646.47 | 36,848.79 | 1,500.00 | 85,500.00 |
| 0031 | NS-SRP-00008 | Adjust Manhole SWB PWR | 8 | EACH | 1,550.00 | 12,400.00 | 1,800.00 | 14,400.00 | 868.78 | 6,950.24 | 2,000.00 | 16,000.00 |
| 0032 | NS-SRP-00009 | Adjust Frame and Cover (Rectangular) | 24 | EACH | 1,000.00 | 24,000.00 | 750.00 | 18,000.00 | 1,031.22 | 24,749.28 | 1,500.00 | 36,000.00 |
| 0033 | NS-SRP-00012 | Concrete Pavement Repair (18.0 sq. yd. and Under) | 335.5 | SQYD | 190.50 | 63,912.75 | 120.00 | 40,260.00 | 132.99 | 44,618.15 | 150.00 | 50,325.00 |
| 0034 | NS-SRP-00013 | Concrete Pavement Repair (18.1 sq. yd. to 48.0 sq. yd.) | 1,757.2 | SQYD | 123.50 | 217,014.20 | 110.00 | 193,292.00 | 76.50 | 134,425.80 | 150.00 | 263,580.00 |
| 0035 | NS-SRP-00014 | Concrete Pavement Repair (48.1 sq. yd. and Over) | 4,041.7 | SQYD | 100.65 | 406,797.11 | 100.00 | 404,170.00 | 96.19 | 388,771.12 | 150.00 | 606,255.00 |
| 0036 | NS-SRP-00016 | Concrete Curb (Barrier) (Doweled) | 2,168 | LNFT | 22.70 | 49,213.60 | 24.00 | 52,032.00 | 9.03 | 19,577.04 | 15.00 | 32,520.00 |
| 0037 | NS-SRP-00017 | Concrete Curb (Mountable) (Doweled) | 1,859 | LNFT | 22.60 | 42,013.40 | 24.00 | 44,616.00 | 10.27 | 19,091.93 | 15.00 | 27,885.00 |
| 0038 | NS-SRP-00029 | Project Signs (SRP) | 3 | EACH | 1,000.00 | 3,000.00 | 1,000.00 | 3,000.00 | 795.00 | 2,385.00 | 1,000.00 | 3,000.00 |
| 0039 | NS-SRP-00030 | Recon of Concrete Curb and Gutterbottom (Barrier Curb) | 60 | LNFT | 59.00 | 3,540.00 | 30.00 | 1,800.00 | 52.22 | 3,133.20 | 100.00 | 6,000.00 |
| 0040 | NS-SRP-00044 | Tree Protection | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 1,590.00 | 1,590.00 | 8,000.00 | 8,000.00 |
| 0041 | NS-SRP-00045 | Tree Trimming | 1 | LUMP | 6,000.00 | 6,000.00 | 7,500.00 | 7,500.00 | 7,950.00 | 7,950.00 | 35,000.00 | 35,000.00 |
| 0042 | NS-SRP-00046 | Root Pruning and Trenching | 1 | LUMP | 2,500.00 | 2,500.00 | 7,500.00 | 7,500.00 | 1,590.00 | 1,590.00 | 9,000.00 | 9,000.00 |
| 0043 | NS-SRP-00047 | Hnd Frm and Pour In-Plc Cncr Crb Wthn Lim of the Tree Drpln | 400 | LNFT | 25.00 | 10,000.00 | 30.00 | 12,000.00 | 27.49 | 10,996.00 | 30.00 | 12,000.00 |
| 0044 | NS-SRP-00048 | Gravel Bed and Filter Cloth Over Tree Roots | 200 | SQYD | 25.00 | 5,000.00 | 10.00 | 2,000.00 | 3.98 | 796.00 | 10.00 | 2,000.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 2,404,791.96 | 2,640,276.50 | 2,490,845.91 | 3,045,959.00 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 450,000.00 | 450,000.00 | 860,000.00 | 500,000.00 | ||||||||
| TOTAL BID | 2,854,791.96 | 3,090,276.50 | 3,350,845.91 | 3,545,959.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Boh Bros. Construction Co., LLC. |
- 6 - Gibbs & Register Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 45,000.00 | 45,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 215.3 | SQYD | 12.00 | 2,583.60 | 25.00 | 5,382.50 |
| 0003 | 204-02-00100 | Temporary Hay or Straw Bales | 186 | EACH | 15.00 | 2,790.00 | 40.00 | 7,440.00 |
| 0004 | 204-06-00100 | Temporary Silt Fencing | 300 | LNFT | 5.00 | 1,500.00 | 5.00 | 1,500.00 |
| 0005 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,200 | CUYD | 45.00 | 99,000.00 | 75.00 | 165,000.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 7,027.2 | TON | 100.00 | 702,720.00 | 115.00 | 808,128.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 265.2 | TON | 150.00 | 39,780.00 | 230.00 | 60,996.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 55,125 | SQYD | 2.00 | 110,250.00 | 5.00 | 275,625.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,117.5 | SQYD | 100.00 | 111,750.00 | 140.00 | 156,450.00 |
| 0010 | 602-02-00100 | Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints | 2,100 | LNFT | 3.00 | 6,300.00 | 3.00 | 6,300.00 |
| 0011 | 602-03-00100 | Cleaning and Sealing Random cracks | 1,100 | LNFT | 4.00 | 4,400.00 | 4.00 | 4,400.00 |
| 0012 | 706-01-00100 | Concrete Walk (4" Thick) | 400 | SQYD | 65.00 | 26,000.00 | 70.00 | 28,000.00 |
| 0013 | 706-01-00300 | Concrete Walk (6" Thick) | 100 | SQYD | 80.00 | 8,000.00 | 85.00 | 8,500.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 250,000.00 | 250,000.00 | 85,000.00 | 85,000.00 |
| 0015 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 1,500 | LNFT | 0.15 | 225.00 | 1.00 | 1,500.00 |
| 0016 | 727-01-00100 | Mobilization | 1 | LUMP | 275,000.00 | 275,000.00 | 365,000.00 | 365,000.00 |
| 0017 | 731-02-00100 | Reflectorized Raised Pavement Markers | 390 | EACH | 6.00 | 2,340.00 | 6.00 | 2,340.00 |
| 0018 | 732-01-02020 | Plastic Pavement Striping (6" Width) (Thermoplastic 125 mil) | 3,045 | LNFT | 0.90 | 2,740.50 | 1.00 | 3,045.00 |
| 0019 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 576 | LNFT | 3.00 | 1,728.00 | 3.00 | 1,728.00 |
| 0020 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 5.688 | MILE | 2,650.00 | 15,073.20 | 3,000.00 | 17,064.00 |
| 0021 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.023 | MILE | 900.00 | 2,720.70 | 1,000.00 | 3,023.00 |
| 0022 | 740-01-00100 | Construction Layout | 1 | LUMP | 73,000.00 | 73,000.00 | 80,000.00 | 80,000.00 |
| 0023 | NS-300-00060 | Geogrid | 2,200 | SQYD | 2.50 | 5,500.00 | 5.00 | 11,000.00 |
| 0024 | NS-SRP-00001 | ADA Ramps (Type A) | 42 | EACH | 2,600.00 | 109,200.00 | 1,500.00 | 63,000.00 |
| 0025 | NS-SRP-00002 | ADA Ramps (Type B) | 11 | EACH | 2,600.00 | 28,600.00 | 1,800.00 | 19,800.00 |
| 0026 | NS-SRP-00003 | Adjust (Manhole with Rings) | 47 | EACH | 110.00 | 5,170.00 | 500.00 | 23,500.00 |
| 0027 | NS-SRP-00004 | Adjust (Manhole) | 33 | EACH | 900.00 | 29,700.00 | 1,000.00 | 33,000.00 |
| 0028 | NS-SRP-00005 | Adjust Catch Basin (Type A) | 9 | EACH | 475.00 | 4,275.00 | 1,500.00 | 13,500.00 |
| 0029 | NS-SRP-00006 | Adjust Catch Basin (Type C) | 8 | EACH | 475.00 | 3,800.00 | 2,200.00 | 17,600.00 |
| 0030 | NS-SRP-00007 | Adjust Drop Inlet | 57 | EACH | 475.00 | 27,075.00 | 1,000.00 | 57,000.00 |
| 0031 | NS-SRP-00008 | Adjust Manhole SWB PWR | 8 | EACH | 1,500.00 | 12,000.00 | 1,800.00 | 14,400.00 |
| 0032 | NS-SRP-00009 | Adjust Frame and Cover (Rectangular) | 24 | EACH | 1,000.00 | 24,000.00 | 1,100.00 | 26,400.00 |
| 0033 | NS-SRP-00012 | Concrete Pavement Repair (18.0 sq. yd. and Under) | 335.5 | SQYD | 190.00 | 63,745.00 | 275.00 | 92,262.50 |
| 0034 | NS-SRP-00013 | Concrete Pavement Repair (18.1 sq. yd. to 48.0 sq. yd.) | 1,757.2 | SQYD | 180.00 | 316,296.00 | 225.00 | 395,370.00 |
| 0035 | NS-SRP-00014 | Concrete Pavement Repair (48.1 sq. yd. and Over) | 4,041.7 | SQYD | 130.00 | 525,421.00 | 165.00 | 666,880.50 |
| 0036 | NS-SRP-00016 | Concrete Curb (Barrier) (Doweled) | 2,168 | LNFT | 30.00 | 65,040.00 | 60.00 | 130,080.00 |
| 0037 | NS-SRP-00017 | Concrete Curb (Mountable) (Doweled) | 1,859 | LNFT | 30.00 | 55,770.00 | 60.00 | 111,540.00 |
| 0038 | NS-SRP-00029 | Project Signs (SRP) | 3 | EACH | 675.00 | 2,025.00 | 55.00 | 165.00 |
| 0039 | NS-SRP-00030 | Recon of Concrete Curb and Gutterbottom (Barrier Curb) | 60 | LNFT | 105.00 | 6,300.00 | 100.00 | 6,000.00 |
| 0040 | NS-SRP-00044 | Tree Protection | 1 | LUMP | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0041 | NS-SRP-00045 | Tree Trimming | 1 | LUMP | 43,000.00 | 43,000.00 | 5,000.00 | 5,000.00 |
| 0042 | NS-SRP-00046 | Root Pruning and Trenching | 1 | LUMP | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 |
| 0043 | NS-SRP-00047 | Hnd Frm and Pour In-Plc Cncr Crb Wthn Lim of the Tree Drpln | 400 | LNFT | 100.00 | 40,000.00 | 60.00 | 24,000.00 |
| 0044 | NS-SRP-00048 | Gravel Bed and Filter Cloth Over Tree Roots | 200 | SQYD | 55.00 | 11,000.00 | 25.00 | 5,000.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 3,141,818.00 | 3,856,919.50 | ||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 900,000.00 | 1,500,000.00 | ||||||
| TOTAL BID | 4,041,818.00 | 5,356,919.50 | ||||||