Bid Tabulations
Letting of
03/27/2013
LA DOTD Headquarters
| Lead Project: H.008154.6 | |
| Parish: Lincoln | |
| Routes: LA 822 | |
| Description: LA 822: LA 146 - US 167 | |
| Type Const: CLEARING AND GRUBBING, COLD PLANING ASPHALTIC CONCRETE, CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE, AND RELATED WORK. | |
| Estimated Construction Cost: $2,761,813.26 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $1,995,159.19 |
| 2 | 08584 | Madden Contracting Co., Inc. | $2,311,927.79 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $2,350,620.94 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $2,488,627.17 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Madden Contracting Co., Inc. |
- 3 - Diamond B Construction Co., L.L.C. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) Approx 4.272 Acres | 1 | LUMP | 9,000.00 | 9,000.00 | 9,600.00 | 9,600.00 | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge Structure No. 8310302101 | 1 | EACH | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 91 | SQYD | 12.00 | 1,092.00 | 12.00 | 1,092.00 | 15.00 | 1,365.00 | 18.00 | 1,638.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 234 | LNFT | 5.00 | 1,170.00 | 5.00 | 1,170.00 | 6.00 | 1,404.00 | 9.00 | 2,106.00 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 30" RCP | 16 | LNFT | 20.00 | 320.00 | 20.00 | 320.00 | 30.00 | 480.00 | 50.00 | 800.00 |
| 0006 | 202-02-32100 | Removal of Pipe (Cross Drain) 24" RCP | 4 | LNFT | 20.00 | 80.00 | 20.00 | 80.00 | 30.00 | 120.00 | 50.00 | 200.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 6,000.00 | 6,000.00 | 5,500.00 | 5,500.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,402 | CUYD | 15.00 | 81,030.00 | 14.00 | 75,628.00 | 30.00 | 162,060.00 | 22.00 | 118,844.00 |
| 0009 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,666 | CUYD | 14.00 | 23,324.00 | 14.00 | 23,324.00 | 30.00 | 49,980.00 | 22.00 | 36,652.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 120 | LNFT | 2.00 | 240.00 | 2.00 | 240.00 | 5.00 | 600.00 | 2.00 | 240.00 |
| 0011 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 59,782 | SQYD | 7.00 | 418,474.00 | 7.60 | 454,343.20 | 7.25 | 433,419.50 | 7.25 | 433,419.50 |
| 0012 | 308-02-00100 | Removal of Existing Patches | 1,200 | SQYD | 10.00 | 12,000.00 | 10.00 | 12,000.00 | 5.00 | 6,000.00 | 7.00 | 8,400.00 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 81 | CUYD | 50.00 | 4,050.00 | 45.00 | 3,645.00 | 80.00 | 6,480.00 | 50.00 | 4,050.00 |
| 0014 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 25.00 | 5,000.00 | 60.00 | 12,000.00 | 80.00 | 16,000.00 | 35.00 | 7,000.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 11,216.1 | TON | 90.00 | 1,009,449.00 | 95.00 | 1,065,529.50 | 89.00 | 998,232.90 | 90.00 | 1,009,449.00 |
| 0016 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 904.1 | TON | 124.00 | 112,108.40 | 60.00 | 54,246.00 | 200.00 | 180,820.00 | 165.00 | 149,176.50 |
| 0017 | 509-01-00100 | Cold Planing Asphaltic Pavement | 46,786 | SQYD | 0.80 | 37,428.80 | 1.00 | 46,786.00 | 2.00 | 93,572.00 | 1.15 | 53,803.90 |
| 0018 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,950 | CUYD | 0.10 | -195.00 | 0.01 | -19.50 | 5.00 | -9,750.00 | 1.00 | -1,950.00 |
| 0019 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 48 | LNFT | 450.00 | 21,600.00 | 450.00 | 21,600.00 | 580.00 | 27,840.00 | 750.00 | 36,000.00 |
| 0020 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 65.00 | 520.00 | 60.00 | 480.00 | 80.00 | 640.00 | 275.00 | 2,200.00 |
| 0021 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 8 | LNFT | 85.00 | 680.00 | 80.00 | 640.00 | 100.00 | 800.00 | 285.00 | 2,280.00 |
| 0022 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 32 | LNFT | 105.00 | 3,360.00 | 100.00 | 3,200.00 | 130.00 | 4,160.00 | 295.00 | 9,440.00 |
| 0023 | 701-12-01060 | Corrugated Metal Pipe (Extension) (24") | 16 | LNFT | 115.00 | 1,840.00 | 110.00 | 1,760.00 | 140.00 | 2,240.00 | 320.00 | 5,120.00 |
| 0024 | 701-12-01180 | Corrugated Metal Pipe (Extension) (60") | 8 | LNFT | 210.00 | 1,680.00 | 200.00 | 1,600.00 | 250.00 | 2,000.00 | 500.00 | 4,000.00 |
| 0025 | 701-12-01200 | Corrugated Metal Pipe (Extension) (72") | 8 | LNFT | 260.00 | 2,080.00 | 250.00 | 2,000.00 | 325.00 | 2,600.00 | 600.00 | 4,800.00 |
| 0026 | 701-15-00100 | Concrete Collar | 6 | EACH | 800.00 | 4,800.00 | 800.00 | 4,800.00 | 1,000.00 | 6,000.00 | 1,000.00 | 6,000.00 |
| 0027 | 706-02-00200 | Concrete Drive (6" Thick) | 91.1 | SQYD | 65.00 | 5,921.50 | 60.00 | 5,466.00 | 75.00 | 6,832.50 | 100.00 | 9,110.00 |
| 0028 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,000.00 | 12,000.00 | 170,000.00 | 170,000.00 | 30,000.00 | 30,000.00 | 100,000.00 | 100,000.00 |
| 0029 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 13.446 | MILE | 225.00 | 3,025.35 | 300.00 | 4,033.80 | 190.00 | 2,554.74 | 325.00 | 4,369.95 |
| 0030 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.948 | MILE | 200.00 | 189.60 | 1.00 | 0.95 | 110.00 | 104.28 | 115.00 | 109.02 |
| 0031 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 52.836 | MILE | 1.00 | 52.84 | 1.00 | 52.84 | 220.00 | 11,623.92 | 150.00 | 7,925.40 |
| 0032 | 716-01-00100 | Mulch (Vegetative) | 17.2 | TON | 425.00 | 7,310.00 | 600.00 | 10,320.00 | 540.00 | 9,288.00 | 585.00 | 10,062.00 |
| 0033 | 717-01-00100 | Seeding | 515 | LB | 8.00 | 4,120.00 | 15.00 | 7,725.00 | 9.00 | 4,635.00 | 9.00 | 4,635.00 |
| 0034 | 718-01-00100 | Fertilizer | 8,590 | LB | 0.50 | 4,295.00 | 0.50 | 4,295.00 | 0.65 | 5,583.50 | 0.55 | 4,724.50 |
| 0035 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 60 | SQYD | 2.00 | 120.00 | 2.00 | 120.00 | 5.00 | 300.00 | 10.00 | 600.00 |
| 0036 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 |
| 0037 | 726-01-00100 | Bedding Material | 139.6 | CUYD | 100.00 | 13,960.00 | 100.00 | 13,960.00 | 125.00 | 17,450.00 | 100.00 | 13,960.00 |
| 0038 | 727-01-00100 | Mobilization | 1 | LUMP | 47,000.00 | 47,000.00 | 170,000.00 | 170,000.00 | 60,000.00 | 60,000.00 | 240,000.00 | 240,000.00 |
| 0039 | 729-16-00200 | Object Marker Assembly (Type 2) | 34 | EACH | 65.00 | 2,210.00 | 65.00 | 2,210.00 | 90.00 | 3,060.00 | 88.00 | 2,992.00 |
| 0040 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,142 | EACH | 4.25 | 4,853.50 | 4.00 | 4,568.00 | 5.00 | 5,710.00 | 4.60 | 5,253.20 |
| 0041 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 17.612 | MILE | 2,400.00 | 42,268.80 | 2,200.00 | 38,746.40 | 2,300.00 | 40,507.60 | 2,400.00 | 42,268.80 |
| 0042 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.316 | MILE | 600.00 | 189.60 | 600.00 | 189.60 | 750.00 | 237.00 | 800.00 | 252.80 |
| 0043 | 735-01-00100 | Mailboxes | 54 | EACH | 5.00 | 270.00 | 1.00 | 54.00 | 1.00 | 54.00 | 14.00 | 756.00 |
| 0044 | 735-02-00100 | Mailbox Supports (Single) | 58 | EACH | 115.00 | 6,670.00 | 108.00 | 6,264.00 | 130.00 | 7,540.00 | 115.00 | 6,670.00 |
| 0045 | 735-03-00100 | Mailbox Supports (Double) | 3 | EACH | 200.00 | 600.00 | 151.00 | 453.00 | 175.00 | 525.00 | 150.00 | 450.00 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,500.00 | 25,500.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 |
| 0047 | 805-01-00200 | Class A Concrete (Pipe Headwalls) | 40.18 | CUYD | 1,010.00 | 40,581.80 | 1,000.00 | 40,180.00 | 1,200.00 | 48,216.00 | 1,500.00 | 60,270.00 |
| 0048 | 806-01-00100 | Deformed Reinforcing Steel | 2,892 | LB | 2.50 | 7,230.00 | 2.50 | 7,230.00 | 3.00 | 8,676.00 | 1.30 | 3,759.60 |
| 0049 | NS-200-00020 | Cleaning Existing Ditches | 250 | LNFT | 10.00 | 2,500.00 | 10.00 | 2,500.00 | 10.00 | 2,500.00 | 10.00 | 2,500.00 |
| 0050 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 330 | INLF | 2.00 | 660.00 | 1.50 | 495.00 | 2.00 | 660.00 | 13.00 | 4,290.00 |
| CONTRACTOR TOTAL | 1,995,159.19 | 2,311,927.79 | 2,350,620.94 | 2,488,627.17 | ||||||||