Bid Tabulations
Letting of
09/11/2013
LA DOTD Headquarters
| Lead Project: H.008248.6-R2 | |
| Parish: Pointe Coupee | |
| Routes: LA 1 | |
| Description: LA 1: Hospital Road & WB Left Turn Lane | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, CLASS II BASE COURSE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $3,471,838.97 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $3,289,167.04 |
| 2 | 00046 | Barber Bros. Contracting Co., L.L.C | $3,682,877.91 |
| 3 | 00849 | F. G. Sullivan, Jr. Contractor LLC | $3,794,972.70 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $3,862,399.22 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - Barber Bros. Contracting Co., L.L.C |
- 3 - F. G. Sullivan, Jr. Contractor LLC |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 8,000.00 | 8,000.00 | 1,500.00 | 1,500.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 35,000.00 | 35,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 1,252 | SQYD | 10.00 | 12,520.00 | 10.00 | 12,520.00 | 5.00 | 6,260.00 | 12.50 | 15,650.00 |
| 0004 | 202-02-06040 | Removal of Concrete Box Headwall STATION 142+95.76 | 2 | EACH | 1,500.00 | 3,000.00 | 3,300.00 | 6,600.00 | 700.00 | 1,400.00 | 1,000.00 | 2,000.00 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 95.2 | SQYD | 15.00 | 1,428.00 | 53.00 | 5,045.60 | 12.00 | 1,142.40 | 27.50 | 2,618.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 169 | LNFT | 20.00 | 3,380.00 | 8.00 | 1,352.00 | 7.00 | 1,183.00 | 26.50 | 4,478.50 |
| 0007 | 202-02-32120 | Removal of Pipe (Side Drain) FOR LOCATIONS SEE PLAN / PROFILE SHEETS | 945 | LNFT | 10.00 | 9,450.00 | 20.00 | 18,900.00 | 5.00 | 4,725.00 | 6.50 | 6,142.50 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,951.1 | SQYD | 7.75 | 15,121.03 | 6.00 | 11,706.60 | 15.00 | 29,266.50 | 7.35 | 14,340.59 |
| 0009 | 202-02-46000 | Removal of Walls | 180 | SQFT | 12.00 | 2,160.00 | 31.00 | 5,580.00 | 80.00 | 14,400.00 | 16.00 | 2,880.00 |
| 0010 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 75,000.00 | 75,000.00 | 95,000.00 | 95,000.00 | 100,000.00 | 100,000.00 | 110,000.00 | 110,000.00 |
| 0011 | 203-07-00100 | Borrow (Vehicular Measurement) | 9,905 | CUYD | 10.00 | 99,050.00 | 10.50 | 104,002.50 | 20.00 | 198,100.00 | 16.00 | 158,480.00 |
| 0012 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 901 | CUYD | 15.00 | 13,515.00 | 26.00 | 23,426.00 | 20.00 | 18,020.00 | 25.00 | 22,525.00 |
| 0013 | 204-02-00100 | Temporary Hay or Straw Bales | 203 | EACH | 12.00 | 2,436.00 | 14.00 | 2,842.00 | 11.50 | 2,334.50 | 20.00 | 4,060.00 |
| 0014 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 26 | EACH | 110.00 | 2,860.00 | 175.00 | 4,550.00 | 108.00 | 2,808.00 | 250.00 | 6,500.00 |
| 0015 | 204-06-00100 | Temporary Silt Fencing | 22,850 | LNFT | 0.75 | 17,137.50 | 2.00 | 45,700.00 | 1.50 | 34,275.00 | 1.75 | 39,987.50 |
| 0016 | 302-02-06020 | Class II Base Course (12" Thick) (Soil Cement) | 3,961.8 | SQYD | 15.00 | 59,427.00 | 12.50 | 49,522.50 | 25.00 | 99,045.00 | 13.35 | 52,890.03 |
| 0017 | 302-02-06080 | Class II Base Course (12" Thick) (Asphaltic Concrete Base on Embankment Layer) | 1,949.4 | SQYD | 50.00 | 97,470.00 | 45.00 | 87,723.00 | 50.00 | 97,470.00 | 60.00 | 116,964.00 |
| 0018 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 13,850 | SQYD | 10.00 | 138,500.00 | 12.00 | 166,200.00 | 14.00 | 193,900.00 | 15.50 | 214,675.00 |
| 0019 | 304-05-00100 | Lime Treatment (Type E) | 17.77 | TON | 50.00 | 888.50 | 475.00 | 8,440.75 | 1,200.00 | 21,324.00 | 850.00 | 15,104.50 |
| 0020 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 55.5 | CUYD | 25.00 | 1,387.50 | 100.00 | 5,550.00 | 65.00 | 3,607.50 | 100.00 | 5,550.00 |
| 0021 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 600 | CUYD | 25.00 | 15,000.00 | 45.00 | 27,000.00 | 90.00 | 54,000.00 | 50.00 | 30,000.00 |
| 0022 | 502-01-00100 | Superpave Asphaltic Concrete | 11,031.9 | TON | 92.00 | 1,014,934.80 | 90.00 | 992,871.00 | 95.00 | 1,048,030.50 | 98.00 | 1,081,126.20 |
| 0023 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 953.9 | TON | 140.00 | 133,546.00 | 120.00 | 114,468.00 | 160.00 | 152,624.00 | 190.00 | 181,241.00 |
| 0024 | 509-01-00100 | Cold Planing Asphaltic Pavement | 34,535.2 | SQYD | 2.00 | 69,070.40 | 3.25 | 112,239.40 | 3.00 | 103,605.60 | 3.25 | 112,239.40 |
| 0025 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,378 | CUYD | 15.00 | -20,670.00 | 0.10 | -137.80 | 0.00 | 0.00 | 0.10 | -137.80 |
| 0026 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 1,200 | SQYD | 50.00 | 60,000.00 | 85.00 | 102,000.00 | 100.00 | 120,000.00 | 100.00 | 120,000.00 |
| 0027 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 221 | LNFT | 35.00 | 7,735.00 | 75.00 | 16,575.00 | 35.00 | 7,735.00 | 50.00 | 11,050.00 |
| 0028 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 85 | LNFT | 50.00 | 4,250.00 | 85.00 | 7,225.00 | 46.00 | 3,910.00 | 72.00 | 6,120.00 |
| 0029 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 382 | LNFT | 65.00 | 24,830.00 | 130.00 | 49,660.00 | 94.00 | 35,908.00 | 95.00 | 36,290.00 |
| 0030 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 130 | LNFT | 80.00 | 10,400.00 | 190.00 | 24,700.00 | 99.00 | 12,870.00 | 115.00 | 14,950.00 |
| 0031 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 454 | LNFT | 100.00 | 45,400.00 | 125.00 | 56,750.00 | 138.00 | 62,652.00 | 160.00 | 72,640.00 |
| 0032 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 50 | LNFT | 130.00 | 6,500.00 | 150.00 | 7,500.00 | 166.00 | 8,300.00 | 185.00 | 9,250.00 |
| 0033 | 701-03-02080 | Storm Drain Pipe (Outfall) (36" PP or 42" CMP) | 303 | LNFT | 85.00 | 25,755.00 | 190.00 | 57,570.00 | 100.00 | 30,300.00 | 110.00 | 33,330.00 |
| 0034 | 701-04-01160 | Storm Drain Pipe Arch (60" Equiv. RCPA) | 1,155 | LNFT | 350.00 | 404,250.00 | 250.00 | 288,750.00 | 286.00 | 330,330.00 | 265.00 | 306,075.00 |
| 0035 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 15 | LNFT | 75.00 | 1,125.00 | 350.00 | 5,250.00 | 100.00 | 1,500.00 | 160.00 | 2,400.00 |
| 0036 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,000.00 | 2,000.00 | 2,500.00 | 5,000.00 | 1,000.00 | 2,000.00 | 1,700.00 | 3,400.00 |
| 0037 | 702-02-00100 | Manholes (MH-06) | 23 | EACH | 5,000.00 | 115,000.00 | 9,000.00 | 207,000.00 | 10,000.00 | 230,000.00 | 5,500.00 | 126,500.00 |
| 0038 | 702-03-00100 | Catch Basins (CB-01) | 29 | EACH | 2,500.00 | 72,500.00 | 4,000.00 | 116,000.00 | 3,000.00 | 87,000.00 | 3,500.00 | 101,500.00 |
| 0039 | 702-03-00200 | Catch Basins (CB-02) | 2 | EACH | 4,500.00 | 9,000.00 | 6,400.00 | 12,800.00 | 5,300.00 | 10,600.00 | 3,700.00 | 7,400.00 |
| 0040 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 12 | EACH | 175.00 | 2,100.00 | 1,780.00 | 21,360.00 | 600.00 | 7,200.00 | 1,300.00 | 15,600.00 |
| 0041 | 704-03-00100 | Blocked Out Guard Rail | 226.3 | LNFT | 20.00 | 4,526.00 | 25.00 | 5,657.50 | 22.00 | 4,978.60 | 24.00 | 5,431.20 |
| 0042 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 68.00 | 6,800.00 | 80.00 | 8,000.00 | 70.00 | 7,000.00 | 75.00 | 7,500.00 |
| 0043 | 704-10-00100 | Guard Rail Anchor Block | 4 | EACH | 2,600.00 | 10,400.00 | 3,700.00 | 14,800.00 | 2,200.00 | 8,800.00 | 2,500.00 | 10,000.00 |
| 0044 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 2,200.00 | 2,200.00 | 2,500.00 | 2,500.00 |
| 0045 | 706-02-00300 | Concrete Drive (8" Thick) | 125 | SQYD | 70.00 | 8,750.00 | 90.00 | 11,250.00 | 70.00 | 8,750.00 | 100.00 | 12,500.00 |
| 0046 | 707-03-00100 | Combination Concrete Curb and Gutter | 80 | LNFT | 36.00 | 2,880.00 | 50.00 | 4,000.00 | 55.00 | 4,400.00 | 67.00 | 5,360.00 |
| 0047 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 110,000.00 | 110,000.00 | 160,000.00 | 160,000.00 | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 |
| 0048 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 450 | LNFT | 0.25 | 112.50 | 0.30 | 135.00 | 0.25 | 112.50 | 0.30 | 135.00 |
| 0049 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.8 | MILE | 250.00 | 4,700.00 | 375.00 | 7,050.00 | 300.00 | 5,640.00 | 250.00 | 4,700.00 |
| 0050 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.76 | MILE | 1.00 | 3.76 | 540.00 | 2,030.40 | 250.00 | 940.00 | 260.00 | 977.60 |
| 0051 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 40.096 | MILE | 1.00 | 40.10 | 650.00 | 26,062.40 | 350.00 | 14,033.60 | 400.00 | 16,038.40 |
| 0052 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 45 | EACH | 15.00 | 675.00 | 51.00 | 2,295.00 | 15.00 | 675.00 | 16.00 | 720.00 |
| 0053 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 5 | EACH | 25.00 | 125.00 | 51.00 | 255.00 | 25.00 | 125.00 | 27.00 | 135.00 |
| 0054 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 52.00 | 104.00 | 95.00 | 190.00 | 50.00 | 100.00 | 50.00 | 100.00 |
| 0055 | 717-01-00100 | Seeding | 343 | LB | 12.00 | 4,116.00 | 14.00 | 4,802.00 | 11.00 | 3,773.00 | 11.00 | 3,773.00 |
| 0056 | 718-01-00100 | Fertilizer | 11,700 | LB | 0.65 | 7,605.00 | 1.25 | 14,625.00 | 0.60 | 7,020.00 | 0.40 | 4,680.00 |
| 0057 | 726-01-00100 | Bedding Material | 473.4 | CUYD | 75.00 | 35,505.00 | 60.00 | 28,404.00 | 120.00 | 56,808.00 | 100.00 | 47,340.00 |
| 0058 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 | 200,000.00 | 200,000.00 | 178,000.00 | 178,000.00 | 370,000.00 | 370,000.00 |
| 0059 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 46.00 | 92.00 | 74.00 | 148.00 | 65.00 | 130.00 | 70.00 | 140.00 |
| 0060 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 85.00 | 340.00 | 75.00 | 300.00 | 80.00 | 320.00 |
| 0061 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,065 | EACH | 5.25 | 5,591.25 | 6.00 | 6,390.00 | 5.00 | 5,325.00 | 6.00 | 6,390.00 |
| 0062 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 450 | LNFT | 2.10 | 945.00 | 1.60 | 720.00 | 2.00 | 900.00 | 2.25 | 1,012.50 |
| 0063 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 528 | LNFT | 5.25 | 2,772.00 | 5.25 | 2,772.00 | 5.00 | 2,640.00 | 6.00 | 3,168.00 |
| 0064 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 180 | LNFT | 6.15 | 1,107.00 | 5.75 | 1,035.00 | 6.00 | 1,080.00 | 6.00 | 1,080.00 |
| 0065 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 9.656 | MILE | 2,600.00 | 25,105.60 | 3,010.00 | 29,064.56 | 2,500.00 | 24,140.00 | 2,600.00 | 25,105.60 |
| 0066 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.58 | MILE | 800.00 | 2,864.00 | 1,000.00 | 3,580.00 | 750.00 | 2,685.00 | 800.00 | 2,864.00 |
| 0067 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 3 | EACH | 300.00 | 900.00 | 325.00 | 975.00 | 275.00 | 825.00 | 300.00 | 900.00 |
| 0068 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 42 | EACH | 180.00 | 7,560.00 | 250.00 | 10,500.00 | 175.00 | 7,350.00 | 200.00 | 8,400.00 |
| 0069 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 5 | EACH | 280.00 | 1,400.00 | 260.00 | 1,300.00 | 275.00 | 1,375.00 | 300.00 | 1,500.00 |
| 0070 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 460.00 | 920.00 | 460.00 | 920.00 | 450.00 | 900.00 | 500.00 | 1,000.00 |
| 0071 | 732-05-00100 | Removal of Existing Markings | 2.206 | MILE | 3,700.00 | 8,162.20 | 4,000.00 | 8,824.00 | 3,500.00 | 7,721.00 | 5,000.00 | 11,030.00 |
| 0072 | 735-01-00100 | Mailboxes | 27 | EACH | 1.00 | 27.00 | 7.00 | 189.00 | 5.00 | 135.00 | 1.00 | 27.00 |
| 0073 | 735-02-00100 | Mailbox Supports (Single) | 27 | EACH | 112.00 | 3,024.00 | 165.00 | 4,455.00 | 145.00 | 3,915.00 | 125.00 | 3,375.00 |
| 0074 | 736-09-00100 | Loop Detector | 480 | LNFT | 20.00 | 9,600.00 | 23.00 | 11,040.00 | 19.00 | 9,120.00 | 22.00 | 10,560.00 |
| 0075 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 65,000.00 | 65,000.00 | 30,000.00 | 30,000.00 |
| 0076 | 805-12-33000 | Reinforced Concrete Box Culverts (4' x 4') (Extension) | 26 | LNFT | 500.00 | 13,000.00 | 650.00 | 16,900.00 | 350.00 | 9,100.00 | 700.00 | 18,200.00 |
| 0077 | 805-12-34000 | Reinforced Concrete Box Culverts (5' x 5') (Extension) | 26 | LNFT | 700.00 | 18,200.00 | 750.00 | 19,500.00 | 400.00 | 10,400.00 | 850.00 | 22,100.00 |
| 0078 | NS-500-00300 | Traffic Maintenance Superpave Asphaltic Concrete | 240 | TON | 100.00 | 24,000.00 | 150.00 | 36,000.00 | 225.00 | 54,000.00 | 200.00 | 48,000.00 |
| 0079 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 23,790 | INLF | 0.01 | 237.90 | 0.75 | 17,842.50 | 1.00 | 23,790.00 | 0.25 | 5,947.50 |
| 0080 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 660 | INLF | 1.00 | 660.00 | 2.25 | 1,485.00 | 1.00 | 660.00 | 4.50 | 2,970.00 |
| 0081 | NS-700-00240 | Special Guard Rail Anchor Section | 3 | EACH | 1,300.00 | 3,900.00 | 1,200.00 | 3,600.00 | 1,100.00 | 3,300.00 | 1,200.00 | 3,600.00 |
| 0082 | NS-MSC-00120 | Drainage Structure MANHOLE TYPE MH-14X9 | 1 | EACH | 36,000.00 | 36,000.00 | 16,000.00 | 16,000.00 | 12,500.00 | 12,500.00 | 24,000.00 | 24,000.00 |
| CONTRACTOR TOTAL | 3,289,167.04 | 3,682,877.91 | 3,794,972.70 | 3,862,399.22 | ||||||||