Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.008417.6 | |
| Parish: Terrebonne | |
| Routes: La 661 | |
| Description: HOUMA NAVIGATIONAL CANAL BRIDGE REHABILITATION | |
| Type Const: BRIDGE REHABILITATION AND RELATED WORK. | |
| Estimated Construction Cost: $11,604,084.13 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 26435 | C.E.C., Inc. | $9,860,342.70 |
| 2 | 36827 | Shavers-Whittle Construction LLC | $10,902,368.55 |
| 3 | 00755 | L & A Contracting Co. | $11,083,574.40 |
| 4 | 02179 | Boh Bros. Construction Co., LLC. | $11,813,891.88 |
| 5 | 51422 | Pcl Civil Constructors Inc | $12,197,362.77 |
| 6 | 00271 | Massman Construction Co. | $12,301,593.40 |
| 7 | 14964 | Johnson Bros. Corp. of La | $12,353,531.00 |
| 8 | 25747 | Kostmayer Construction, LLC | $12,368,601.60 |
| 9 | 00481 | Coastal Bridge Co., L.L.C. | $12,459,738.75 |
| 10 | 56565 | Aquaterra Contracting, LLC | $13,589,234.50 |
| 11 | 47488 | OCCI INC of Missouri | $14,625,626.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - C.E.C., Inc. |
- 2 - Shavers-Whittle Construction LLC |
- 3 - L & A Contracting Co. |
- 4 - Boh Bros. Construction Co., LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 11,250.00 | 11,250.00 |
| 0002 | 202-02-00010 | Removal of Center Pivot Pier Cleaning | 1 | EACH | 6,000.00 | 6,000.00 | 15,000.00 | 15,000.00 | 95,000.00 | 95,000.00 | 11,300.00 | 11,300.00 |
| 0003 | 202-02-00010 | Removal of Balance Block Pockets | 2 | EACH | 1,500.00 | 3,000.00 | 6,000.00 | 12,000.00 | 16,000.00 | 32,000.00 | 7,500.00 | 15,000.00 |
| 0004 | 202-02-00010 | Removal of Bent Lateral Members | 4 | EACH | 700.00 | 2,800.00 | 1,000.00 | 4,000.00 | 1,600.00 | 6,400.00 | 2,500.00 | 10,000.00 |
| 0005 | 202-02-00010 | Removal of End Panel | 1 | EACH | 4,000.00 | 4,000.00 | 750.00 | 750.00 | 4,200.00 | 4,200.00 | 4,500.00 | 4,500.00 |
| 0006 | 202-02-00010 | Removal of Loose Bent Cap Concrete | 1 | EACH | 3,500.00 | 3,500.00 | 800.00 | 800.00 | 8,500.00 | 8,500.00 | 8,000.00 | 8,000.00 |
| 0007 | 202-02-00010 | Removal of Marine Sanitation Device | 1 | EACH | 2,300.00 | 2,300.00 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 5,500.00 | 5,500.00 |
| 0008 | 202-02-04024 | Removal of Bridge Components Barrier Rail | 1 | LUMP | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 | 4,200.00 | 4,200.00 | 5,500.00 | 5,500.00 |
| 0009 | 202-02-04024 | Removal of Bridge Components Catwalk | 1 | LUMP | 2,400.00 | 2,400.00 | 2,000.00 | 2,000.00 | 1,500.00 | 1,500.00 | 11,500.00 | 11,500.00 |
| 0010 | 202-02-04024 | Removal of Bridge Components Concrete Sidewalk | 1 | LUMP | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 12,000.00 | 12,000.00 | 10,300.00 | 10,300.00 |
| 0011 | 202-02-04024 | Removal of Bridge Components Cracked Structural Beams | 1 | LUMP | 2,500.00 | 2,500.00 | 6,500.00 | 6,500.00 | 33,000.00 | 33,000.00 | 30,500.00 | 30,500.00 |
| 0012 | 202-02-04024 | Removal of Bridge Components Steel Plate Sidewalk | 1 | LUMP | 2,800.00 | 2,800.00 | 3,000.00 | 3,000.00 | 3,500.00 | 3,500.00 | 6,500.00 | 6,500.00 |
| 0013 | 202-02-12300 | Removal of Fender System | 1 | EACH | 25,000.00 | 25,000.00 | 125,000.00 | 125,000.00 | 110,000.00 | 110,000.00 | 161,500.00 | 161,500.00 |
| 0014 | 202-02-30000 | Removal of Operators House | 1 | EACH | 12,000.00 | 12,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0015 | 202-02-38020 | Removal of Sewer Treatment Plant | 1 | EACH | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 | 10,500.00 | 10,500.00 |
| 0016 | 202-02-38400 | Removal of Structural Concrete Movable Barrier Platform | 1 | LUMP | 4,000.00 | 4,000.00 | 1,500.00 | 1,500.00 | 3,500.00 | 3,500.00 | 16,500.00 | 16,500.00 |
| 0017 | 202-02-40000 | Removal of Timber Piles | 14,550 | LNFT | 6.00 | 87,300.00 | 6.50 | 94,575.00 | 15.00 | 218,250.00 | 3.50 | 50,925.00 |
| 0018 | 203-01-00100 | General Excavation | 188 | CUYD | 10.00 | 1,880.00 | 20.00 | 3,760.00 | 20.00 | 3,760.00 | 10.00 | 1,880.00 |
| 0019 | 203-03-00100 | Embankment | 387 | CUYD | 25.00 | 9,675.00 | 35.00 | 13,545.00 | 42.00 | 16,254.00 | 30.00 | 11,610.00 |
| 0020 | 203-08-00100 | Geotextile Fabric | 706 | SQYD | 3.00 | 2,118.00 | 3.00 | 2,118.00 | 6.00 | 4,236.00 | 4.00 | 2,824.00 |
| 0021 | 204-06-00100 | Temporary Silt Fencing | 155 | LNFT | 4.00 | 620.00 | 8.00 | 1,240.00 | 10.00 | 1,550.00 | 9.00 | 1,395.00 |
| 0022 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 61 | LNFT | 55.00 | 3,355.00 | 12.50 | 762.50 | 40.00 | 2,440.00 | 28.00 | 1,708.00 |
| 0023 | 602-12-00100 | Undersealing Pavement | 27.1 | TON | 650.00 | 17,615.00 | 185.00 | 5,013.50 | 500.00 | 13,550.00 | 320.00 | 8,672.00 |
| 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 351.7 | SQYD | 70.00 | 24,619.00 | 55.00 | 19,343.50 | 95.00 | 33,411.50 | 75.00 | 26,377.50 |
| 0025 | 710-01-00100 | Flowable Fill | 6 | CUYD | 850.00 | 5,100.00 | 350.00 | 2,100.00 | 800.00 | 4,800.00 | 450.00 | 2,700.00 |
| 0026 | 711-01-06000 | Riprap (250 lb, 30" Thick) | 615 | SQYD | 115.00 | 70,725.00 | 140.00 | 86,100.00 | 165.00 | 101,475.00 | 70.00 | 43,050.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 150,000.00 | 150,000.00 |
| 0028 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 5,000.00 | 1,000.00 | 4,600.00 | 920.00 | 4,800.00 | 960.00 | 1,045.00 | 209.00 |
| 0029 | 717-01-00100 | Seeding | 4 | LB | 150.00 | 600.00 | 55.00 | 220.00 | 55.00 | 220.00 | 4.50 | 18.00 |
| 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 350,000.00 | 350,000.00 | 385,000.00 | 385,000.00 | 1,059,000.00 | 1,059,000.00 |
| 0031 | 730-09-00100 | Electrical System | 1 | LUMP | 1,570,000.00 | 1,570,000.00 | 1,500,000.00 | 1,500,000.00 | 1,500,000.00 | 1,500,000.00 | 1,685,000.00 | 1,685,000.00 |
| 0032 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 |
| 0033 | 804-01-00600 | Precast Concrete Piles (24") | 464 | LNFT | 120.00 | 55,680.00 | 125.00 | 58,000.00 | 120.00 | 55,680.00 | 150.00 | 69,600.00 |
| 0034 | 804-03-01020 | Steel Piles (HP 10x42) | 51 | LNFT | 100.00 | 5,100.00 | 65.00 | 3,315.00 | 90.00 | 4,590.00 | 90.00 | 4,590.00 |
| 0035 | 804-03-02160 | Steel Piles (36" Pipe) | 13,185 | LNFT | 205.00 | 2,702,925.00 | 230.00 | 3,032,550.00 | 205.00 | 2,702,925.00 | 218.00 | 2,874,330.00 |
| 0036 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 | 28,000.00 | 28,000.00 | 4,500.00 | 4,500.00 |
| 0037 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 1,000.00 | 4,000.00 | 2,000.00 | 8,000.00 | 4,700.00 | 18,800.00 | 2,000.00 | 8,000.00 |
| 0038 | 805-01-00100 | Class A Concrete | 61.51 | CUYD | 1,000.00 | 61,510.00 | 1,800.00 | 110,718.00 | 960.00 | 59,049.60 | 1,600.00 | 98,416.00 |
| 0039 | 805-03-00100 | Class AA Concrete | 40.36 | CUYD | 1,200.00 | 48,432.00 | 1,200.00 | 48,432.00 | 550.00 | 22,198.00 | 1,000.00 | 40,360.00 |
| 0040 | 806-01-00100 | Deformed Reinforcing Steel | 16,535 | LB | 1.50 | 24,802.50 | 1.25 | 20,668.75 | 1.00 | 16,535.00 | 1.00 | 16,535.00 |
| 0041 | 807-08-00100 | Structural Metalwork Movable Barrier Platform | 1 | LUMP | 60,000.00 | 60,000.00 | 40,000.00 | 40,000.00 | 225,000.00 | 225,000.00 | 26,500.00 | 26,500.00 |
| 0042 | 807-08-00100 | Structural Metalwork Balance Block Pockets | 1 | LUMP | 45,000.00 | 45,000.00 | 80,000.00 | 80,000.00 | 115,000.00 | 115,000.00 | 106,000.00 | 106,000.00 |
| 0043 | 807-08-00100 | Structural Metalwork Cracked Structural Beams | 1 | LUMP | 75,000.00 | 75,000.00 | 60,000.00 | 60,000.00 | 60,000.00 | 60,000.00 | 78,000.00 | 78,000.00 |
| 0044 | 807-08-00100 | Structural Metalwork Bent Lateral Members | 1 | LUMP | 15,000.00 | 15,000.00 | 9,000.00 | 9,000.00 | 17,000.00 | 17,000.00 | 24,000.00 | 24,000.00 |
| 0045 | 807-08-00100 | Structural Metalwork Broken Welds | 1 | LUMP | 4,000.00 | 4,000.00 | 1,000.00 | 1,000.00 | 5,200.00 | 5,200.00 | 6,600.00 | 6,600.00 |
| 0046 | 807-08-00100 | Structural Metalwork Access Ladder Modification | 1 | LUMP | 1,600.00 | 1,600.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 10,500.00 | 10,500.00 |
| 0047 | 807-08-00100 | Structural Metalwork Electrical Junction Box Support | 1 | LUMP | 6,000.00 | 6,000.00 | 4,000.00 | 4,000.00 | 12,800.00 | 12,800.00 | 8,500.00 | 8,500.00 |
| 0048 | 807-08-00100 | Structural Metalwork Fender System | 1 | LUMP | 1,450,000.00 | 1,450,000.00 | 1,600,000.00 | 1,600,000.00 | 1,500,000.00 | 1,500,000.00 | 1,400,000.00 | 1,400,000.00 |
| 0049 | 807-08-00100 | Structural Metalwork Machinery Platform | 1 | LUMP | 6,000.00 | 6,000.00 | 18,000.00 | 18,000.00 | 10,000.00 | 10,000.00 | 30,000.00 | 30,000.00 |
| 0050 | 807-08-00100 | Structural Metalwork Baffle | 1 | LUMP | 65,000.00 | 65,000.00 | 60,000.00 | 60,000.00 | 67,000.00 | 67,000.00 | 85,000.00 | 85,000.00 |
| 0051 | 807-08-00100 | Structural Metalwork Steel Plate Sidewalk | 1 | LUMP | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | 12,000.00 | 12,000.00 | 19,000.00 | 19,000.00 |
| 0052 | 808-01-00100 | Steel Grid Flooring | 2,413.7 | SQFT | 30.00 | 72,411.00 | 75.00 | 181,027.50 | 60.00 | 144,822.00 | 80.00 | 193,096.00 |
| 0053 | 809-01-00100 | Movable Bridge Machinery | 1 | LUMP | 950,000.00 | 950,000.00 | 1,100,000.00 | 1,100,000.00 | 1,175,000.00 | 1,175,000.00 | 960,000.00 | 960,000.00 |
| 0054 | 809-02-00100 | Traffic Barriers | 1 | LUMP | 210,000.00 | 210,000.00 | 130,000.00 | 130,000.00 | 50,000.00 | 50,000.00 | 253,000.00 | 253,000.00 |
| 0055 | 809-03-00100 | Operating House | 1 | LUMP | 465,000.00 | 465,000.00 | 500,000.00 | 500,000.00 | 200,000.00 | 200,000.00 | 290,000.00 | 290,000.00 |
| 0056 | 810-03-00100 | Pipe Railing Repair | 196.46 | LNFT | 120.00 | 23,575.20 | 130.00 | 25,539.80 | 105.00 | 20,628.30 | 153.00 | 30,058.38 |
| 0057 | 810-03-00100 | Pipe Railing | 60 | LNFT | 220.00 | 13,200.00 | 175.00 | 10,500.00 | 120.00 | 7,200.00 | 186.00 | 11,160.00 |
| 0058 | NS-730-00002 | Bridge Navigational Lighting System | 1 | LUMP | 40,000.00 | 40,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 11,500.00 | 11,500.00 |
| 0059 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) | 1 | LUMP | 800,000.00 | 800,000.00 | 900,000.00 | 900,000.00 | 1,350,000.00 | 1,350,000.00 | 1,400,000.00 | 1,400,000.00 |
| 0060 | NS-800-00646 | Reinforced Plastic Composite Marine Timbers (8 x 12) | 3,962 | LF | 100.00 | 396,200.00 | 135.00 | 534,870.00 | 120.00 | 475,440.00 | 94.00 | 372,428.00 |
| CONTRACTOR TOTAL | 9,860,342.70 | 10,902,368.55 | 11,083,574.40 | 11,813,891.88 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Pcl Civil Constructors Inc |
- 6 - Massman Construction Co. |
- 7 - Johnson Bros. Corp. of La |
- 8 - Kostmayer Construction, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 4,000.00 | 4,000.00 | 18,000.00 | 18,000.00 | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-00010 | Removal of Center Pivot Pier Cleaning | 1 | EACH | 35,000.00 | 35,000.00 | 7,000.00 | 7,000.00 | 100,000.00 | 100,000.00 | 14,000.00 | 14,000.00 |
| 0003 | 202-02-00010 | Removal of Balance Block Pockets | 2 | EACH | 5,500.00 | 11,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 5,000.00 | 10,000.00 |
| 0004 | 202-02-00010 | Removal of Bent Lateral Members | 4 | EACH | 400.00 | 1,600.00 | 1,500.00 | 6,000.00 | 1,000.00 | 4,000.00 | 2,500.00 | 10,000.00 |
| 0005 | 202-02-00010 | Removal of End Panel | 1 | EACH | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | 700.00 | 700.00 | 5,000.00 | 5,000.00 |
| 0006 | 202-02-00010 | Removal of Loose Bent Cap Concrete | 1 | EACH | 650.00 | 650.00 | 1,700.00 | 1,700.00 | 600.00 | 600.00 | 5,000.00 | 5,000.00 |
| 0007 | 202-02-00010 | Removal of Marine Sanitation Device | 1 | EACH | 6,500.00 | 6,500.00 | 500.00 | 500.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0008 | 202-02-04024 | Removal of Bridge Components Barrier Rail | 1 | LUMP | 550.00 | 550.00 | 2,000.00 | 2,000.00 | 1,100.00 | 1,100.00 | 14,000.00 | 14,000.00 |
| 0009 | 202-02-04024 | Removal of Bridge Components Catwalk | 1 | LUMP | 750.00 | 750.00 | 700.00 | 700.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0010 | 202-02-04024 | Removal of Bridge Components Concrete Sidewalk | 1 | LUMP | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | 50,000.00 | 50,000.00 |
| 0011 | 202-02-04024 | Removal of Bridge Components Cracked Structural Beams | 1 | LUMP | 6,440.00 | 6,440.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 |
| 0012 | 202-02-04024 | Removal of Bridge Components Steel Plate Sidewalk | 1 | LUMP | 1,080.00 | 1,080.00 | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 |
| 0013 | 202-02-12300 | Removal of Fender System | 1 | EACH | 250,000.00 | 250,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 50,000.00 | 230,000.00 | 230,000.00 |
| 0014 | 202-02-30000 | Removal of Operators House | 1 | EACH | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 |
| 0015 | 202-02-38020 | Removal of Sewer Treatment Plant | 1 | EACH | 7,500.00 | 7,500.00 | 1,500.00 | 1,500.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 |
| 0016 | 202-02-38400 | Removal of Structural Concrete Movable Barrier Platform | 1 | LUMP | 600.00 | 600.00 | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 |
| 0017 | 202-02-40000 | Removal of Timber Piles | 14,550 | LNFT | 2.00 | 29,100.00 | 12.00 | 174,600.00 | 5.00 | 72,750.00 | 6.36 | 92,538.00 |
| 0018 | 203-01-00100 | General Excavation | 188 | CUYD | 21.00 | 3,948.00 | 20.00 | 3,760.00 | 10.00 | 1,880.00 | 30.00 | 5,640.00 |
| 0019 | 203-03-00100 | Embankment | 387 | CUYD | 45.00 | 17,415.00 | 44.00 | 17,028.00 | 50.00 | 19,350.00 | 30.00 | 11,610.00 |
| 0020 | 203-08-00100 | Geotextile Fabric | 706 | SQYD | 2.50 | 1,765.00 | 3.00 | 2,118.00 | 8.00 | 5,648.00 | 4.00 | 2,824.00 |
| 0021 | 204-06-00100 | Temporary Silt Fencing | 155 | LNFT | 5.00 | 775.00 | 10.00 | 1,550.00 | 5.00 | 775.00 | 3.00 | 465.00 |
| 0022 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 61 | LNFT | 100.00 | 6,100.00 | 11.00 | 671.00 | 50.00 | 3,050.00 | 100.00 | 6,100.00 |
| 0023 | 602-12-00100 | Undersealing Pavement | 27.1 | TON | 900.00 | 24,390.00 | 110.00 | 2,981.00 | 120.00 | 3,252.00 | 400.00 | 10,840.00 |
| 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 351.7 | SQYD | 100.00 | 35,170.00 | 105.00 | 36,928.50 | 80.00 | 28,136.00 | 70.00 | 24,619.00 |
| 0025 | 710-01-00100 | Flowable Fill | 6 | CUYD | 500.00 | 3,000.00 | 400.00 | 2,400.00 | 300.00 | 1,800.00 | 500.00 | 3,000.00 |
| 0026 | 711-01-06000 | Riprap (250 lb, 30" Thick) | 615 | SQYD | 150.00 | 92,250.00 | 210.00 | 129,150.00 | 180.00 | 110,700.00 | 105.00 | 64,575.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 110,000.00 | 110,000.00 | 12,000.00 | 12,000.00 |
| 0028 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 4,000.00 | 800.00 | 5,000.00 | 1,000.00 | 3,100.00 | 620.00 | 2,400.00 | 480.00 |
| 0029 | 717-01-00100 | Seeding | 4 | LB | 100.00 | 400.00 | 50.00 | 200.00 | 15.00 | 60.00 | 20.00 | 80.00 |
| 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 1,219,736.27 | 1,219,736.27 | 1,000,000.00 | 1,000,000.00 | 1,200,000.00 | 1,200,000.00 | 1,100,000.00 | 1,100,000.00 |
| 0031 | 730-09-00100 | Electrical System | 1 | LUMP | 1,280,000.00 | 1,280,000.00 | 1,660,000.00 | 1,660,000.00 | 1,460,000.00 | 1,460,000.00 | 1,500,000.00 | 1,500,000.00 |
| 0032 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 3,500.00 | 3,500.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0033 | 804-01-00600 | Precast Concrete Piles (24") | 464 | LNFT | 250.00 | 116,000.00 | 175.00 | 81,200.00 | 120.00 | 55,680.00 | 150.00 | 69,600.00 |
| 0034 | 804-03-01020 | Steel Piles (HP 10x42) | 51 | LNFT | 260.00 | 13,260.00 | 150.00 | 7,650.00 | 110.00 | 5,610.00 | 240.00 | 12,240.00 |
| 0035 | 804-03-02160 | Steel Piles (36" Pipe) | 13,185 | LNFT | 232.00 | 3,058,920.00 | 230.00 | 3,032,550.00 | 220.00 | 2,900,700.00 | 259.50 | 3,421,507.50 |
| 0036 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 5,000.00 | 5,000.00 | 70,000.00 | 70,000.00 | 45,000.00 | 45,000.00 | 1,500.00 | 1,500.00 |
| 0037 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 2,500.00 | 10,000.00 | 2,000.00 | 8,000.00 | 2,000.00 | 8,000.00 | 2,500.00 | 10,000.00 |
| 0038 | 805-01-00100 | Class A Concrete | 61.51 | CUYD | 550.00 | 33,830.50 | 1,500.00 | 92,265.00 | 900.00 | 55,359.00 | 1,000.00 | 61,510.00 |
| 0039 | 805-03-00100 | Class AA Concrete | 40.36 | CUYD | 3,000.00 | 121,080.00 | 2,500.00 | 100,900.00 | 1,500.00 | 60,540.00 | 1,400.00 | 56,504.00 |
| 0040 | 806-01-00100 | Deformed Reinforcing Steel | 16,535 | LB | 1.00 | 16,535.00 | 2.00 | 33,070.00 | 1.60 | 26,456.00 | 1.00 | 16,535.00 |
| 0041 | 807-08-00100 | Structural Metalwork Movable Barrier Platform | 1 | LUMP | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 |
| 0042 | 807-08-00100 | Structural Metalwork Balance Block Pockets | 1 | LUMP | 75,000.00 | 75,000.00 | 70,000.00 | 70,000.00 | 110,000.00 | 110,000.00 | 60,000.00 | 60,000.00 |
| 0043 | 807-08-00100 | Structural Metalwork Cracked Structural Beams | 1 | LUMP | 85,000.00 | 85,000.00 | 80,000.00 | 80,000.00 | 150,000.00 | 150,000.00 | 95,000.00 | 95,000.00 |
| 0044 | 807-08-00100 | Structural Metalwork Bent Lateral Members | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 16,000.00 | 16,000.00 |
| 0045 | 807-08-00100 | Structural Metalwork Broken Welds | 1 | LUMP | 3,000.00 | 3,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 |
| 0046 | 807-08-00100 | Structural Metalwork Access Ladder Modification | 1 | LUMP | 500.00 | 500.00 | 1,200.00 | 1,200.00 | 1,500.00 | 1,500.00 | 5,000.00 | 5,000.00 |
| 0047 | 807-08-00100 | Structural Metalwork Electrical Junction Box Support | 1 | LUMP | 6,000.00 | 6,000.00 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 37,000.00 | 37,000.00 |
| 0048 | 807-08-00100 | Structural Metalwork Fender System | 1 | LUMP | 2,377,000.00 | 2,377,000.00 | 1,904,000.00 | 1,904,000.00 | 2,000,000.00 | 2,000,000.00 | 1,556,000.00 | 1,556,000.00 |
| 0049 | 807-08-00100 | Structural Metalwork Machinery Platform | 1 | LUMP | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 31,000.00 | 31,000.00 |
| 0050 | 807-08-00100 | Structural Metalwork Baffle | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 70,000.00 | 70,000.00 | 61,000.00 | 61,000.00 |
| 0051 | 807-08-00100 | Structural Metalwork Steel Plate Sidewalk | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 10,000.00 | 10,000.00 | 11,000.00 | 11,000.00 |
| 0052 | 808-01-00100 | Steel Grid Flooring | 2,413.7 | SQFT | 70.00 | 168,959.00 | 65.00 | 156,890.50 | 70.00 | 168,959.00 | 33.00 | 79,652.10 |
| 0053 | 809-01-00100 | Movable Bridge Machinery | 1 | LUMP | 929,000.00 | 929,000.00 | 1,300,000.00 | 1,300,000.00 | 900,000.00 | 900,000.00 | 1,000,000.00 | 1,000,000.00 |
| 0054 | 809-02-00100 | Traffic Barriers | 1 | LUMP | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | 332,000.00 | 332,000.00 | 380,000.00 | 380,000.00 |
| 0055 | 809-03-00100 | Operating House | 1 | LUMP | 775,000.00 | 775,000.00 | 175,000.00 | 175,000.00 | 500,000.00 | 500,000.00 | 500,000.00 | 500,000.00 |
| 0056 | 810-03-00100 | Pipe Railing Repair | 196.46 | LNFT | 150.00 | 29,469.00 | 90.00 | 17,681.40 | 100.00 | 19,646.00 | 100.00 | 19,646.00 |
| 0057 | 810-03-00100 | Pipe Railing | 60 | LNFT | 150.00 | 9,000.00 | 95.00 | 5,700.00 | 135.00 | 8,100.00 | 100.00 | 6,000.00 |
| 0058 | NS-730-00002 | Bridge Navigational Lighting System | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 10,500.00 | 10,500.00 | 12,000.00 | 12,000.00 |
| 0059 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) | 1 | LUMP | 850,000.00 | 850,000.00 | 1,100,000.00 | 1,100,000.00 | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 | 1,000,000.00 |
| 0060 | NS-800-00646 | Reinforced Plastic Composite Marine Timbers (8 x 12) | 3,962 | LF | 45.00 | 178,290.00 | 100.00 | 396,200.00 | 130.00 | 515,060.00 | 128.00 | 507,136.00 |
| CONTRACTOR TOTAL | 12,197,362.77 | 12,301,593.40 | 12,353,531.00 | 12,368,601.60 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Coastal Bridge Co., L.L.C. |
- 10 - Aquaterra Contracting, LLC |
- 11 - OCCI INC of Missouri |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 75,000.00 | 75,000.00 | 10,000.00 | 10,000.00 | 11,000.00 | 11,000.00 |
| 0002 | 202-02-00010 | Removal of Center Pivot Pier Cleaning | 1 | EACH | 52,000.00 | 52,000.00 | 10,000.00 | 10,000.00 | 33,804.00 | 33,804.00 |
| 0003 | 202-02-00010 | Removal of Balance Block Pockets | 2 | EACH | 2,750.00 | 5,500.00 | 900.00 | 1,800.00 | 4,940.00 | 9,880.00 |
| 0004 | 202-02-00010 | Removal of Bent Lateral Members | 4 | EACH | 700.00 | 2,800.00 | 500.00 | 2,000.00 | 321.00 | 1,284.00 |
| 0005 | 202-02-00010 | Removal of End Panel | 1 | EACH | 5,000.00 | 5,000.00 | 1,800.00 | 1,800.00 | 1,480.00 | 1,480.00 |
| 0006 | 202-02-00010 | Removal of Loose Bent Cap Concrete | 1 | EACH | 4,500.00 | 4,500.00 | 4,000.00 | 4,000.00 | 2,320.00 | 2,320.00 |
| 0007 | 202-02-00010 | Removal of Marine Sanitation Device | 1 | EACH | 1,100.00 | 1,100.00 | 1,000.00 | 1,000.00 | 5,710.00 | 5,710.00 |
| 0008 | 202-02-04024 | Removal of Bridge Components Barrier Rail | 1 | LUMP | 570.00 | 570.00 | 500.00 | 500.00 | 1,860.00 | 1,860.00 |
| 0009 | 202-02-04024 | Removal of Bridge Components Catwalk | 1 | LUMP | 119.00 | 119.00 | 1,000.00 | 1,000.00 | 3,160.00 | 3,160.00 |
| 0010 | 202-02-04024 | Removal of Bridge Components Concrete Sidewalk | 1 | LUMP | 4,465.00 | 4,465.00 | 2,000.00 | 2,000.00 | 6,780.00 | 6,780.00 |
| 0011 | 202-02-04024 | Removal of Bridge Components Cracked Structural Beams | 1 | LUMP | 7,400.00 | 7,400.00 | 15,000.00 | 15,000.00 | 15,400.00 | 15,400.00 |
| 0012 | 202-02-04024 | Removal of Bridge Components Steel Plate Sidewalk | 1 | LUMP | 1,855.00 | 1,855.00 | 900.00 | 900.00 | 3,040.00 | 3,040.00 |
| 0013 | 202-02-12300 | Removal of Fender System | 1 | EACH | 67,000.00 | 67,000.00 | 40,000.00 | 40,000.00 | 73,500.00 | 73,500.00 |
| 0014 | 202-02-30000 | Removal of Operators House | 1 | EACH | 13,500.00 | 13,500.00 | 22,000.00 | 22,000.00 | 100,000.00 | 100,000.00 |
| 0015 | 202-02-38020 | Removal of Sewer Treatment Plant | 1 | EACH | 1,900.00 | 1,900.00 | 3,000.00 | 3,000.00 | 29,400.00 | 29,400.00 |
| 0016 | 202-02-38400 | Removal of Structural Concrete Movable Barrier Platform | 1 | LUMP | 475.00 | 475.00 | 3,500.00 | 3,500.00 | 4,180.00 | 4,180.00 |
| 0017 | 202-02-40000 | Removal of Timber Piles | 14,550 | LNFT | 2.65 | 38,557.50 | 6.00 | 87,300.00 | 1.50 | 21,825.00 |
| 0018 | 203-01-00100 | General Excavation | 188 | CUYD | 17.00 | 3,196.00 | 30.00 | 5,640.00 | 18.00 | 3,384.00 |
| 0019 | 203-03-00100 | Embankment | 387 | CUYD | 37.50 | 14,512.50 | 35.00 | 13,545.00 | 20.00 | 7,740.00 |
| 0020 | 203-08-00100 | Geotextile Fabric | 706 | SQYD | 2.00 | 1,412.00 | 4.25 | 3,000.50 | 3.00 | 2,118.00 |
| 0021 | 204-06-00100 | Temporary Silt Fencing | 155 | LNFT | 9.00 | 1,395.00 | 6.00 | 930.00 | 2.00 | 310.00 |
| 0022 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 61 | LNFT | 23.00 | 1,403.00 | 60.00 | 3,660.00 | 9.50 | 579.50 |
| 0023 | 602-12-00100 | Undersealing Pavement | 27.1 | TON | 750.00 | 20,325.00 | 600.00 | 16,260.00 | 875.00 | 23,712.50 |
| 0024 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 351.7 | SQYD | 68.00 | 23,915.60 | 65.00 | 22,860.50 | 55.00 | 19,343.50 |
| 0025 | 710-01-00100 | Flowable Fill | 6 | CUYD | 985.00 | 5,910.00 | 460.00 | 2,760.00 | 386.00 | 2,316.00 |
| 0026 | 711-01-06000 | Riprap (250 lb, 30" Thick) | 615 | SQYD | 116.00 | 71,340.00 | 100.00 | 61,500.00 | 105.00 | 64,575.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 85,000.00 | 85,000.00 | 90,000.00 | 90,000.00 | 8,000.00 | 8,000.00 |
| 0028 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 5,000.00 | 1,000.00 | 6,000.00 | 1,200.00 | 1,100.00 | 220.00 |
| 0029 | 717-01-00100 | Seeding | 4 | LB | 55.00 | 220.00 | 70.00 | 280.00 | 276.00 | 1,104.00 |
| 0030 | 727-01-00100 | Mobilization | 1 | LUMP | 1,245,000.00 | 1,245,000.00 | 400,000.00 | 400,000.00 | 1,350,000.00 | 1,350,000.00 |
| 0031 | 730-09-00100 | Electrical System | 1 | LUMP | 1,963,500.00 | 1,963,500.00 | 1,990,000.00 | 1,990,000.00 | 2,421,900.00 | 2,421,900.00 |
| 0032 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 51,000.00 | 51,000.00 | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 |
| 0033 | 804-01-00600 | Precast Concrete Piles (24") | 464 | LNFT | 97.00 | 45,008.00 | 125.00 | 58,000.00 | 110.00 | 51,040.00 |
| 0034 | 804-03-01020 | Steel Piles (HP 10x42) | 51 | LNFT | 96.00 | 4,896.00 | 125.00 | 6,375.00 | 202.00 | 10,302.00 |
| 0035 | 804-03-02160 | Steel Piles (36" Pipe) | 13,185 | LNFT | 198.50 | 2,617,222.50 | 250.00 | 3,296,250.00 | 269.00 | 3,546,765.00 |
| 0036 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 |
| 0037 | 804-17-00100 | Dynamic Monitoring | 4 | EACH | 2,500.00 | 10,000.00 | 3,000.00 | 12,000.00 | 893.00 | 3,572.00 |
| 0038 | 805-01-00100 | Class A Concrete | 61.51 | CUYD | 1,650.00 | 101,491.50 | 1,100.00 | 67,661.00 | 800.00 | 49,208.00 |
| 0039 | 805-03-00100 | Class AA Concrete | 40.36 | CUYD | 2,550.00 | 102,918.00 | 1,000.00 | 40,360.00 | 1,800.00 | 72,648.00 |
| 0040 | 806-01-00100 | Deformed Reinforcing Steel | 16,535 | LB | 1.25 | 20,668.75 | 1.60 | 26,456.00 | 1.50 | 24,802.50 |
| 0041 | 807-08-00100 | Structural Metalwork Movable Barrier Platform | 1 | LUMP | 43,650.00 | 43,650.00 | 15,000.00 | 15,000.00 | 71,500.00 | 71,500.00 |
| 0042 | 807-08-00100 | Structural Metalwork Balance Block Pockets | 1 | LUMP | 102,000.00 | 102,000.00 | 70,000.00 | 70,000.00 | 67,900.00 | 67,900.00 |
| 0043 | 807-08-00100 | Structural Metalwork Cracked Structural Beams | 1 | LUMP | 95,000.00 | 95,000.00 | 65,000.00 | 65,000.00 | 143,500.00 | 143,500.00 |
| 0044 | 807-08-00100 | Structural Metalwork Bent Lateral Members | 1 | LUMP | 12,200.00 | 12,200.00 | 15,000.00 | 15,000.00 | 9,900.00 | 9,900.00 |
| 0045 | 807-08-00100 | Structural Metalwork Broken Welds | 1 | LUMP | 4,700.00 | 4,700.00 | 2,500.00 | 2,500.00 | 4,410.00 | 4,410.00 |
| 0046 | 807-08-00100 | Structural Metalwork Access Ladder Modification | 1 | LUMP | 900.00 | 900.00 | 1,000.00 | 1,000.00 | 635.00 | 635.00 |
| 0047 | 807-08-00100 | Structural Metalwork Electrical Junction Box Support | 1 | LUMP | 3,285.00 | 3,285.00 | 16,000.00 | 16,000.00 | 7,010.00 | 7,010.00 |
| 0048 | 807-08-00100 | Structural Metalwork Fender System | 1 | LUMP | 1,480,000.00 | 1,480,000.00 | 2,135,000.00 | 2,135,000.00 | 2,471,000.00 | 2,471,000.00 |
| 0049 | 807-08-00100 | Structural Metalwork Machinery Platform | 1 | LUMP | 24,000.00 | 24,000.00 | 10,000.00 | 10,000.00 | 5,160.00 | 5,160.00 |
| 0050 | 807-08-00100 | Structural Metalwork Baffle | 1 | LUMP | 69,000.00 | 69,000.00 | 70,000.00 | 70,000.00 | 86,100.00 | 86,100.00 |
| 0051 | 807-08-00100 | Structural Metalwork Steel Plate Sidewalk | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 14,900.00 | 14,900.00 |
| 0052 | 808-01-00100 | Steel Grid Flooring | 2,413.7 | SQFT | 78.00 | 188,268.60 | 50.00 | 120,685.00 | 60.00 | 144,822.00 |
| 0053 | 809-01-00100 | Movable Bridge Machinery | 1 | LUMP | 1,165,000.00 | 1,165,000.00 | 2,200,000.00 | 2,200,000.00 | 1,162,200.00 | 1,162,200.00 |
| 0054 | 809-02-00100 | Traffic Barriers | 1 | LUMP | 165,000.00 | 165,000.00 | 300,000.00 | 300,000.00 | 138,000.00 | 138,000.00 |
| 0055 | 809-03-00100 | Operating House | 1 | LUMP | 725,000.00 | 725,000.00 | 250,000.00 | 250,000.00 | 710,000.00 | 710,000.00 |
| 0056 | 810-03-00100 | Pipe Railing Repair | 196.46 | LNFT | 130.00 | 25,539.80 | 25.00 | 4,911.50 | 115.00 | 22,592.90 |
| 0057 | 810-03-00100 | Pipe Railing | 60 | LNFT | 120.00 | 7,200.00 | 140.00 | 8,400.00 | 143.00 | 8,580.00 |
| 0058 | NS-730-00002 | Bridge Navigational Lighting System | 1 | LUMP | 30,000.00 | 30,000.00 | 13,000.00 | 13,000.00 | 33,100.00 | 33,100.00 |
| 0059 | NS-800-00020 | Cleaning, Painting and Disposal (Near White Finish) | 1 | LUMP | 1,200,000.00 | 1,200,000.00 | 1,500,000.00 | 1,500,000.00 | 1,040,000.00 | 1,040,000.00 |
| 0060 | NS-800-00646 | Reinforced Plastic Composite Marine Timbers (8 x 12) | 3,962 | LF | 110.00 | 435,820.00 | 100.00 | 396,200.00 | 117.00 | 463,554.00 |
| CONTRACTOR TOTAL | 12,459,738.75 | 13,589,234.50 | 14,625,626.90 | |||||||