Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.009063.6 | |
| Parish: Orleans | |
| Routes: | |
| Description: Alvar Street, Forstall Street and Tupelo Street SRP | |
| Type Const: COLD PLANE ASPHALTIC CONCRETE, ASPHALTIC CONCRETE REPAIR, ASPHALTIC CONCRETE OVERLAY, STRIPING, CONCRETE ADA RAMPS | |
| Estimated Construction Cost: $3,174,421.56 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $5,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $2,371,344.21 | 90 | $2,821,344.21 |
| 2 | 00935 | Fleming Construction Co., Inc. | $2,484,352.28 | 165 | $3,309,352.28 |
| 3 | 49954 | Plus Concrete Inc. | $3,131,409.79 | 120 | $3,731,409.79 |
| 4 | 24901 | Hard Rock Construction LLC | $3,165,082.84 | 126 | $3,795,082.84 |
| 5 | 02179 | Boh Bros. Construction Co., LLC. | $2,950,564.56 | 170 | $3,800,564.56 |
| 6 | 52550 | Gibbs & Register Inc. | $4,011,035.02 | 300 | $5,511,035.02 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Fleming Construction Co., Inc. |
- 3 - Plus Concrete Inc. |
- 4 - Hard Rock Construction LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1.00 | 1.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 100,000.00 | 100,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 336.03 | SQYD | 14.00 | 4,704.42 | 15.00 | 5,040.45 | 21.00 | 7,056.63 | 10.00 | 3,360.30 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 3,100.00 | 3,100.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 180 | EACH | 5.00 | 900.00 | 15.00 | 2,700.00 | 21.00 | 3,780.00 | 150.00 | 27,000.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 0.50 | 750.00 | 1.50 | 2,250.00 | 2.40 | 3,600.00 | 1.00 | 1,500.00 |
| 0006 | 302-02-03000 | Class II Base Course (8" Thick) | 2,577.49 | SQYD | 18.00 | 46,394.82 | 20.00 | 51,549.80 | 45.00 | 115,987.05 | 20.00 | 51,549.80 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 145 | CUYD | 35.00 | 5,075.00 | 40.00 | 5,800.00 | 45.00 | 6,525.00 | 0.00 | 0.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 6,652.59 | TON | 90.00 | 598,733.10 | 105.00 | 698,521.95 | 120.00 | 798,310.80 | 115.00 | 765,047.85 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 396.28 | TON | 199.00 | 78,859.72 | 130.00 | 51,516.40 | 150.00 | 59,442.00 | 240.00 | 95,107.20 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 41,153.32 | SQYD | 2.00 | 82,306.64 | 3.50 | 144,036.62 | 3.00 | 123,459.96 | 3.00 | 123,459.96 |
| 0011 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 2,577.49 | SQYD | 72.00 | 185,579.28 | 90.00 | 231,974.10 | 90.00 | 231,974.10 | 150.00 | 386,623.50 |
| 0012 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,728 | LNFT | 2.00 | 7,456.00 | 2.70 | 10,065.60 | 1.75 | 6,524.00 | 2.00 | 7,456.00 |
| 0013 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 7,391 | LNFT | 2.00 | 14,782.00 | 2.70 | 19,955.70 | 1.75 | 12,934.25 | 2.00 | 14,782.00 |
| 0014 | 602-03-00100 | Cleaning and Sealing Random cracks | 650 | LNFT | 5.00 | 3,250.00 | 3.90 | 2,535.00 | 1.75 | 1,137.50 | 2.00 | 1,300.00 |
| 0015 | 602-08-00100 | Grinding Concrete Pavement | 956.67 | SQYD | 15.00 | 14,350.05 | 20.00 | 19,133.40 | 12.00 | 11,480.04 | 10.00 | 9,566.70 |
| 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 336.03 | SQYD | 60.00 | 20,161.80 | 65.00 | 21,841.95 | 90.00 | 30,242.70 | 100.00 | 33,603.00 |
| 0017 | 707-01-00200 | Concrete Curb (Barrier) | 860 | LNFT | 22.80 | 19,608.00 | 10.00 | 8,600.00 | 24.00 | 20,640.00 | 15.00 | 12,900.00 |
| 0018 | 707-01-00300 | Concrete Curb (Mountable) | 1,532 | LNFT | 22.25 | 34,087.00 | 10.00 | 15,320.00 | 24.00 | 36,768.00 | 15.00 | 22,980.00 |
| 0019 | 707-03-00100 | Combination Concrete Curb and Gutter | 374 | LNFT | 63.75 | 23,842.50 | 30.00 | 11,220.00 | 30.00 | 11,220.00 | 40.00 | 14,960.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 50,000.00 | 50,000.00 | 228,000.00 | 228,000.00 | 115,000.00 | 115,000.00 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2 | MILE | 250.00 | 500.00 | 2,100.00 | 4,200.00 | 1,200.00 | 2,400.00 | 700.00 | 1,400.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 235,000.00 | 235,000.00 | 200,000.00 | 200,000.00 | 412,000.00 | 412,000.00 | 300,000.00 | 300,000.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 900 | EACH | 6.00 | 5,400.00 | 5.00 | 4,500.00 | 5.25 | 4,725.00 | 5.00 | 4,500.00 |
| 0024 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 15,900 | LNFT | 0.60 | 9,540.00 | 0.62 | 9,858.00 | 0.60 | 9,540.00 | 0.60 | 9,540.00 |
| 0025 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 4,020 | LNFT | 1.00 | 4,020.00 | 0.90 | 3,618.00 | 0.85 | 3,417.00 | 0.85 | 3,417.00 |
| 0026 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 798 | LNFT | 3.00 | 2,394.00 | 2.50 | 1,995.00 | 2.50 | 1,995.00 | 2.50 | 1,995.00 |
| 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 48 | LNFT | 10.00 | 480.00 | 5.00 | 240.00 | 4.50 | 216.00 | 4.50 | 216.00 |
| 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.137 | MILE | 950.00 | 2,980.15 | 975.00 | 3,058.58 | 850.00 | 2,666.45 | 850.00 | 2,666.45 |
| 0029 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 600.00 | 600.00 | 450.00 | 450.00 | 400.00 | 400.00 | 400.00 | 400.00 |
| 0030 | 736-09-00100 | Loop Detector | 450 | LNFT | 10.00 | 4,500.00 | 30.00 | 13,500.00 | 13.00 | 5,850.00 | 14.00 | 6,300.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 |
| 0032 | 741-11-00100 | Adjusting Water Valve | 10 | EACH | 500.00 | 5,000.00 | 300.00 | 3,000.00 | 150.00 | 1,500.00 | 15.00 | 150.00 |
| 0033 | NS-300-00060 | Geogrid | 6,398.29 | SQYD | 0.40 | 2,559.32 | 2.50 | 15,995.73 | 4.50 | 28,792.31 | 2.00 | 12,796.58 |
| 0034 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 3,728 | LNFT | 4.00 | 14,912.00 | 2.00 | 7,456.00 | 3.00 | 11,184.00 | 2.00 | 7,456.00 |
| 0035 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 7,391 | LNFT | 4.00 | 29,564.00 | 2.00 | 14,782.00 | 3.00 | 22,173.00 | 2.00 | 14,782.00 |
| 0036 | NS-SRP-00001 | ADA Ramps (Type A) | 71 | EACH | 2,000.00 | 142,000.00 | 1,800.00 | 127,800.00 | 2,100.00 | 149,100.00 | 2,000.00 | 142,000.00 |
| 0037 | NS-SRP-00003 | Adjust (Manhole with Rings) | 48 | EACH | 120.00 | 5,760.00 | 150.00 | 7,200.00 | 450.00 | 21,600.00 | 300.00 | 14,400.00 |
| 0038 | NS-SRP-00004 | Adjust (Manhole) | 84 | EACH | 750.00 | 63,000.00 | 500.00 | 42,000.00 | 750.00 | 63,000.00 | 1,000.00 | 84,000.00 |
| 0039 | NS-SRP-00005 | Adjust Catch Basin (Type A) | 37 | EACH | 950.00 | 35,150.00 | 500.00 | 18,500.00 | 750.00 | 27,750.00 | 1,500.00 | 55,500.00 |
| 0040 | NS-SRP-00007 | Adjust Drop Inlet | 2 | EACH | 800.00 | 1,600.00 | 300.00 | 600.00 | 750.00 | 1,500.00 | 1,500.00 | 3,000.00 |
| 0041 | NS-SRP-00010 | Adjusting Junction Box (Utility) | 1 | EACH | 1,000.00 | 1,000.00 | 2,000.00 | 2,000.00 | 750.00 | 750.00 | 1,500.00 | 1,500.00 |
| 0042 | NS-SRP-00012 | Concrete Pavement Repair (18.0 sq. yd. and Under) | 43.6 | SQYD | 201.00 | 8,763.60 | 250.00 | 10,900.00 | 150.00 | 6,540.00 | 150.00 | 6,540.00 |
| 0043 | NS-SRP-00013 | Concrete Pavement Repair (18.1 sq. yd. to 48.0 sq. yd.) | 391.8 | SQYD | 136.50 | 53,480.70 | 170.00 | 66,606.00 | 130.00 | 50,934.00 | 150.00 | 58,770.00 |
| 0044 | NS-SRP-00014 | Concrete Pavement Repair (48.1 sq. yd. and Over) | 3,385.4 | SQYD | 105.00 | 355,467.00 | 130.00 | 440,102.00 | 120.00 | 406,248.00 | 150.00 | 507,810.00 |
| 0045 | NS-SRP-00018 | Concrete Curb Barrier (Drilled and Doweled) | 50 | LNFT | 34.25 | 1,712.50 | 40.00 | 2,000.00 | 75.00 | 3,750.00 | 20.00 | 1,000.00 |
| 0046 | NS-SRP-00019 | Concrete Curb (Mountable) (Drilled and Doweled) | 50 | LNFT | 34.25 | 1,712.50 | 40.00 | 2,000.00 | 75.00 | 3,750.00 | 20.00 | 1,000.00 |
| 0047 | NS-SRP-00029 | Project Signs (SRP) | 4 | EACH | 1,000.00 | 4,000.00 | 650.00 | 2,600.00 | 1,200.00 | 4,800.00 | 1,000.00 | 4,000.00 |
| 0048 | NS-SRP-00035 | Repair Bus Pads | 466.65 | SQYD | 173.70 | 81,057.11 | 200.00 | 93,330.00 | 180.00 | 83,997.00 | 150.00 | 69,997.50 |
| 0049 | NS-SRP-00037 | Replace Frame and Cover (Manhole Drain) | 3 | EACH | 2,500.00 | 7,500.00 | 800.00 | 2,400.00 | 1,800.00 | 5,400.00 | 1,500.00 | 4,500.00 |
| 0050 | NS-SRP-00038 | Replace Frame and Cover (Catch Basin) | 2 | EACH | 2,500.00 | 5,000.00 | 1,200.00 | 2,400.00 | 1,800.00 | 3,600.00 | 2,500.00 | 5,000.00 |
| 0051 | NS-SRP-00039 | Replace Frame and Cover (Grate Inlet) | 1 | EACH | 2,500.00 | 2,500.00 | 800.00 | 800.00 | 1,800.00 | 1,800.00 | 1,500.00 | 1,500.00 |
| 0052 | NS-SRP-00040 | Replace Frame and Cover (Manhole) (Sanitary Sewer) | 3 | EACH | 2,500.00 | 7,500.00 | 800.00 | 2,400.00 | 2,400.00 | 7,200.00 | 1,500.00 | 4,500.00 |
| 0053 | NS-SRP-00044 | Tree Protection | 1 | LUMP | 8,000.00 | 8,000.00 | 1,000.00 | 1,000.00 | 15,000.00 | 15,000.00 | 4,000.00 | 4,000.00 |
| 0054 | NS-SRP-00045 | Tree Trimming | 1 | LUMP | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 |
| 0055 | NS-SRP-00046 | Root Pruning and Trenching | 1 | LUMP | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 | 7,500.00 | 7,500.00 | 3,000.00 | 3,000.00 |
| 0056 | NS-SRP-00047 | Hnd Frm and Pour In-Plc Cncr Crb Wthn Lim of the Tree Drpln | 50 | LNFT | 45.00 | 2,250.00 | 40.00 | 2,000.00 | 75.00 | 3,750.00 | 25.00 | 1,250.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 2,371,344.21 | 2,484,352.28 | 3,131,409.79 | 3,165,082.84 | ||||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 450,000.00 | 825,000.00 | 600,000.00 | 630,000.00 | ||||||||
| TOTAL BID | 2,821,344.21 | 3,309,352.28 | 3,731,409.79 | 3,795,082.84 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Boh Bros. Construction Co., LLC. |
- 6 - Gibbs & Register Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,000.00 | 4,000.00 | 35,000.00 | 35,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 336.03 | SQYD | 16.00 | 5,376.48 | 25.00 | 8,400.75 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 75,000.00 | 75,000.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 180 | EACH | 50.00 | 9,000.00 | 25.00 | 4,500.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 1,500 | LNFT | 3.00 | 4,500.00 | 5.00 | 7,500.00 |
| 0006 | 302-02-03000 | Class II Base Course (8" Thick) | 2,577.49 | SQYD | 40.00 | 103,099.60 | 50.00 | 128,874.50 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 145 | CUYD | 40.00 | 5,800.00 | 75.00 | 10,875.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 6,652.59 | TON | 120.00 | 798,310.80 | 130.00 | 864,836.70 |
| 0009 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 396.28 | TON | 150.00 | 59,442.00 | 270.00 | 106,995.60 |
| 0010 | 509-01-00100 | Cold Planing Asphaltic Pavement | 41,153.32 | SQYD | 3.00 | 123,459.96 | 5.00 | 205,766.60 |
| 0011 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 2,577.49 | SQYD | 90.00 | 231,974.10 | 110.00 | 283,523.90 |
| 0012 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,728 | LNFT | 2.00 | 7,456.00 | 3.00 | 11,184.00 |
| 0013 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 7,391 | LNFT | 2.00 | 14,782.00 | 3.00 | 22,173.00 |
| 0014 | 602-03-00100 | Cleaning and Sealing Random cracks | 650 | LNFT | 3.75 | 2,437.50 | 4.00 | 2,600.00 |
| 0015 | 602-08-00100 | Grinding Concrete Pavement | 956.67 | SQYD | 12.00 | 11,480.04 | 15.00 | 14,350.05 |
| 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 336.03 | SQYD | 65.00 | 21,841.95 | 50.00 | 16,801.50 |
| 0017 | 707-01-00200 | Concrete Curb (Barrier) | 860 | LNFT | 25.00 | 21,500.00 | 50.00 | 43,000.00 |
| 0018 | 707-01-00300 | Concrete Curb (Mountable) | 1,532 | LNFT | 25.00 | 38,300.00 | 50.00 | 76,600.00 |
| 0019 | 707-03-00100 | Combination Concrete Curb and Gutter | 374 | LNFT | 45.00 | 16,830.00 | 50.00 | 18,700.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 127,500.00 | 127,500.00 | 85,000.00 | 85,000.00 |
| 0021 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2 | MILE | 525.00 | 1,050.00 | 2,000.00 | 4,000.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 290,000.00 | 290,000.00 | 363,500.00 | 363,500.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 900 | EACH | 5.55 | 4,995.00 | 5.50 | 4,950.00 |
| 0024 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 15,900 | LNFT | 0.65 | 10,335.00 | 1.00 | 15,900.00 |
| 0025 | 732-01-01020 | Plastic Pavement Striping (6" Width) (Thermoplastic 90 mil) | 4,020 | LNFT | 0.90 | 3,618.00 | 2.00 | 8,040.00 |
| 0026 | 732-01-01060 | Plastic Pavement Striping (12" Width) (Thermoplastic 90 mil) | 798 | LNFT | 2.75 | 2,194.50 | 3.00 | 2,394.00 |
| 0027 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 48 | LNFT | 4.75 | 228.00 | 6.00 | 288.00 |
| 0028 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.137 | MILE | 900.00 | 2,823.30 | 1,200.00 | 3,764.40 |
| 0029 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 1 | EACH | 420.00 | 420.00 | 600.00 | 600.00 |
| 0030 | 736-09-00100 | Loop Detector | 450 | LNFT | 14.00 | 6,300.00 | 35.00 | 15,750.00 |
| 0031 | 740-01-00100 | Construction Layout | 1 | LUMP | 27,500.00 | 27,500.00 | 80,000.00 | 80,000.00 |
| 0032 | 741-11-00100 | Adjusting Water Valve | 10 | EACH | 300.00 | 3,000.00 | 600.00 | 6,000.00 |
| 0033 | NS-300-00060 | Geogrid | 6,398.29 | SQYD | 2.00 | 12,796.58 | 3.50 | 22,394.02 |
| 0034 | NS-500-00220 | Sawing and Sealing Longitudinal Joints in Asphaltic Concrete Overlay | 3,728 | LNFT | 2.25 | 8,388.00 | 2.50 | 9,320.00 |
| 0035 | NS-500-00240 | Sawing and Sealing Transverse Joints in Asphaltic Concrete Overlay | 7,391 | LNFT | 2.25 | 16,629.75 | 2.50 | 18,477.50 |
| 0036 | NS-SRP-00001 | ADA Ramps (Type A) | 71 | EACH | 2,600.00 | 184,600.00 | 1,500.00 | 106,500.00 |
| 0037 | NS-SRP-00003 | Adjust (Manhole with Rings) | 48 | EACH | 150.00 | 7,200.00 | 500.00 | 24,000.00 |
| 0038 | NS-SRP-00004 | Adjust (Manhole) | 84 | EACH | 750.00 | 63,000.00 | 1,000.00 | 84,000.00 |
| 0039 | NS-SRP-00005 | Adjust Catch Basin (Type A) | 37 | EACH | 1,100.00 | 40,700.00 | 2,000.00 | 74,000.00 |
| 0040 | NS-SRP-00007 | Adjust Drop Inlet | 2 | EACH | 1,100.00 | 2,200.00 | 2,000.00 | 4,000.00 |
| 0041 | NS-SRP-00010 | Adjusting Junction Box (Utility) | 1 | EACH | 1,250.00 | 1,250.00 | 5,000.00 | 5,000.00 |
| 0042 | NS-SRP-00012 | Concrete Pavement Repair (18.0 sq. yd. and Under) | 43.6 | SQYD | 170.00 | 7,412.00 | 300.00 | 13,080.00 |
| 0043 | NS-SRP-00013 | Concrete Pavement Repair (18.1 sq. yd. to 48.0 sq. yd.) | 391.8 | SQYD | 140.00 | 54,852.00 | 285.00 | 111,663.00 |
| 0044 | NS-SRP-00014 | Concrete Pavement Repair (48.1 sq. yd. and Over) | 3,385.4 | SQYD | 130.00 | 440,102.00 | 250.00 | 846,350.00 |
| 0045 | NS-SRP-00018 | Concrete Curb Barrier (Drilled and Doweled) | 50 | LNFT | 20.00 | 1,000.00 | 80.00 | 4,000.00 |
| 0046 | NS-SRP-00019 | Concrete Curb (Mountable) (Drilled and Doweled) | 50 | LNFT | 20.00 | 1,000.00 | 80.00 | 4,000.00 |
| 0047 | NS-SRP-00029 | Project Signs (SRP) | 4 | EACH | 700.00 | 2,800.00 | 55.00 | 220.00 |
| 0048 | NS-SRP-00035 | Repair Bus Pads | 466.65 | SQYD | 200.00 | 93,330.00 | 250.00 | 116,662.50 |
| 0049 | NS-SRP-00037 | Replace Frame and Cover (Manhole Drain) | 3 | EACH | 3,000.00 | 9,000.00 | 2,000.00 | 6,000.00 |
| 0050 | NS-SRP-00038 | Replace Frame and Cover (Catch Basin) | 2 | EACH | 2,000.00 | 4,000.00 | 2,000.00 | 4,000.00 |
| 0051 | NS-SRP-00039 | Replace Frame and Cover (Grate Inlet) | 1 | EACH | 2,500.00 | 2,500.00 | 2,000.00 | 2,000.00 |
| 0052 | NS-SRP-00040 | Replace Frame and Cover (Manhole) (Sanitary Sewer) | 3 | EACH | 3,000.00 | 9,000.00 | 2,000.00 | 6,000.00 |
| 0053 | NS-SRP-00044 | Tree Protection | 1 | LUMP | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 |
| 0054 | NS-SRP-00045 | Tree Trimming | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0055 | NS-SRP-00046 | Root Pruning and Trenching | 1 | LUMP | 2,750.00 | 2,750.00 | 5,000.00 | 5,000.00 |
| 0056 | NS-SRP-00047 | Hnd Frm and Pour In-Plc Cncr Crb Wthn Lim of the Tree Drpln | 50 | LNFT | 150.00 | 7,500.00 | 150.00 | 7,500.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 2,950,564.56 | 4,011,035.02 | ||||||
| NUMBER OF DAYS BID AT $5000 PER DAY. | 850,000.00 | 1,500,000.00 | ||||||
| TOTAL BID | 3,800,564.56 | 5,511,035.02 | ||||||