LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.008674.6
Parish: Iberia
Routes:
Description: ESTIS ROAD BRIDGE OVER CHANNEL L3H
Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK
Estimated Construction Cost: $483,543.20


RankLicenseBidderConstruction Bid
1 01012 Cecil D. Gassiott, LLC $424,706.58
2 40312 Gray Construction Corp. $432,814.01
3 08815 W. E. Mcdonald & Son, LLC. $479,697.35
4 00044 Guinn Construction, LLC $489,426.80
5 39462 Jb James Construction Llc $505,708.05
6 00481 Coastal Bridge Co., L.L.C. $687,946.25


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Cecil D. Gassiott, LLC
- 2 -
Gray Construction Corp.
- 3 -
W. E. Mcdonald & Son, LLC.
- 4 -
Guinn Construction, LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 5,584.00 5,584.00 8,500.00 8,500.00 12,000.00 12,000.00 8,000.00 8,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 2,420.00 2,420.00 500.00 500.00 10,000.00 10,000.00 8,000.00 8,000.00
0003 202-02-04000 Removal of Bridge (STA 15+10;.26.5' X 20' TIMBER BRIDGE) 1      EACH 4,068.00 4,068.00 5,000.00 5,000.00 5,000.00 5,000.00 6,000.00 6,000.00
0004 202-02-38500 Removal of Surfacing and Stablized Base 938.1    SQYD 7.75 7,270.28 15.30 14,352.93 5.00 4,690.50 8.00 7,504.80
0005 203-05-00100 Excavation and Embankment 1      LUMP 9,658.00 9,658.00 20,000.00 20,000.00 14,400.00 14,400.00 20,000.00 20,000.00
0006 204-02-00100 Temporary Hay or Straw Bales 12      EACH 40.00 480.00 15.00 180.00 10.00 120.00 10.00 120.00
0007 204-05-00100 Temporary Sediment Check Dams (Hay) 6      EACH 100.00 600.00 175.00 1,050.00 300.00 1,800.00 100.00 600.00
0008 204-06-00100 Temporary Silt Fencing 693      LNFT 3.00 2,079.00 2.25 1,559.25 2.95 2,044.35 3.00 2,079.00
0009 302-01-00700 Class II Base Course (Stone) 223.2    CUYD 89.00 19,864.80 133.00 29,685.60 100.00 22,320.00 95.00 21,204.00
0010 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 8      CUYD 89.00 712.00 99.00 792.00 150.00 1,200.00 150.00 1,200.00
0011 502-01-00100 Superpave Asphaltic Concrete 175      TON 160.00 28,000.00 148.00 25,900.00 180.00 31,500.00 180.00 31,500.00
0012 701-05-01020 Side Drain Pipe (15" RCP/PP/CMP) 10      LNFT 75.00 750.00 73.00 730.00 30.00 300.00 35.00 350.00
0013 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 126      LNFT 80.00 10,080.00 55.15 6,948.90 45.00 5,670.00 52.00 6,552.00
0014 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) 35      LNFT 90.00 3,150.00 71.15 2,490.25 65.00 2,275.00 80.00 2,800.00
0015 701-05-01100 Side Drain Pipe (36" RCP/PP/CMP) 85      LNFT 105.00 8,925.00 82.50 7,012.50 82.00 6,970.00 100.00 8,500.00
0016 701-05-01180 Side Drain Pipe (60" RCP/CMP) 33      LNFT 120.00 3,960.00 133.50 4,405.50 250.00 8,250.00 275.00 9,075.00
0017 701-05-02080 Side Drain Pipe (Erosion) (30" PP/CMP) 47      LNFT 90.00 4,230.00 76.25 3,583.75 65.00 3,055.00 80.00 3,760.00
0018 701-05-02100 Side Drain Pipe (Erosion) (36" PP/CMP) 75      LNFT 105.00 7,875.00 77.40 5,805.00 82.00 6,150.00 100.00 7,500.00
0019 701-05-02140 Side Drain Pipe (Erosion) (48" PP/CMP) 115      LNFT 115.00 13,225.00 100.90 11,603.50 190.00 21,850.00 155.00 17,825.00
0020 701-05-02180 Side Drain Pipe (Erosion) (60" CMP) 67      LNFT 120.00 8,040.00 134.20 8,991.40 250.00 16,750.00 275.00 18,425.00
0021 702-03-00100 Catch Basins (CB-01) 2      EACH 4,000.00 8,000.00 3,420.00 6,840.00 5,000.00 10,000.00 3,500.00 7,000.00
0022 702-03-00200 Catch Basins (CB-02) 3      EACH 5,000.00 15,000.00 4,130.00 12,390.00 7,000.00 21,000.00 4,200.00 12,600.00
0023 704-03-00100 Blocked Out Guard Rail 37.5    LNFT 80.00 3,000.00 17.75 665.63 21.00 787.50 22.00 825.00
0024 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 75      LNFT 80.00 6,000.00 52.00 3,900.00 65.00 4,875.00 70.00 5,250.00
0025 704-11-00100 Guard Rail End Treatment (Flared) 3      EACH 1,500.00 4,500.00 2,500.00 7,500.00 2,100.00 6,300.00 2,400.00 7,200.00
0026 711-01-03000 Riprap (30 lb, 14" Thick) 496      SQYD 45.00 22,320.00 55.00 27,280.00 58.00 28,768.00 70.00 34,720.00
0027 711-04-00100 Geotextile Fabric 496      SQYD 2.00 992.00 2.00 992.00 3.50 1,736.00 2.50 1,240.00
0028 713-01-00100 Temporary Signs and Barricades 1      LUMP 6,000.00 6,000.00 6,320.00 6,320.00 12,500.00 12,500.00 8,000.00 8,000.00
0029 716-01-00100 Mulch (Vegetative) 0.6    TON 95.00 57.00 2,100.00 1,260.00 2,000.00 1,200.00 2,500.00 1,500.00
0030 717-01-00100 Seeding 14      LB 120.00 1,680.00 25.00 350.00 10.00 140.00 20.00 280.00
0031 718-01-00100 Fertilizer 310      LB 3.00 930.00 2.50 775.00 0.50 155.00 1.00 310.00
0032 726-01-00100 Bedding Material 12.3    CUYD 65.00 799.50 106.00 1,303.80 100.00 1,230.00 100.00 1,230.00
0033 727-01-00100 Mobilization 1      LUMP 14,500.00 14,500.00 28,000.00 28,000.00 44,000.00 44,000.00 38,500.00 38,500.00
0034 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 100.00 400.00 80.00 320.00 80.00 320.00 100.00 400.00
0035 740-01-00100 Construction Layout 1      LUMP 2,500.00 2,500.00 3,000.00 3,000.00 2,500.00 2,500.00 5,500.00 5,500.00
0036 804-01-00200 Precast Concrete Piles (14") 1,040      LNFT 80.00 83,200.00 52.00 54,080.00 55.00 57,200.00 55.00 57,200.00
0037 804-12-00100 Loading Permanent Piles 1      EACH 1.00 1.00 100.00 100.00 1.00 1.00 1.00 1.00
0038 805-10-02300 Bridge Superstructure and Substructure (28' Clear Roadway; 90 Degree Crossing) 3      SPAN 27,700.00 83,100.00 29,815.00 89,445.00 28,000.00 84,000.00 30,000.00 90,000.00
0039 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 588      INLF 7.00 4,116.00 1.50 882.00 5.00 2,940.00 2.00 1,176.00
0040 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT; ONE TAPERED BARRIER RAIL) 1      EACH 10,200.00 10,200.00 11,400.00 11,400.00 10,500.00 10,500.00 12,500.00 12,500.00
0041 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT) 1      EACH 8,200.00 8,200.00 9,000.00 9,000.00 10,000.00 10,000.00 11,000.00 11,000.00
0042 NS-804-00001 Vibration Monitoring (INCLUDING INITIAL SITE SURVEY) 16      EACH 515.00 8,240.00 495.00 7,920.00 200.00 3,200.00 750.00 12,000.00
                         
    CONTRACTOR TOTAL       424,706.58   432,814.01   479,697.35   489,426.80



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Jb James Construction Llc
- 6 -
Coastal Bridge Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 10,000.00 10,000.00 20,000.00 20,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 4,700.00 4,700.00 50,000.00 50,000.00
0003 202-02-04000 Removal of Bridge (STA 15+10;.26.5' X 20' TIMBER BRIDGE) 1      EACH 35,000.00 35,000.00 77,000.00 77,000.00
0004 202-02-38500 Removal of Surfacing and Stablized Base 938.1    SQYD 5.00 4,690.50 10.00 9,381.00
0005 203-05-00100 Excavation and Embankment 1      LUMP 18,000.00 18,000.00 20,000.00 20,000.00
0006 204-02-00100 Temporary Hay or Straw Bales 12      EACH 16.00 192.00 15.00 180.00
0007 204-05-00100 Temporary Sediment Check Dams (Hay) 6      EACH 110.00 660.00 175.00 1,050.00
0008 204-06-00100 Temporary Silt Fencing 693      LNFT 3.15 2,182.95 2.25 1,559.25
0009 302-01-00700 Class II Base Course (Stone) 223.2    CUYD 110.00 24,552.00 110.00 24,552.00
0010 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 8      CUYD 150.00 1,200.00 100.00 800.00
0011 502-01-00100 Superpave Asphaltic Concrete 175      TON 150.00 26,250.00 150.00 26,250.00
0012 701-05-01020 Side Drain Pipe (15" RCP/PP/CMP) 10      LNFT 49.00 490.00 67.00 670.00
0013 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 126      LNFT 50.00 6,300.00 79.00 9,954.00
0014 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) 35      LNFT 76.00 2,660.00 94.00 3,290.00
0015 701-05-01100 Side Drain Pipe (36" RCP/PP/CMP) 85      LNFT 85.00 7,225.00 99.00 8,415.00
0016 701-05-01180 Side Drain Pipe (60" RCP/CMP) 33      LNFT 192.00 6,336.00 215.00 7,095.00
0017 701-05-02080 Side Drain Pipe (Erosion) (30" PP/CMP) 47      LNFT 63.00 2,961.00 94.00 4,418.00
0018 701-05-02100 Side Drain Pipe (Erosion) (36" PP/CMP) 75      LNFT 80.00 6,000.00 98.00 7,350.00
0019 701-05-02140 Side Drain Pipe (Erosion) (48" PP/CMP) 115      LNFT 123.00 14,145.00 131.00 15,065.00
0020 701-05-02180 Side Drain Pipe (Erosion) (60" CMP) 67      LNFT 154.00 10,318.00 215.00 14,405.00
0021 702-03-00100 Catch Basins (CB-01) 2      EACH 2,800.00 5,600.00 3,000.00 6,000.00
0022 702-03-00200 Catch Basins (CB-02) 3      EACH 3,600.00 10,800.00 4,000.00 12,000.00
0023 704-03-00100 Blocked Out Guard Rail 37.5    LNFT 21.00 787.50 18.00 675.00
0024 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 75      LNFT 66.00 4,950.00 59.00 4,425.00
0025 704-11-00100 Guard Rail End Treatment (Flared) 3      EACH 2,000.00 6,000.00 10,775.00 32,325.00
0026 711-01-03000 Riprap (30 lb, 14" Thick) 496      SQYD 59.00 29,264.00 70.00 34,720.00
0027 711-04-00100 Geotextile Fabric 496      SQYD 2.00 992.00 6.50 3,224.00
0028 713-01-00100 Temporary Signs and Barricades 1      LUMP 15,000.00 15,000.00 18,000.00 18,000.00
0029 716-01-00100 Mulch (Vegetative) 0.6    TON 2,100.00 1,260.00 2,100.00 1,260.00
0030 717-01-00100 Seeding 14      LB 12.00 168.00 25.00 350.00
0031 718-01-00100 Fertilizer 310      LB 0.56 173.60 2.50 775.00
0032 726-01-00100 Bedding Material 12.3    CUYD 75.00 922.50 100.00 1,230.00
0033 727-01-00100 Mobilization 1      LUMP 50,000.00 50,000.00 65,000.00 65,000.00
0034 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 85.00 340.00 75.00 300.00
0035 740-01-00100 Construction Layout 1      LUMP 15,000.00 15,000.00 11,000.00 11,000.00
0036 804-01-00200 Precast Concrete Piles (14") 1,040      LNFT 70.00 72,800.00 56.00 58,240.00
0037 804-12-00100 Loading Permanent Piles 1      EACH 100.00 100.00 100.00 100.00
0038 805-10-02300 Bridge Superstructure and Substructure (28' Clear Roadway; 90 Degree Crossing) 3      SPAN 28,600.00 85,800.00 37,000.00 111,000.00
0039 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 588      INLF 1.00 588.00 1.00 588.00
0040 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT; ONE TAPERED BARRIER RAIL) 1      EACH 9,500.00 9,500.00 8,800.00 8,800.00
0041 NS-800-00040 Concrete Approach Slabs (28' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT) 1      EACH 7,000.00 7,000.00 8,500.00 8,500.00
0042 NS-804-00001 Vibration Monitoring (INCLUDING INITIAL SITE SURVEY) 16      EACH 300.00 4,800.00 500.00 8,000.00
                 
    CONTRACTOR TOTAL       505,708.05   687,946.25