LA DOTD Headquarters
| Lead Project: H.008309.6 | |
| Parish: St. Charles | |
| Routes: LA 50 | |
| Description: LA 50 Drainage/Safety Improvements | |
| Type Const: DRAINAGE STRUCTURES, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $1,277,025.25 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,292,855.50 |
| 2 | 01033 | Wallace C. Drennan, Inc. | $1,297,639.20 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $1,386,998.25 |
| 4 | 11242 | Gilmore & Son Construction Corp. | $1,417,427.95 |
| 5 | 38610 | Three C's Properties Inc | $1,471,744.54 |
| 6 | 48896 | Command Construction Industries LLC | $1,476,371.27 |
| 7 | 14914 | Kass Bros. Inc. | $1,569,650.05 |
| 8 | 12198 | Byron E. Talbot Contractor, Inc. | $1,682,169.16 |
| 9 | 04435 | Thigpen Construction Co., Inc. | $1,730,229.30 |
| 10 | 00935 | Fleming Construction Co., Inc. | $1,819,455.70 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Wallace C. Drennan, Inc. |
- 3 - Boh Bros. Construction Co., LLC. |
- 4 - Gilmore & Son Construction Corp. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 19,000.00 | 19,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,500.00 | 1,500.00 | 1,000.00 | 1,000.00 | 600.00 | 600.00 | 2,000.00 | 2,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 623 | SQYD | 21.00 | 13,083.00 | 3.00 | 1,869.00 | 10.00 | 6,230.00 | 5.00 | 3,115.00 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 15" 18" 24" 30" 36" 48" | 1,396 | LNFT | 12.00 | 16,752.00 | 1.00 | 1,396.00 | 6.00 | 8,376.00 | 4.00 | 5,584.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,200 | CUYD | 20.00 | 24,000.00 | 5.00 | 6,000.00 | 25.00 | 30,000.00 | 10.00 | 12,000.00 |
| 0006 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 47.22 | CUYD | 120.00 | 5,666.40 | 50.00 | 2,361.00 | 45.00 | 2,124.90 | 70.00 | 3,305.40 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 1,484.27 | TON | 110.00 | 163,269.70 | 150.00 | 222,640.50 | 120.00 | 178,112.40 | 115.00 | 170,691.05 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 139.33 | TON | 250.00 | 34,832.50 | 150.00 | 20,899.50 | 120.00 | 16,719.60 | 250.00 | 34,832.50 |
| 0009 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 374 | LNFT | 50.00 | 18,700.00 | 55.00 | 20,570.00 | 55.00 | 20,570.00 | 60.00 | 22,440.00 |
| 0010 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,372 | LNFT | 63.00 | 86,436.00 | 65.00 | 89,180.00 | 70.00 | 96,040.00 | 75.00 | 102,900.00 |
| 0011 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 524 | LNFT | 74.00 | 38,776.00 | 85.00 | 44,540.00 | 90.00 | 47,160.00 | 110.00 | 57,640.00 |
| 0012 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,150 | LNFT | 91.00 | 104,650.00 | 100.00 | 115,000.00 | 110.00 | 126,500.00 | 140.00 | 161,000.00 |
| 0013 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 614 | LNFT | 150.00 | 92,100.00 | 150.00 | 92,100.00 | 165.00 | 101,310.00 | 190.00 | 116,660.00 |
| 0014 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 516 | LNFT | 120.00 | 61,920.00 | 130.00 | 67,080.00 | 135.00 | 69,660.00 | 180.00 | 92,880.00 |
| 0015 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 250 | LNFT | 150.00 | 37,500.00 | 155.00 | 38,750.00 | 160.00 | 40,000.00 | 200.00 | 50,000.00 |
| 0016 | 701-07-00300 | Yard Drain Pipe (8") | 412 | LNFT | 48.00 | 19,776.00 | 30.00 | 12,360.00 | 30.00 | 12,360.00 | 40.00 | 16,480.00 |
| 0017 | 701-07-00600 | Yard Drain Pipe (15") | 27 | LNFT | 60.00 | 1,620.00 | 50.00 | 1,350.00 | 50.00 | 1,350.00 | 50.00 | 1,350.00 |
| 0018 | 701-15-00100 | Concrete Collar | 3 | EACH | 2,000.00 | 6,000.00 | 1,000.00 | 3,000.00 | 3,500.00 | 10,500.00 | 800.00 | 2,400.00 |
| 0019 | 702-01-00100 | Junction Boxes CONFLICT BOXES | 6 | EACH | 9,000.00 | 54,000.00 | 3,500.00 | 21,000.00 | 5,000.00 | 30,000.00 | 4,000.00 | 24,000.00 |
| 0020 | 702-02-00400 | Manholes (R-CB-32) Sta. 79+59 | 1 | EACH | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 8,300.00 | 8,300.00 | 3,700.00 | 3,700.00 |
| 0021 | 702-02-00400 | Manholes (R-CB-32) Sta. 79+33 | 1 | EACH | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 8,300.00 | 8,300.00 | 3,500.00 | 3,500.00 |
| 0022 | 702-03-00100 | Catch Basins (CB-01) | 30 | EACH | 2,300.00 | 69,000.00 | 3,000.00 | 90,000.00 | 2,400.00 | 72,000.00 | 2,500.00 | 75,000.00 |
| 0023 | 702-03-00200 | Catch Basins (CB-02) | 18 | EACH | 4,000.00 | 72,000.00 | 5,000.00 | 90,000.00 | 3,300.00 | 59,400.00 | 3,200.00 | 57,600.00 |
| 0024 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 1,800.00 | 1,800.00 | 2,500.00 | 2,500.00 |
| 0025 | 702-03-00400 | Catch Basins (CB-05) | 15 | EACH | 950.00 | 14,250.00 | 1,400.00 | 21,000.00 | 1,200.00 | 18,000.00 | 1,000.00 | 15,000.00 |
| 0026 | 702-04-00100 | Adjusting Manholes | 7 | EACH | 750.00 | 5,250.00 | 300.00 | 2,100.00 | 500.00 | 3,500.00 | 500.00 | 3,500.00 |
| 0027 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 400.00 | 400.00 | 300.00 | 300.00 | 350.00 | 350.00 | 600.00 | 600.00 |
| 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 623 | SQYD | 66.00 | 41,118.00 | 75.00 | 46,725.00 | 100.00 | 62,300.00 | 70.00 | 43,610.00 |
| 0029 | 707-01-00100 | Concrete Curb | 40 | LNFT | 27.00 | 1,080.00 | 50.00 | 2,000.00 | 65.00 | 2,600.00 | 30.00 | 1,200.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 | 85,000.00 | 85,000.00 | 30,000.00 | 30,000.00 |
| 0031 | 717-01-00100 | Seeding | 23 | LB | 25.00 | 575.00 | 10.00 | 230.00 | 6.00 | 138.00 | 35.00 | 805.00 |
| 0032 | 718-01-00100 | Fertilizer | 1,157 | LB | 0.90 | 1,041.30 | 1.00 | 1,157.00 | 0.50 | 578.50 | 1.00 | 1,157.00 |
| 0033 | 726-01-00100 | Bedding Material | 1,349.11 | CUYD | 60.00 | 80,946.60 | 20.00 | 26,982.20 | 65.00 | 87,692.15 | 80.00 | 107,928.80 |
| 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 114,000.00 | 114,000.00 | 100,000.00 | 100,000.00 | 95,000.00 | 95,000.00 | 60,000.00 | 60,000.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.96 | MILE | 5,500.00 | 5,280.00 | 5,000.00 | 4,800.00 | 5,300.00 | 5,088.00 | 8,000.00 | 7,680.00 |
| 0036 | 735-01-00100 | Mailboxes | 13 | EACH | 5.00 | 65.00 | 5.00 | 65.00 | 25.00 | 325.00 | 250.00 | 3,250.00 |
| 0037 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 190.00 | 2,470.00 | 200.00 | 2,600.00 | 200.00 | 2,600.00 | 150.00 | 1,950.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 25,000.00 | 25,000.00 |
| 0039 | 741-06-00100 | Relocating Fire Hydrant | 3 | EACH | 3,200.00 | 9,600.00 | 2,500.00 | 7,500.00 | 3,000.00 | 9,000.00 | 2,000.00 | 6,000.00 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 31,212 | INLF | 0.35 | 10,924.20 | 1.00 | 31,212.00 | 0.50 | 15,606.00 | 2.00 | 62,424.00 |
| 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,250 | INLF | 0.90 | 2,025.00 | 1.00 | 2,250.00 | 1.25 | 2,812.50 | 3.00 | 6,750.00 |
| 0042 | 202-02-02020 | Removal of Asphalt Pavement | 1,124.4 | SQYD | 2.00 | 2,248.80 | 5.00 | 5,622.00 | 8.00 | 8,995.20 | 8.00 | 8,995.20 |
| CONTRACTOR TOTAL | 1,292,855.50 | 1,297,639.20 | 1,386,998.25 | 1,417,427.95 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Three C's Properties Inc |
- 6 - Command Construction Industries LLC |
- 7 - Kass Bros. Inc. |
- 8 - Byron E. Talbot Contractor, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 13,925.00 | 13,925.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 40,000.00 | 40,000.00 |
| 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 1,050.00 | 1,050.00 | 250.00 | 250.00 | 1,250.00 | 1,250.00 | 300.00 | 300.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 623 | SQYD | 8.50 | 5,295.50 | 10.00 | 6,230.00 | 12.00 | 7,476.00 | 6.60 | 4,111.80 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 15" 18" 24" 30" 36" 48" | 1,396 | LNFT | 13.50 | 18,846.00 | 10.00 | 13,960.00 | 21.25 | 29,665.00 | 6.25 | 8,725.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,200 | CUYD | 26.25 | 31,500.00 | 25.00 | 30,000.00 | 37.50 | 45,000.00 | 20.00 | 24,000.00 |
| 0006 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 47.22 | CUYD | 54.00 | 2,549.88 | 75.00 | 3,541.50 | 60.00 | 2,833.20 | 100.00 | 4,722.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 1,484.27 | TON | 131.00 | 194,439.37 | 120.00 | 178,112.40 | 155.00 | 230,061.85 | 108.00 | 160,301.16 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 139.33 | TON | 147.00 | 20,481.51 | 200.00 | 27,866.00 | 155.00 | 21,596.15 | 214.00 | 29,816.62 |
| 0009 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 374 | LNFT | 71.70 | 26,815.80 | 60.00 | 22,440.00 | 76.00 | 28,424.00 | 111.00 | 41,514.00 |
| 0010 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,372 | LNFT | 88.70 | 121,696.40 | 70.00 | 96,040.00 | 92.00 | 126,224.00 | 122.00 | 167,384.00 |
| 0011 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 524 | LNFT | 103.40 | 54,181.60 | 90.00 | 47,160.00 | 118.00 | 61,832.00 | 151.00 | 79,124.00 |
| 0012 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,150 | LNFT | 128.40 | 147,660.00 | 100.00 | 115,000.00 | 135.50 | 155,825.00 | 182.00 | 209,300.00 |
| 0013 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 614 | LNFT | 175.55 | 107,787.70 | 160.00 | 98,240.00 | 194.00 | 119,116.00 | 268.00 | 164,552.00 |
| 0014 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 516 | LNFT | 160.80 | 82,972.80 | 150.00 | 77,400.00 | 171.00 | 88,236.00 | 220.00 | 113,520.00 |
| 0015 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 250 | LNFT | 246.95 | 61,737.50 | 200.00 | 50,000.00 | 192.00 | 48,000.00 | 274.00 | 68,500.00 |
| 0016 | 701-07-00300 | Yard Drain Pipe (8") | 412 | LNFT | 39.05 | 16,088.60 | 25.00 | 10,300.00 | 26.50 | 10,918.00 | 22.00 | 9,064.00 |
| 0017 | 701-07-00600 | Yard Drain Pipe (15") | 27 | LNFT | 93.25 | 2,517.75 | 50.00 | 1,350.00 | 107.00 | 2,889.00 | 40.00 | 1,080.00 |
| 0018 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,374.30 | 4,122.90 | 1,500.00 | 4,500.00 | 1,825.00 | 5,475.00 | 675.00 | 2,025.00 |
| 0019 | 702-01-00100 | Junction Boxes CONFLICT BOXES | 6 | EACH | 5,494.50 | 32,967.00 | 10,000.00 | 60,000.00 | 3,750.00 | 22,500.00 | 6,000.00 | 36,000.00 |
| 0020 | 702-02-00400 | Manholes (R-CB-32) Sta. 79+59 | 1 | EACH | 4,234.00 | 4,234.00 | 10,000.00 | 10,000.00 | 6,260.00 | 6,260.00 | 4,800.00 | 4,800.00 |
| 0021 | 702-02-00400 | Manholes (R-CB-32) Sta. 79+33 | 1 | EACH | 4,635.00 | 4,635.00 | 10,000.00 | 10,000.00 | 6,260.00 | 6,260.00 | 4,400.00 | 4,400.00 |
| 0022 | 702-03-00100 | Catch Basins (CB-01) | 30 | EACH | 2,748.15 | 82,444.50 | 4,000.00 | 120,000.00 | 3,420.00 | 102,600.00 | 2,600.00 | 78,000.00 |
| 0023 | 702-03-00200 | Catch Basins (CB-02) | 18 | EACH | 4,264.20 | 76,755.60 | 5,000.00 | 90,000.00 | 4,420.00 | 79,560.00 | 3,600.00 | 64,800.00 |
| 0024 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 2,727.35 | 2,727.35 | 2,000.00 | 2,000.00 | 3,090.00 | 3,090.00 | 1,650.00 | 1,650.00 |
| 0025 | 702-03-00400 | Catch Basins (CB-05) | 15 | EACH | 919.00 | 13,785.00 | 500.00 | 7,500.00 | 1,200.00 | 18,000.00 | 1,000.00 | 15,000.00 |
| 0026 | 702-04-00100 | Adjusting Manholes | 7 | EACH | 1,075.00 | 7,525.00 | 500.00 | 3,500.00 | 570.00 | 3,990.00 | 325.00 | 2,275.00 |
| 0027 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 800.00 | 800.00 | 450.00 | 450.00 | 525.00 | 525.00 | 435.00 | 435.00 |
| 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 623 | SQYD | 83.50 | 52,020.50 | 50.00 | 31,150.00 | 70.00 | 43,610.00 | 66.75 | 41,585.25 |
| 0029 | 707-01-00100 | Concrete Curb | 40 | LNFT | 27.00 | 1,080.00 | 12.00 | 480.00 | 35.00 | 1,400.00 | 27.55 | 1,102.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 22,800.00 | 22,800.00 | 1,000.00 | 1,000.00 | 38,000.00 | 38,000.00 | 35,000.00 | 35,000.00 |
| 0031 | 717-01-00100 | Seeding | 23 | LB | 10.00 | 230.00 | 10.00 | 230.00 | 32.00 | 736.00 | 27.50 | 632.50 |
| 0032 | 718-01-00100 | Fertilizer | 1,157 | LB | 1.50 | 1,735.50 | 1.01 | 1,168.57 | 1.20 | 1,388.40 | 1.00 | 1,157.00 |
| 0033 | 726-01-00100 | Bedding Material | 1,349.11 | CUYD | 72.55 | 97,877.93 | 80.00 | 107,928.80 | 75.00 | 101,183.25 | 75.00 | 101,183.25 |
| 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 79,533.25 | 79,533.25 | 140,000.00 | 140,000.00 | 26,600.00 | 26,600.00 | 80,000.00 | 80,000.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.96 | MILE | 7,350.00 | 7,056.00 | 6,000.00 | 5,760.00 | 8,500.00 | 8,160.00 | 5,300.00 | 5,088.00 |
| 0036 | 735-01-00100 | Mailboxes | 13 | EACH | 30.00 | 390.00 | 1.00 | 13.00 | 6.50 | 84.50 | 6.00 | 78.00 |
| 0037 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 150.00 | 1,950.00 | 135.00 | 1,755.00 | 230.00 | 2,990.00 | 200.00 | 2,600.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,800.00 | 12,800.00 | 1,000.00 | 1,000.00 | 50,000.00 | 50,000.00 | 27,500.00 | 27,500.00 |
| 0039 | 741-06-00100 | Relocating Fire Hydrant | 3 | EACH | 3,500.00 | 10,500.00 | 2,500.00 | 7,500.00 | 4,675.00 | 14,025.00 | 2,500.00 | 7,500.00 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 31,212 | INLF | 1.10 | 34,333.20 | 2.00 | 62,424.00 | 1.00 | 31,212.00 | 1.05 | 32,772.60 |
| 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,250 | INLF | 1.40 | 3,150.00 | 2.00 | 4,500.00 | 1.35 | 3,037.50 | 1.35 | 3,037.50 |
| 0042 | 202-02-02020 | Removal of Asphalt Pavement | 1,124.4 | SQYD | 6.00 | 6,746.40 | 5.00 | 5,622.00 | 13.00 | 14,617.20 | 6.70 | 7,533.48 |
| CONTRACTOR TOTAL | 1,471,744.54 | 1,476,371.27 | 1,569,650.05 | 1,682,169.16 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Thigpen Construction Co., Inc. |
- 10 - Fleming Construction Co., Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-02-06060 | Removal of Concrete Catch Basin | 1 | EACH | 500.00 | 500.00 | 300.00 | 300.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 623 | SQYD | 15.00 | 9,345.00 | 20.00 | 12,460.00 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) 15" 18" 24" 30" 36" 48" | 1,396 | LNFT | 15.00 | 20,940.00 | 10.00 | 13,960.00 |
| 0005 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,200 | CUYD | 15.00 | 18,000.00 | 20.00 | 24,000.00 |
| 0006 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 47.22 | CUYD | 200.00 | 9,444.00 | 100.00 | 4,722.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 1,484.27 | TON | 150.00 | 222,640.50 | 135.00 | 200,376.45 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 139.33 | TON | 400.00 | 55,732.00 | 145.00 | 20,202.85 |
| 0009 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 374 | LNFT | 110.00 | 41,140.00 | 90.00 | 33,660.00 |
| 0010 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 1,372 | LNFT | 80.00 | 109,760.00 | 100.00 | 137,200.00 |
| 0011 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 524 | LNFT | 120.00 | 62,880.00 | 130.00 | 68,120.00 |
| 0012 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 1,150 | LNFT | 140.00 | 161,000.00 | 150.00 | 172,500.00 |
| 0013 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 614 | LNFT | 240.00 | 147,360.00 | 200.00 | 122,800.00 |
| 0014 | 701-04-01100 | Storm Drain Pipe Arch (42" Equiv. RCPA) | 516 | LNFT | 210.00 | 108,360.00 | 190.00 | 98,040.00 |
| 0015 | 701-04-01120 | Storm Drain Pipe Arch (48" Equiv. RCPA) | 250 | LNFT | 240.00 | 60,000.00 | 215.00 | 53,750.00 |
| 0016 | 701-07-00300 | Yard Drain Pipe (8") | 412 | LNFT | 100.00 | 41,200.00 | 30.00 | 12,360.00 |
| 0017 | 701-07-00600 | Yard Drain Pipe (15") | 27 | LNFT | 100.00 | 2,700.00 | 70.00 | 1,890.00 |
| 0018 | 701-15-00100 | Concrete Collar | 3 | EACH | 2,000.00 | 6,000.00 | 3,500.00 | 10,500.00 |
| 0019 | 702-01-00100 | Junction Boxes CONFLICT BOXES | 6 | EACH | 7,000.00 | 42,000.00 | 4,000.00 | 24,000.00 |
| 0020 | 702-02-00400 | Manholes (R-CB-32) Sta. 79+59 | 1 | EACH | 7,000.00 | 7,000.00 | 7,000.00 | 7,000.00 |
| 0021 | 702-02-00400 | Manholes (R-CB-32) Sta. 79+33 | 1 | EACH | 7,000.00 | 7,000.00 | 7,000.00 | 7,000.00 |
| 0022 | 702-03-00100 | Catch Basins (CB-01) | 30 | EACH | 3,000.00 | 90,000.00 | 5,000.00 | 150,000.00 |
| 0023 | 702-03-00200 | Catch Basins (CB-02) | 18 | EACH | 3,700.00 | 66,600.00 | 6,000.00 | 108,000.00 |
| 0024 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 2,300.00 | 2,300.00 | 6,000.00 | 6,000.00 |
| 0025 | 702-03-00400 | Catch Basins (CB-05) | 15 | EACH | 1,000.00 | 15,000.00 | 5,000.00 | 75,000.00 |
| 0026 | 702-04-00100 | Adjusting Manholes | 7 | EACH | 1,500.00 | 10,500.00 | 500.00 | 3,500.00 |
| 0027 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 1 | EACH | 1,000.00 | 1,000.00 | 700.00 | 700.00 |
| 0028 | 706-02-00200 | Concrete Drive (6" Thick) | 623 | SQYD | 100.00 | 62,300.00 | 75.00 | 46,725.00 |
| 0029 | 707-01-00100 | Concrete Curb | 40 | LNFT | 50.00 | 2,000.00 | 60.00 | 2,400.00 |
| 0030 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 |
| 0031 | 717-01-00100 | Seeding | 23 | LB | 20.00 | 460.00 | 20.00 | 460.00 |
| 0032 | 718-01-00100 | Fertilizer | 1,157 | LB | 3.00 | 3,471.00 | 2.00 | 2,314.00 |
| 0033 | 726-01-00100 | Bedding Material | 1,349.11 | CUYD | 80.00 | 107,928.80 | 90.00 | 121,419.90 |
| 0034 | 727-01-00100 | Mobilization | 1 | LUMP | 60,000.00 | 60,000.00 | 150,000.00 | 150,000.00 |
| 0035 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.96 | MILE | 10,000.00 | 9,600.00 | 5,000.00 | 4,800.00 |
| 0036 | 735-01-00100 | Mailboxes | 13 | EACH | 150.00 | 1,950.00 | 5.00 | 65.00 |
| 0037 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 150.00 | 1,950.00 | 180.00 | 2,340.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 |
| 0039 | 741-06-00100 | Relocating Fire Hydrant | 3 | EACH | 3,000.00 | 9,000.00 | 5,000.00 | 15,000.00 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 31,212 | INLF | 2.00 | 62,424.00 | 1.00 | 31,212.00 |
| 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,250 | INLF | 2.00 | 4,500.00 | 1.25 | 2,812.50 |
| 0042 | 202-02-02020 | Removal of Asphalt Pavement | 1,124.4 | SQYD | 10.00 | 11,244.00 | 15.00 | 16,866.00 |
| CONTRACTOR TOTAL | 1,730,229.30 | 1,819,455.70 | ||||||