LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.007954.6
Parish: Desoto
Routes: LA 3248
Description: LA 3248 Creek Bridges
Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost: $960,432.00


RankLicenseBidderConstruction Bid
1 28218 F. J. Burnell, Inc. $798,666.72
2 49239 W L Bass Construction Inc. $798,987.23
3 48925 David V. Temple $814,164.80
4 30774 Progressive Construction Co., LLC $890,674.58
5 01012 Cecil D. Gassiott, LLC $950,096.91
6 09090 Guinn Brothers, LLC. $985,619.91
7 18546 C W & W Contractors, Inc. $1,012,104.97
8 12135 Blount Bros. Construction, Inc. $1,078,829.44
9 44289 Jeff Mercer LLC $1,199,881.91


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
F. J. Burnell, Inc.
- 2 -
W L Bass Construction Inc.
- 3 -
David V. Temple
- 4 -
Progressive Construction Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 12,000.00 12,000.00 10,000.00 10,000.00 12,778.10 12,778.10 15,000.00 15,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 5,000.00 5,000.00 250.00 250.00 5,000.00 5,000.00 2,000.00 2,000.00
0003 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160702591 STA 209+84.00 TREATED TIMBER TRESTLE 39' X 22' 1      EACH 7,500.00 7,500.00 5,000.00 5,000.00 5,000.00 5,000.00 15,000.00 15,000.00
0004 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160701721 STA 114+48.00 PRECAST CONCRETE SLAB UNITS 38' X 24' 1      EACH 7,500.00 7,500.00 6,000.00 6,000.00 5,000.00 5,000.00 15,000.00 15,000.00
0005 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160703051 STA 310+00.00 TREATED TIMBER TRESTLE 38' x 22' 1      EACH 7,500.00 7,500.00 5,000.00 5,000.00 5,000.00 5,000.00 15,000.00 15,000.00
0006 202-02-14500 Removal of Guard Rail 1,260      LNFT 3.00 3,780.00 2.00 2,520.00 1.00 1,260.00 5.00 6,300.00
0007 202-02-38500 Removal of Surfacing and Stablized Base 1,128.4    SQYD 6.00 6,770.40 5.00 5,642.00 5.22 5,890.25 10.00 11,284.00
0008 203-01-00100 General Excavation 529      CUYD 10.00 5,290.00 7.00 3,703.00 10.00 5,290.00 10.00 5,290.00
0009 203-03-00100 Embankment 1,167      CUYD 12.00 14,004.00 15.00 17,505.00 20.00 23,340.00 20.00 23,340.00
0010 204-05-00100 Temporary Sediment Check Dams (Hay) 11      EACH 80.00 880.00 0.00 0.00 200.00 2,200.00 250.00 2,750.00
0011 204-06-00100 Temporary Silt Fencing 1,734      LNFT 3.00 5,202.00 0.00 0.00 4.50 7,803.00 3.00 5,202.00
0012 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 1,418.6    SQYD 17.00 24,116.20 25.00 35,465.00 18.50 26,244.10 27.00 38,302.20
0013 304-05-00100 Lime Treatment (Type E) 20.11   TON 1.00 20.11 0.00 0.00 298.35 5,999.82 1,000.00 20,110.00
0014 401-01-00100 Aggregate Surface Course (Net Section) 76.9    CUYD 90.00 6,921.00 90.00 6,921.00 56.40 4,337.16 100.00 7,690.00
0015 502-01-00100 Superpave Asphaltic Concrete 403.2    TON 150.00 60,480.00 135.00 54,432.00 207.00 83,462.40 200.00 80,640.00
0016 711-02-00400 Riprap (55 lb) 780      CUYD 65.00 50,700.00 105.00 81,900.00 87.75 68,445.00 50.00 39,000.00
0017 713-01-00100 Temporary Signs and Barricades 1      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 17,000.00 17,000.00
0018 716-01-00100 Mulch (Vegetative) 1.2    TON 1,000.00 1,200.00 2,000.00 2,400.00 3,000.00 3,600.00 3,300.00 3,960.00
0019 717-01-00100 Seeding 15      LB 20.00 300.00 10.00 150.00 100.00 1,500.00 110.00 1,650.00
0020 718-01-00100 Fertilizer 600      LB 1.00 600.00 1.00 600.00 3.00 1,800.00 3.30 1,980.00
0021 726-01-00100 Bedding Material 205.3    CUYD 80.00 16,424.00 1.00 205.30 72.00 14,781.60 90.00 18,477.00
0022 727-01-00100 Mobilization 1      LUMP 67,000.00 67,000.00 60,000.00 60,000.00 80,000.00 80,000.00 42,000.00 42,000.00
0023 731-02-00100 Reflectorized Raised Pavement Markers 19      EACH 50.00 950.00 20.00 380.00 100.00 1,900.00 110.00 2,090.00
0024 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.236  MILE 6,000.00 1,416.00 8,000.00 1,888.00 10,000.00 2,360.00 11,000.00 2,596.00
0025 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.118  MILE 6,000.00 708.00 4,000.00 472.00 4,000.00 472.00 4,400.00 519.20
0026 740-01-00100 Construction Layout 1      LUMP 7,500.00 7,500.00 2,500.00 2,500.00 5,000.00 5,000.00 7,000.00 7,000.00
0027 805-01-00300 Class A Concrete (Box Culvert Headwalls) 109.05   CUYD 1,000.00 109,050.00 1,265.00 137,948.25 1,050.00 114,502.50 1,500.00 163,575.00
0028 805-12-02040 Reinforced Concrete Box Culverts (7' x 5') 192      LNFT 530.00 101,760.00 500.00 96,000.00 480.00 92,160.00 440.00 84,480.00
0029 805-12-05000 Reinforced Concrete Box Culverts (8' x 8') 384      LNFT 650.00 249,600.00 650.00 249,600.00 545.00 209,280.00 590.00 226,560.00
0030 806-01-00100 Deformed Reinforcing Steel 7,911.88   LB 1.00 7,911.88 0.25 1,977.97 1.00 7,911.88 2.00 15,823.76
0031 711-04-00100 Geotextile Fabric 527.71   SQYD 3.00 1,583.13 1.00 527.71 3.50 1,846.99 2.00 1,055.42
                         
    CONTRACTOR TOTAL       798,666.72   798,987.23   814,164.80   890,674.58



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Cecil D. Gassiott, LLC
- 6 -
Guinn Brothers, LLC.
- 7 -
C W & W Contractors, Inc.
- 8 -
Blount Bros. Construction, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 10,000.00 10,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 3,000.00 3,000.00 10,000.00 10,000.00
0003 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160702591 STA 209+84.00 TREATED TIMBER TRESTLE 39' X 22' 1      EACH 10,000.00 10,000.00 15,000.00 15,000.00 2,500.00 2,500.00 30,000.00 30,000.00
0004 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160701721 STA 114+48.00 PRECAST CONCRETE SLAB UNITS 38' X 24' 1      EACH 12,000.00 12,000.00 12,500.00 12,500.00 3,500.00 3,500.00 25,000.00 25,000.00
0005 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160703051 STA 310+00.00 TREATED TIMBER TRESTLE 38' x 22' 1      EACH 9,000.00 9,000.00 8,000.00 8,000.00 2,500.00 2,500.00 25,000.00 25,000.00
0006 202-02-14500 Removal of Guard Rail 1,260      LNFT 15.00 18,900.00 2.00 2,520.00 2.00 2,520.00 7.00 8,820.00
0007 202-02-38500 Removal of Surfacing and Stablized Base 1,128.4    SQYD 5.00 5,642.00 6.00 6,770.40 5.00 5,642.00 5.00 5,642.00
0008 203-01-00100 General Excavation 529      CUYD 8.00 4,232.00 10.00 5,290.00 12.00 6,348.00 5.00 2,645.00
0009 203-03-00100 Embankment 1,167      CUYD 25.00 29,175.00 25.00 29,175.00 15.00 17,505.00 20.00 23,340.00
0010 204-05-00100 Temporary Sediment Check Dams (Hay) 11      EACH 200.00 2,200.00 100.00 1,100.00 50.00 550.00 200.00 2,200.00
0011 204-06-00100 Temporary Silt Fencing 1,734      LNFT 4.00 6,936.00 3.00 5,202.00 3.00 5,202.00 3.00 5,202.00
0012 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 1,418.6    SQYD 30.00 42,558.00 22.00 31,209.20 45.00 63,837.00 25.00 35,465.00
0013 304-05-00100 Lime Treatment (Type E) 20.11   TON 290.00 5,831.90 500.00 10,055.00 200.00 4,022.00 305.00 6,133.55
0014 401-01-00100 Aggregate Surface Course (Net Section) 76.9    CUYD 100.00 7,690.00 100.00 7,690.00 65.00 4,998.50 100.00 7,690.00
0015 502-01-00100 Superpave Asphaltic Concrete 403.2    TON 215.00 86,688.00 220.00 88,704.00 215.00 86,688.00 150.00 60,480.00
0016 711-02-00400 Riprap (55 lb) 780      CUYD 115.00 89,700.00 80.00 62,400.00 65.00 50,700.00 80.00 62,400.00
0017 713-01-00100 Temporary Signs and Barricades 1      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 18,000.00 18,000.00 20,000.00 20,000.00
0018 716-01-00100 Mulch (Vegetative) 1.2    TON 3,000.00 3,600.00 2,000.00 2,400.00 2,500.00 3,000.00 600.00 720.00
0019 717-01-00100 Seeding 15      LB 16.00 240.00 25.00 375.00 25.00 375.00 20.00 300.00
0020 718-01-00100 Fertilizer 600      LB 3.00 1,800.00 1.00 600.00 2.00 1,200.00 1.00 600.00
0021 726-01-00100 Bedding Material 205.3    CUYD 70.00 14,371.00 100.00 20,530.00 130.00 26,689.00 80.00 16,424.00
0022 727-01-00100 Mobilization 1      LUMP 50,000.00 50,000.00 100,000.00 100,000.00 80,000.00 80,000.00 50,000.00 50,000.00
0023 731-02-00100 Reflectorized Raised Pavement Markers 19      EACH 100.00 1,900.00 30.00 570.00 20.00 380.00 10.00 190.00
0024 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.236  MILE 11,000.00 2,596.00 10,000.00 2,360.00 6,000.00 1,416.00 3,500.00 826.00
0025 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.118  MILE 4,000.00 472.00 6,000.00 708.00 12,000.00 1,416.00 2,500.00 295.00
0026 740-01-00100 Construction Layout 1      LUMP 6,000.00 6,000.00 10,000.00 10,000.00 15,000.00 15,000.00 15,000.00 15,000.00
0027 805-01-00300 Class A Concrete (Box Culvert Headwalls) 109.05   CUYD 1,400.00 152,670.00 1,500.00 163,575.00 1,300.00 141,765.00 1,000.00 109,050.00
0028 805-12-02040 Reinforced Concrete Box Culverts (7' x 5') 192      LNFT 500.00 96,000.00 485.00 93,120.00 550.00 105,600.00 750.00 144,000.00
0029 805-12-05000 Reinforced Concrete Box Culverts (8' x 8') 384      LNFT 600.00 230,400.00 631.00 242,304.00 850.00 326,400.00 1,000.00 384,000.00
0030 806-01-00100 Deformed Reinforcing Steel 7,911.88   LB 1.00 7,911.88 2.00 15,823.76 2.00 15,823.76 2.00 15,823.76
0031 711-04-00100 Geotextile Fabric 527.71   SQYD 3.00 1,583.13 5.00 2,638.55 1.00 527.71 3.00 1,583.13
                         
    CONTRACTOR TOTAL       950,096.91   985,619.91   1,012,104.97   1,078,829.44



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 9 -
Jeff Mercer LLC
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 30,000.00 30,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 30,000.00 30,000.00
0003 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160702591 STA 209+84.00 TREATED TIMBER TRESTLE 39' X 22' 1      EACH 25,000.00 25,000.00
0004 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160701721 STA 114+48.00 PRECAST CONCRETE SLAB UNITS 38' X 24' 1      EACH 15,000.00 15,000.00
0005 202-02-04000 Removal of Bridge STRUCTURE NO. 04168160703051 STA 310+00.00 TREATED TIMBER TRESTLE 38' x 22' 1      EACH 15,000.00 15,000.00
0006 202-02-14500 Removal of Guard Rail 1,260      LNFT 5.00 6,300.00
0007 202-02-38500 Removal of Surfacing and Stablized Base 1,128.4    SQYD 4.00 4,513.60
0008 203-01-00100 General Excavation 529      CUYD 10.00 5,290.00
0009 203-03-00100 Embankment 1,167      CUYD 25.00 29,175.00
0010 204-05-00100 Temporary Sediment Check Dams (Hay) 11      EACH 150.00 1,650.00
0011 204-06-00100 Temporary Silt Fencing 1,734      LNFT 1.00 1,734.00
0012 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 1,418.6    SQYD 50.00 70,930.00
0013 304-05-00100 Lime Treatment (Type E) 20.11   TON 100.00 2,011.00
0014 401-01-00100 Aggregate Surface Course (Net Section) 76.9    CUYD 45.00 3,460.50
0015 502-01-00100 Superpave Asphaltic Concrete 403.2    TON 225.00 90,720.00
0016 711-02-00400 Riprap (55 lb) 780      CUYD 75.00 58,500.00
0017 713-01-00100 Temporary Signs and Barricades 1      LUMP 50,000.00 50,000.00
0018 716-01-00100 Mulch (Vegetative) 1.2    TON 1,050.00 1,260.00
0019 717-01-00100 Seeding 15      LB 5.00 75.00
0020 718-01-00100 Fertilizer 600      LB 5.00 3,000.00
0021 726-01-00100 Bedding Material 205.3    CUYD 125.00 25,662.50
0022 727-01-00100 Mobilization 1      LUMP 150,000.00 150,000.00
0023 731-02-00100 Reflectorized Raised Pavement Markers 19      EACH 5.50 104.50
0024 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.236  MILE 1,500.00 354.00
0025 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.118  MILE 1,500.00 177.00
0026 740-01-00100 Construction Layout 1      LUMP 15,000.00 15,000.00
0027 805-01-00300 Class A Concrete (Box Culvert Headwalls) 109.05   CUYD 1,050.00 114,502.50
0028 805-12-02040 Reinforced Concrete Box Culverts (7' x 5') 192      LNFT 650.00 124,800.00
0029 805-12-05000 Reinforced Concrete Box Culverts (8' x 8') 384      LNFT 800.00 307,200.00
0030 806-01-00100 Deformed Reinforcing Steel 7,911.88   LB 2.00 15,823.76
0031 711-04-00100 Geotextile Fabric 527.71   SQYD 5.00 2,638.55
             
    CONTRACTOR TOTAL       1,199,881.91