LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.008182.6
Parish: Livingston
Routes: LA 1037
Description: FIRETOWER ROAD to 0.830 MILE SE LA 22
Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, IN-PLACE STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PAVEMENT PATCHING, AND RELATED WORK.
Estimated Construction Cost: $4,031,261.35


RankLicenseBidderConstruction Bid
1 12312 Gilchrist Construction Co. LLC $3,371,716.04
2 00481 Coastal Bridge Co., L.L.C. $3,759,712.55
3 06276 Barriere Construction Co., LLC. $4,225,538.75
4 12487 Diamond B Construction Co., L.L.C. $4,268,835.91
5 00849 F.G. Sullivan, Jr. Contractor LLC $4,996,630.13


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Gilchrist Construction Co. LLC
- 2 -
Coastal Bridge Co., L.L.C.
- 3 -
Barriere Construction Co., LLC.
- 4 -
Diamond B Construction Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 5,000.00 5,000.00 5,500.00 5,500.00 15,000.00 15,000.00 15,000.00 15,000.00
0002 202-02-04000 Removal of Bridge For Removal of Existing 20' x 24' Treated Timber Trestle Bridge at Sta. 301+01 1      EACH 8,000.00 8,000.00 5,500.00 5,500.00 15,000.00 15,000.00 6,000.00 6,000.00
0003 202-02-06100 Removal of Concrete Walks and Drives 35      SQYD 20.00 700.00 10.00 350.00 90.00 3,150.00 50.00 1,750.00
0004 202-02-14500 Removal of Guard Rail 1,214      LNFT 8.00 9,712.00 10.00 12,140.00 4.00 4,856.00 1.00 1,214.00
0005 202-02-32100 Removal of Pipe (Cross Drain) For Removal of Existing Cross Drains at Locations as shown in Summary of Drainage Structures Tables 420      LNFT 8.00 3,360.00 5.00 2,100.00 10.00 4,200.00 11.00 4,620.00
0006 202-02-32100 Removal of Pipe (Cross Drain) FOR REMOVAL OF EXISTING CROSS DRAINS AT LOCATIONS AS SHOWN IN SUMMARY OF DRAINAGE STRUCTURE TABLE 293      LNFT 8.00 2,344.00 5.00 1,465.00 10.00 2,930.00 11.00 3,223.00
0007 202-02-38300 Removal of Sign and U-Channel Post 116      EACH 15.00 1,740.00 20.00 2,320.00 1.00 116.00 1.00 116.00
0008 202-03-00010 Relocation For Relocation of 4-7'x5'x8' RC Boxes After Removal of Diversion Road at Sta. 301+01.28 4      EACH 2,500.00 10,000.00 2,000.00 8,000.00 30,000.00 120,000.00 350.00 1,400.00
0009 203-07-00100 Borrow (Vehicular Measurement) 1,500      CUYD 18.00 27,000.00 16.00 24,000.00 15.00 22,500.00 23.00 34,500.00
0010 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 2,858      CUYD 15.00 42,870.00 20.00 57,160.00 15.00 42,870.00 18.00 51,444.00
0011 204-02-00100 Temporary Hay or Straw Bales 302      EACH 15.00 4,530.00 12.50 3,775.00 9.00 2,718.00 14.00 4,228.00
0012 204-06-00100 Temporary Silt Fencing 2,438      LNFT 1.50 3,657.00 1.75 4,266.50 2.00 4,876.00 2.00 4,876.00
0013 304-05-00100 Lime Treatment (Type E) 708.55   TON 285.00 201,936.75 1.00 708.55 1.00 708.55 470.00 333,018.50
0014 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 102,828      SQYD 4.50 462,726.00 6.50 668,382.00 6.25 642,675.00 6.00 616,968.00
0015 308-02-00100 Removal of Existing Patches 2,150      SQYD 0.50 1,075.00 8.00 17,200.00 1.00 2,150.00 15.00 32,250.00
0016 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 534      CUYD 69.00 36,846.00 85.00 45,390.00 100.00 53,400.00 116.00 61,944.00
0017 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 37.5    CUYD 60.00 2,250.00 70.00 2,625.00 1.00 37.50 60.00 2,250.00
0018 502-01-00100 Superpave Asphaltic Concrete 20,783.9    TON 68.00 1,413,305.20 76.00 1,579,576.40 72.00 1,496,440.80 76.00 1,579,576.40
0019 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 3,241.1    TON 100.00 324,110.00 1.00 3,241.10 100.00 324,110.00 125.00 405,137.50
0020 509-01-00100 Cold Planing Asphaltic Pavement 96,893      SQYD 0.80 77,514.40 2.50 242,232.50 1.80 174,407.40 1.75 169,562.75
0021 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -3,116      CUYD 1.00 -3,116.00 15.00 -46,740.00 20.00 -62,320.00 0.10 -311.60
0022 510-01-00200 Pavement Patching (12" Minimum Thickness) For Patching Over Required R.C. Boxes at Sta. 301+01 115      SQYD 85.00 9,775.00 70.00 8,050.00 90.00 10,350.00 130.00 14,950.00
0023 510-01-00200 Pavement Patching (12" Minimum Thickness) 250      SQYD 90.00 22,500.00 75.00 18,750.00 90.00 22,500.00 130.00 32,500.00
0024 701-02-02000 Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) 128      LNFT 150.00 19,200.00 80.00 10,240.00 155.00 19,840.00 220.00 28,160.00
0025 701-02-02001 Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) 120      LNFT 160.00 19,200.00 80.00 9,600.00 155.00 18,600.00 220.00 26,400.00
0026 701-02-02040 Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) 264      LNFT 150.00 39,600.00 100.00 26,400.00 190.00 50,160.00 250.00 66,000.00
0027 701-02-02080 Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) 188      LNFT 160.00 30,080.00 145.00 27,260.00 210.00 39,480.00 300.00 56,400.00
0028 701-02-02120 Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) 40      LNFT 240.00 9,600.00 240.00 9,600.00 250.00 10,000.00 325.00 13,000.00
0029 701-08-00100 Relaying Pipe 16      LNFT 170.00 2,720.00 105.00 1,680.00 155.00 2,480.00 55.00 880.00
0030 701-15-00100 Concrete Collar 2      EACH 900.00 1,800.00 650.00 1,300.00 1,000.00 2,000.00 1,600.00 3,200.00
0031 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 100      LNFT 40.00 4,000.00 29.00 2,900.00 52.00 5,200.00 40.00 4,000.00
0032 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 114      LNFT 42.00 4,788.00 60.00 6,840.00 86.00 9,804.00 45.00 5,130.00
0033 704-03-00100 Blocked Out Guard Rail 287.5    LNFT 16.00 4,600.00 22.00 6,325.00 22.00 6,325.00 11.00 3,162.50
0034 704-07-00200 Guard Rail Bridge Attachments (Single Thrie Beam) 150      LNFT 25.00 3,750.00 39.00 5,850.00 42.00 6,300.00 25.00 3,750.00
0035 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 200      LNFT 48.00 9,600.00 60.00 12,000.00 65.00 13,000.00 50.00 10,000.00
0036 704-11-00100 Guard Rail End Treatment (Flared) 12      EACH 2,600.00 31,200.00 2,200.00 26,400.00 2,500.00 30,000.00 2,600.00 31,200.00
0037 711-01-03020 Riprap (30 lb, 18" Thick) For Erosion Control Left of Centerline at Cross Drain Located at Sta. 28+31 3      SQYD 200.00 600.00 80.00 240.00 125.00 375.00 115.00 345.00
0038 711-04-00100 Geotextile Fabric For Erosion Control Left of Centerline at Cross Drain Located at Sta. 28+31 3      SQYD 25.00 75.00 2.25 6.75 4.00 12.00 2.50 7.50
0039 713-01-00100 Temporary Signs and Barricades 1      LUMP 48,000.00 48,000.00 125,000.00 125,000.00 240,000.00 240,000.00 25,000.00 25,000.00
0040 713-02-00300 Temporary Pavement Markings (8" Width) 513      LNFT 0.50 256.50 0.25 128.25 0.50 256.50 0.55 282.15
0041 713-02-00500 Temporary Pavement Markings (24" Width) 225      LNFT 0.50 112.50 0.80 180.00 85.00 19,125.00 0.55 123.75
0042 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 23.806  MILE 350.00 8,332.10 175.00 4,166.05 200.00 4,761.20 160.00 3,808.96
0043 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 16.215  MILE 95.00 1,540.43 1.00 16.22 100.00 1,621.50 200.00 3,243.00
0044 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 93.575  MILE 95.00 8,889.63 1.00 93.58 100.00 9,357.50 300.00 28,072.50
0045 713-05-00500 Temporary Pavement Legends & Symbols (SCHOOL CROSSING) 4      EACH 100.00 400.00 105.00 420.00 110.00 440.00 90.00 360.00
0046 720-01-01000 Erosion Control System (Slope Protection) (Type A) 2,190      SQYD 1.60 3,504.00 1.40 3,066.00 1.50 3,285.00 2.25 4,927.50
0047 725-03-00100 Low Profile Runaround 1      EACH 30,000.00 30,000.00 50,000.00 50,000.00 25,000.00 25,000.00 65,000.00 65,000.00
0048 726-01-00100 Bedding Material 316.7    CUYD 70.00 22,169.00 85.00 26,919.50 90.00 28,503.00 110.00 34,837.00
0049 727-01-00100 Mobilization 1      LUMP 150,000.00 150,000.00 350,000.00 350,000.00 400,000.00 400,000.00 182,600.00 182,600.00
0050 729-16-00200 Object Marker Assembly (Type 2) 84      EACH 45.00 3,780.00 70.00 5,880.00 72.00 6,048.00 50.00 4,200.00
0051 729-16-00300 Object Marker Assembly (Type 3) 16      EACH 65.00 1,040.00 75.00 1,200.00 90.00 1,440.00 70.00 1,120.00
0052 731-02-00100 Reflectorized Raised Pavement Markers 2,858      EACH 5.25 15,004.50 5.75 16,433.50 6.00 17,148.00 5.00 14,290.00
0053 732-01-02040 Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) 171      LNFT 2.20 376.20 1.60 273.60 1.60 273.60 2.25 384.75
0054 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 75      LNFT 10.00 750.00 5.50 412.50 6.00 450.00 9.25 693.75
0055 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 31.872  MILE 2,600.00 82,867.20 2,900.00 92,428.80 3,000.00 95,616.00 3,000.00 95,616.00
0056 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 5.405  MILE 775.00 4,188.88 900.00 4,864.50 1,000.00 5,405.00 800.00 4,324.00
0057 732-04-19000 Plastic Pavement Legends and Symbols (SCHOOL CROSSING) 2      EACH 660.00 1,320.00 425.00 850.00 450.00 900.00 700.00 1,400.00
0058 735-01-00100 Mailboxes 150      EACH 5.00 750.00 1.10 165.00 7.00 1,050.00 1.00 150.00
0059 735-02-00100 Mailbox Supports (Single) 144      EACH 110.00 15,840.00 106.00 15,264.00 150.00 21,600.00 110.00 15,840.00
0060 735-04-00100 Mailbox Supports (Multiple) 2      EACH 275.00 550.00 265.00 530.00 340.00 680.00 275.00 550.00
0061 739-01-00100 Hydro-Seeding 0.85   ACRE 1,500.00 1,275.00 1,500.00 1,275.00 1,500.00 1,275.00 1,700.00 1,445.00
0062 740-01-00100 Construction Layout 1      LUMP 10,000.00 10,000.00 148,000.00 148,000.00 100,000.00 100,000.00 33,000.00 33,000.00
0063 805-01-00300 Class A Concrete (Box Culvert Headwalls) 18.25   CUYD 1,300.00 23,725.00 1,000.00 18,250.00 1,500.00 27,375.00 1,300.00 23,725.00
0064 805-12-21040 Reinforced Concrete Box Culverts (7' x 5') (Precast) 96      LNFT 700.00 67,200.00 600.00 57,600.00 750.00 72,000.00 700.00 67,200.00
0065 806-01-00100 Deformed Reinforcing Steel 1,340      LB 2.90 3,886.00 2.25 3,015.00 2.00 2,680.00 1.10 1,474.00
0066 NS-200-00020 Cleaning Existing Ditches 3,200      LNFT 3.50 11,200.00 5.00 16,000.00 4.25 13,600.00 6.00 19,200.00
0067 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 756      INLF 2.00 1,512.00 1.00 756.00 1.20 907.20 3.25 2,457.00
0068 NS-724-00001 Rumble Strips (Centerline Ground-In) 7.075  MILE 650.00 4,598.75 550.00 3,891.25 1,200.00 8,490.00 800.00 5,660.00
                         
    CONTRACTOR TOTAL       3,371,716.04   3,759,712.55   4,225,538.75   4,268,835.91



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
F.G. Sullivan, Jr. Contractor LLC
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 4,000.00 4,000.00
0002 202-02-04000 Removal of Bridge For Removal of Existing 20' x 24' Treated Timber Trestle Bridge at Sta. 301+01 1      EACH 8,000.00 8,000.00
0003 202-02-06100 Removal of Concrete Walks and Drives 35      SQYD 15.00 525.00
0004 202-02-14500 Removal of Guard Rail 1,214      LNFT 5.00 6,070.00
0005 202-02-32100 Removal of Pipe (Cross Drain) For Removal of Existing Cross Drains at Locations as shown in Summary of Drainage Structures Tables 420      LNFT 5.00 2,100.00
0006 202-02-32100 Removal of Pipe (Cross Drain) FOR REMOVAL OF EXISTING CROSS DRAINS AT LOCATIONS AS SHOWN IN SUMMARY OF DRAINAGE STRUCTURE TABLE 293      LNFT 5.00 1,465.00
0007 202-02-38300 Removal of Sign and U-Channel Post 116      EACH 5.00 580.00
0008 202-03-00010 Relocation For Relocation of 4-7'x5'x8' RC Boxes After Removal of Diversion Road at Sta. 301+01.28 4      EACH 3,000.00 12,000.00
0009 203-07-00100 Borrow (Vehicular Measurement) 1,500      CUYD 10.00 15,000.00
0010 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 2,858      CUYD 10.00 28,580.00
0011 204-02-00100 Temporary Hay or Straw Bales 302      EACH 12.00 3,624.00
0012 204-06-00100 Temporary Silt Fencing 2,438      LNFT 2.00 4,876.00
0013 304-05-00100 Lime Treatment (Type E) 708.55   TON 1.00 708.55
0014 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 102,828      SQYD 6.00 616,968.00
0015 308-02-00100 Removal of Existing Patches 2,150      SQYD 3.00 6,450.00
0016 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 534      CUYD 40.00 21,360.00
0017 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 37.5    CUYD 200.00 7,500.00
0018 502-01-00100 Superpave Asphaltic Concrete 20,783.9    TON 120.00 2,494,068.00
0019 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 3,241.1    TON 120.00 388,932.00
0020 509-01-00100 Cold Planing Asphaltic Pavement 96,893      SQYD 3.70 358,504.10
0021 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -3,116      CUYD 0.00 0.00
0022 510-01-00200 Pavement Patching (12" Minimum Thickness) For Patching Over Required R.C. Boxes at Sta. 301+01 115      SQYD 135.00 15,525.00
0023 510-01-00200 Pavement Patching (12" Minimum Thickness) 250      SQYD 135.00 33,750.00
0024 701-02-02000 Cross Drain Pipe Arch (24" Equiv. RCPA or 30" Equiv. CMPA) 128      LNFT 140.00 17,920.00
0025 701-02-02001 Cross Drain Pipe Arch (24" Equiv. RCPA or 24" Equiv. CMPA) 120      LNFT 140.00 16,800.00
0026 701-02-02040 Cross Drain Pipe Arch (30" Equiv. RCPA or 36" Equiv. CMPA) 264      LNFT 160.00 42,240.00
0027 701-02-02080 Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) 188      LNFT 200.00 37,600.00
0028 701-02-02120 Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) 40      LNFT 220.00 8,800.00
0029 701-08-00100 Relaying Pipe 16      LNFT 120.00 1,920.00
0030 701-15-00100 Concrete Collar 2      EACH 800.00 1,600.00
0031 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 100      LNFT 35.00 3,500.00
0032 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 114      LNFT 40.00 4,560.00
0033 704-03-00100 Blocked Out Guard Rail 287.5    LNFT 15.00 4,312.50
0034 704-07-00200 Guard Rail Bridge Attachments (Single Thrie Beam) 150      LNFT 25.00 3,750.00
0035 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 200      LNFT 45.00 9,000.00
0036 704-11-00100 Guard Rail End Treatment (Flared) 12      EACH 2,500.00 30,000.00
0037 711-01-03020 Riprap (30 lb, 18" Thick) For Erosion Control Left of Centerline at Cross Drain Located at Sta. 28+31 3      SQYD 250.00 750.00
0038 711-04-00100 Geotextile Fabric For Erosion Control Left of Centerline at Cross Drain Located at Sta. 28+31 3      SQYD 2.00 6.00
0039 713-01-00100 Temporary Signs and Barricades 1      LUMP 151,400.00 151,400.00
0040 713-02-00300 Temporary Pavement Markings (8" Width) 513      LNFT 0.10 51.30
0041 713-02-00500 Temporary Pavement Markings (24" Width) 225      LNFT 0.40 90.00
0042 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 23.806  MILE 400.00 9,522.40
0043 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 16.215  MILE 500.00 8,107.50
0044 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 93.575  MILE 175.00 16,375.63
0045 713-05-00500 Temporary Pavement Legends & Symbols (SCHOOL CROSSING) 4      EACH 50.00 200.00
0046 720-01-01000 Erosion Control System (Slope Protection) (Type A) 2,190      SQYD 1.30 2,847.00
0047 725-03-00100 Low Profile Runaround 1      EACH 96,000.00 96,000.00
0048 726-01-00100 Bedding Material 316.7    CUYD 95.00 30,086.50
0049 727-01-00100 Mobilization 1      LUMP 150,000.00 150,000.00
0050 729-16-00200 Object Marker Assembly (Type 2) 84      EACH 45.00 3,780.00
0051 729-16-00300 Object Marker Assembly (Type 3) 16      EACH 60.00 960.00
0052 731-02-00100 Reflectorized Raised Pavement Markers 2,858      EACH 5.25 15,004.50
0053 732-01-02040 Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) 171      LNFT 1.50 256.50
0054 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 75      LNFT 5.00 375.00
0055 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 31.872  MILE 2,700.00 86,054.40
0056 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 5.405  MILE 850.00 4,594.25
0057 732-04-19000 Plastic Pavement Legends and Symbols (SCHOOL CROSSING) 2      EACH 400.00 800.00
0058 735-01-00100 Mailboxes 150      EACH 1.00 150.00
0059 735-02-00100 Mailbox Supports (Single) 144      EACH 100.00 14,400.00
0060 735-04-00100 Mailbox Supports (Multiple) 2      EACH 250.00 500.00
0061 739-01-00100 Hydro-Seeding 0.85   ACRE 1,400.00 1,190.00
0062 740-01-00100 Construction Layout 1      LUMP 75,000.00 75,000.00
0063 805-01-00300 Class A Concrete (Box Culvert Headwalls) 18.25   CUYD 1,500.00 27,375.00
0064 805-12-21040 Reinforced Concrete Box Culverts (7' x 5') (Precast) 96      LNFT 650.00 62,400.00
0065 806-01-00100 Deformed Reinforcing Steel 1,340      LB 2.50 3,350.00
0066 NS-200-00020 Cleaning Existing Ditches 3,200      LNFT 5.00 16,000.00
0067 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 756      INLF 1.00 756.00
0068 NS-724-00001 Rumble Strips (Centerline Ground-In) 7.075  MILE 800.00 5,660.00
             
    CONTRACTOR TOTAL       4,996,630.13