Bid Tabulations
Letting of
09/28/2011
LA DOTD Headquarters
| Lead Project: H.007954.6 | |
| Parish: Desoto | |
| Routes: LA 3248 | |
| Description: LA 3248 Creek Bridges | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $960,432.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 28218 | F. J. Burnell, Inc. | $798,666.72 |
| 2 | 49239 | W L Bass Construction Inc. | $798,987.23 |
| 3 | 48925 | David V. Temple | $814,164.80 |
| 4 | 30774 | Progressive Construction Co., LLC | $890,674.58 |
| 5 | 01012 | Cecil D. Gassiott, LLC | $950,096.91 |
| 6 | 09090 | Guinn Brothers, LLC. | $985,619.91 |
| 7 | 18546 | C W & W Contractors, Inc. | $1,012,104.97 |
| 8 | 12135 | Blount Bros. Construction, Inc. | $1,078,829.44 |
| 9 | 44289 | Jeff Mercer LLC | $1,199,881.91 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - F. J. Burnell, Inc. |
- 2 - W L Bass Construction Inc. |
- 3 - David V. Temple |
- 4 - Progressive Construction Co., LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 | 12,778.10 | 12,778.10 | 15,000.00 | 15,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 250.00 | 250.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160702591 STA 209+84.00 TREATED TIMBER TRESTLE 39' X 22' | 1 | EACH | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160701721 STA 114+48.00 PRECAST CONCRETE SLAB UNITS 38' X 24' | 1 | EACH | 7,500.00 | 7,500.00 | 6,000.00 | 6,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160703051 STA 310+00.00 TREATED TIMBER TRESTLE 38' x 22' | 1 | EACH | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 1,260 | LNFT | 3.00 | 3,780.00 | 2.00 | 2,520.00 | 1.00 | 1,260.00 | 5.00 | 6,300.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,128.4 | SQYD | 6.00 | 6,770.40 | 5.00 | 5,642.00 | 5.22 | 5,890.25 | 10.00 | 11,284.00 |
| 0008 | 203-01-00100 | General Excavation | 529 | CUYD | 10.00 | 5,290.00 | 7.00 | 3,703.00 | 10.00 | 5,290.00 | 10.00 | 5,290.00 |
| 0009 | 203-03-00100 | Embankment | 1,167 | CUYD | 12.00 | 14,004.00 | 15.00 | 17,505.00 | 20.00 | 23,340.00 | 20.00 | 23,340.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 11 | EACH | 80.00 | 880.00 | 0.00 | 0.00 | 200.00 | 2,200.00 | 250.00 | 2,750.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 1,734 | LNFT | 3.00 | 5,202.00 | 0.00 | 0.00 | 4.50 | 7,803.00 | 3.00 | 5,202.00 |
| 0012 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,418.6 | SQYD | 17.00 | 24,116.20 | 25.00 | 35,465.00 | 18.50 | 26,244.10 | 27.00 | 38,302.20 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 20.11 | TON | 1.00 | 20.11 | 0.00 | 0.00 | 298.35 | 5,999.82 | 1,000.00 | 20,110.00 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 76.9 | CUYD | 90.00 | 6,921.00 | 90.00 | 6,921.00 | 56.40 | 4,337.16 | 100.00 | 7,690.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 403.2 | TON | 150.00 | 60,480.00 | 135.00 | 54,432.00 | 207.00 | 83,462.40 | 200.00 | 80,640.00 |
| 0016 | 711-02-00400 | Riprap (55 lb) | 780 | CUYD | 65.00 | 50,700.00 | 105.00 | 81,900.00 | 87.75 | 68,445.00 | 50.00 | 39,000.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 17,000.00 | 17,000.00 |
| 0018 | 716-01-00100 | Mulch (Vegetative) | 1.2 | TON | 1,000.00 | 1,200.00 | 2,000.00 | 2,400.00 | 3,000.00 | 3,600.00 | 3,300.00 | 3,960.00 |
| 0019 | 717-01-00100 | Seeding | 15 | LB | 20.00 | 300.00 | 10.00 | 150.00 | 100.00 | 1,500.00 | 110.00 | 1,650.00 |
| 0020 | 718-01-00100 | Fertilizer | 600 | LB | 1.00 | 600.00 | 1.00 | 600.00 | 3.00 | 1,800.00 | 3.30 | 1,980.00 |
| 0021 | 726-01-00100 | Bedding Material | 205.3 | CUYD | 80.00 | 16,424.00 | 1.00 | 205.30 | 72.00 | 14,781.60 | 90.00 | 18,477.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 67,000.00 | 67,000.00 | 60,000.00 | 60,000.00 | 80,000.00 | 80,000.00 | 42,000.00 | 42,000.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 19 | EACH | 50.00 | 950.00 | 20.00 | 380.00 | 100.00 | 1,900.00 | 110.00 | 2,090.00 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 6,000.00 | 1,416.00 | 8,000.00 | 1,888.00 | 10,000.00 | 2,360.00 | 11,000.00 | 2,596.00 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.118 | MILE | 6,000.00 | 708.00 | 4,000.00 | 472.00 | 4,000.00 | 472.00 | 4,400.00 | 519.20 |
| 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,500.00 | 7,500.00 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 |
| 0027 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 109.05 | CUYD | 1,000.00 | 109,050.00 | 1,265.00 | 137,948.25 | 1,050.00 | 114,502.50 | 1,500.00 | 163,575.00 |
| 0028 | 805-12-02040 | Reinforced Concrete Box Culverts (7' x 5') | 192 | LNFT | 530.00 | 101,760.00 | 500.00 | 96,000.00 | 480.00 | 92,160.00 | 440.00 | 84,480.00 |
| 0029 | 805-12-05000 | Reinforced Concrete Box Culverts (8' x 8') | 384 | LNFT | 650.00 | 249,600.00 | 650.00 | 249,600.00 | 545.00 | 209,280.00 | 590.00 | 226,560.00 |
| 0030 | 806-01-00100 | Deformed Reinforcing Steel | 7,911.88 | LB | 1.00 | 7,911.88 | 0.25 | 1,977.97 | 1.00 | 7,911.88 | 2.00 | 15,823.76 |
| 0031 | 711-04-00100 | Geotextile Fabric | 527.71 | SQYD | 3.00 | 1,583.13 | 1.00 | 527.71 | 3.50 | 1,846.99 | 2.00 | 1,055.42 |
| CONTRACTOR TOTAL | 798,666.72 | 798,987.23 | 814,164.80 | 890,674.58 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Cecil D. Gassiott, LLC |
- 6 - Guinn Brothers, LLC. |
- 7 - C W & W Contractors, Inc. |
- 8 - Blount Bros. Construction, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160702591 STA 209+84.00 TREATED TIMBER TRESTLE 39' X 22' | 1 | EACH | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 2,500.00 | 2,500.00 | 30,000.00 | 30,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160701721 STA 114+48.00 PRECAST CONCRETE SLAB UNITS 38' X 24' | 1 | EACH | 12,000.00 | 12,000.00 | 12,500.00 | 12,500.00 | 3,500.00 | 3,500.00 | 25,000.00 | 25,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160703051 STA 310+00.00 TREATED TIMBER TRESTLE 38' x 22' | 1 | EACH | 9,000.00 | 9,000.00 | 8,000.00 | 8,000.00 | 2,500.00 | 2,500.00 | 25,000.00 | 25,000.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 1,260 | LNFT | 15.00 | 18,900.00 | 2.00 | 2,520.00 | 2.00 | 2,520.00 | 7.00 | 8,820.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,128.4 | SQYD | 5.00 | 5,642.00 | 6.00 | 6,770.40 | 5.00 | 5,642.00 | 5.00 | 5,642.00 |
| 0008 | 203-01-00100 | General Excavation | 529 | CUYD | 8.00 | 4,232.00 | 10.00 | 5,290.00 | 12.00 | 6,348.00 | 5.00 | 2,645.00 |
| 0009 | 203-03-00100 | Embankment | 1,167 | CUYD | 25.00 | 29,175.00 | 25.00 | 29,175.00 | 15.00 | 17,505.00 | 20.00 | 23,340.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 11 | EACH | 200.00 | 2,200.00 | 100.00 | 1,100.00 | 50.00 | 550.00 | 200.00 | 2,200.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 1,734 | LNFT | 4.00 | 6,936.00 | 3.00 | 5,202.00 | 3.00 | 5,202.00 | 3.00 | 5,202.00 |
| 0012 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,418.6 | SQYD | 30.00 | 42,558.00 | 22.00 | 31,209.20 | 45.00 | 63,837.00 | 25.00 | 35,465.00 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 20.11 | TON | 290.00 | 5,831.90 | 500.00 | 10,055.00 | 200.00 | 4,022.00 | 305.00 | 6,133.55 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 76.9 | CUYD | 100.00 | 7,690.00 | 100.00 | 7,690.00 | 65.00 | 4,998.50 | 100.00 | 7,690.00 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 403.2 | TON | 215.00 | 86,688.00 | 220.00 | 88,704.00 | 215.00 | 86,688.00 | 150.00 | 60,480.00 |
| 0016 | 711-02-00400 | Riprap (55 lb) | 780 | CUYD | 115.00 | 89,700.00 | 80.00 | 62,400.00 | 65.00 | 50,700.00 | 80.00 | 62,400.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 |
| 0018 | 716-01-00100 | Mulch (Vegetative) | 1.2 | TON | 3,000.00 | 3,600.00 | 2,000.00 | 2,400.00 | 2,500.00 | 3,000.00 | 600.00 | 720.00 |
| 0019 | 717-01-00100 | Seeding | 15 | LB | 16.00 | 240.00 | 25.00 | 375.00 | 25.00 | 375.00 | 20.00 | 300.00 |
| 0020 | 718-01-00100 | Fertilizer | 600 | LB | 3.00 | 1,800.00 | 1.00 | 600.00 | 2.00 | 1,200.00 | 1.00 | 600.00 |
| 0021 | 726-01-00100 | Bedding Material | 205.3 | CUYD | 70.00 | 14,371.00 | 100.00 | 20,530.00 | 130.00 | 26,689.00 | 80.00 | 16,424.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 100,000.00 | 100,000.00 | 80,000.00 | 80,000.00 | 50,000.00 | 50,000.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 19 | EACH | 100.00 | 1,900.00 | 30.00 | 570.00 | 20.00 | 380.00 | 10.00 | 190.00 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 11,000.00 | 2,596.00 | 10,000.00 | 2,360.00 | 6,000.00 | 1,416.00 | 3,500.00 | 826.00 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.118 | MILE | 4,000.00 | 472.00 | 6,000.00 | 708.00 | 12,000.00 | 1,416.00 | 2,500.00 | 295.00 |
| 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 |
| 0027 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 109.05 | CUYD | 1,400.00 | 152,670.00 | 1,500.00 | 163,575.00 | 1,300.00 | 141,765.00 | 1,000.00 | 109,050.00 |
| 0028 | 805-12-02040 | Reinforced Concrete Box Culverts (7' x 5') | 192 | LNFT | 500.00 | 96,000.00 | 485.00 | 93,120.00 | 550.00 | 105,600.00 | 750.00 | 144,000.00 |
| 0029 | 805-12-05000 | Reinforced Concrete Box Culverts (8' x 8') | 384 | LNFT | 600.00 | 230,400.00 | 631.00 | 242,304.00 | 850.00 | 326,400.00 | 1,000.00 | 384,000.00 |
| 0030 | 806-01-00100 | Deformed Reinforcing Steel | 7,911.88 | LB | 1.00 | 7,911.88 | 2.00 | 15,823.76 | 2.00 | 15,823.76 | 2.00 | 15,823.76 |
| 0031 | 711-04-00100 | Geotextile Fabric | 527.71 | SQYD | 3.00 | 1,583.13 | 5.00 | 2,638.55 | 1.00 | 527.71 | 3.00 | 1,583.13 |
| CONTRACTOR TOTAL | 950,096.91 | 985,619.91 | 1,012,104.97 | 1,078,829.44 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Jeff Mercer LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 30,000.00 | 30,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160702591 STA 209+84.00 TREATED TIMBER TRESTLE 39' X 22' | 1 | EACH | 25,000.00 | 25,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160701721 STA 114+48.00 PRECAST CONCRETE SLAB UNITS 38' X 24' | 1 | EACH | 15,000.00 | 15,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge STRUCTURE NO. 04168160703051 STA 310+00.00 TREATED TIMBER TRESTLE 38' x 22' | 1 | EACH | 15,000.00 | 15,000.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 1,260 | LNFT | 5.00 | 6,300.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,128.4 | SQYD | 4.00 | 4,513.60 |
| 0008 | 203-01-00100 | General Excavation | 529 | CUYD | 10.00 | 5,290.00 |
| 0009 | 203-03-00100 | Embankment | 1,167 | CUYD | 25.00 | 29,175.00 |
| 0010 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 11 | EACH | 150.00 | 1,650.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 1,734 | LNFT | 1.00 | 1,734.00 |
| 0012 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,418.6 | SQYD | 50.00 | 70,930.00 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 20.11 | TON | 100.00 | 2,011.00 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 76.9 | CUYD | 45.00 | 3,460.50 |
| 0015 | 502-01-00100 | Superpave Asphaltic Concrete | 403.2 | TON | 225.00 | 90,720.00 |
| 0016 | 711-02-00400 | Riprap (55 lb) | 780 | CUYD | 75.00 | 58,500.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 50,000.00 | 50,000.00 |
| 0018 | 716-01-00100 | Mulch (Vegetative) | 1.2 | TON | 1,050.00 | 1,260.00 |
| 0019 | 717-01-00100 | Seeding | 15 | LB | 5.00 | 75.00 |
| 0020 | 718-01-00100 | Fertilizer | 600 | LB | 5.00 | 3,000.00 |
| 0021 | 726-01-00100 | Bedding Material | 205.3 | CUYD | 125.00 | 25,662.50 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 150,000.00 | 150,000.00 |
| 0023 | 731-02-00100 | Reflectorized Raised Pavement Markers | 19 | EACH | 5.50 | 104.50 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.236 | MILE | 1,500.00 | 354.00 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.118 | MILE | 1,500.00 | 177.00 |
| 0026 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0027 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 109.05 | CUYD | 1,050.00 | 114,502.50 |
| 0028 | 805-12-02040 | Reinforced Concrete Box Culverts (7' x 5') | 192 | LNFT | 650.00 | 124,800.00 |
| 0029 | 805-12-05000 | Reinforced Concrete Box Culverts (8' x 8') | 384 | LNFT | 800.00 | 307,200.00 |
| 0030 | 806-01-00100 | Deformed Reinforcing Steel | 7,911.88 | LB | 2.00 | 15,823.76 |
| 0031 | 711-04-00100 | Geotextile Fabric | 527.71 | SQYD | 5.00 | 2,638.55 |
| CONTRACTOR TOTAL | 1,199,881.91 | |||||