Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.007924.6 | |
| Parish: Calcasieu | |
| Routes: LA 378 | |
| Description: LA 378: JOHN STINE RD - PHILLIPS RD | |
| Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $709,448.87 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00183 | R. E. Heidt Construction Co., LLC | $660,772.34 |
| 2 | 14096 | Bessette Development Corp. | $723,000.00 |
| 3 | 34356 | Prairie Contractors Inc. | $906,696.41 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - R. E. Heidt Construction Co., LLC |
- 2 - Bessette Development Corp. |
- 3 - Prairie Contractors Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 1,672.56 | 1,672.56 | 3,300.00 | 3,300.00 | 3,600.00 | 3,600.00 |
| 0002 | 202-02-40120 | Removal of Traffic Detectors and Associated Equipment | 1 | LUMP | 303.00 | 303.00 | 450.00 | 450.00 | 500.00 | 500.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 256 | CUYD | 17.50 | 4,480.00 | 100.00 | 25,600.00 | 100.00 | 25,600.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 4,599 | TON | 87.00 | 400,113.00 | 97.75 | 449,552.25 | 101.00 | 464,499.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 254.2 | TON | 110.00 | 27,962.00 | 108.75 | 27,644.25 | 175.00 | 44,485.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 21,655 | SQYD | 1.25 | 27,068.75 | 1.50 | 32,482.50 | 3.00 | 64,965.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -1,314 | CUYD | 2.30 | -3,022.20 | 0.55 | -722.70 | 19.00 | -24,966.00 |
| 0008 | 510-01-00300 | Pavement Patching (18" Minimum Thickness) | 82 | SQYD | 132.00 | 10,824.00 | 143.00 | 11,726.00 | 225.00 | 18,450.00 |
| 0009 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 2,020.00 | 2,020.00 | 4,560.00 | 4,560.00 | 1,200.00 | 1,200.00 |
| 0010 | 707-01-00100 | Concrete Curb | 20 | LNFT | 50.50 | 1,010.00 | 54.00 | 1,080.00 | 25.00 | 500.00 |
| 0011 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 2,424.00 | 2,424.00 | 2,520.00 | 2,520.00 | 75,000.00 | 75,000.00 |
| 0012 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 332 | LNFT | 0.21 | 69.72 | 0.25 | 83.00 | 0.01 | 3.32 |
| 0013 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 1,407 | LNFT | 0.61 | 858.27 | 0.75 | 1,055.25 | 0.01 | 14.07 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.182 | MILE | 650.00 | 3,368.30 | 161.00 | 834.30 | 400.00 | 2,072.80 |
| 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.394 | MILE | 303.00 | 1,331.38 | 509.00 | 2,236.55 | 0.01 | 0.04 |
| 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 9.736 | MILE | 606.00 | 5,900.02 | 590.00 | 5,744.24 | 0.01 | 0.10 |
| 0017 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 50.50 | 404.00 | 48.25 | 386.00 | 0.01 | 0.08 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 13,796.66 | 13,796.66 | 75,000.00 | 75,000.00 |
| 0019 | 729-01-00100 | Sign (Type A) | 12.5 | SQFT | 64.64 | 808.00 | 47.00 | 587.50 | 50.00 | 625.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 308 | EACH | 5.05 | 1,555.40 | 5.65 | 1,740.20 | 5.50 | 1,694.00 |
| 0021 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 493 | LNFT | 3.03 | 1,493.79 | 4.85 | 2,391.05 | 3.50 | 1,725.50 |
| 0022 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 332 | LNFT | 2.02 | 670.64 | 1.50 | 498.00 | 3.00 | 996.00 |
| 0023 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 124 | LNFT | 6.06 | 751.44 | 5.25 | 651.00 | 7.00 | 868.00 |
| 0024 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.394 | MILE | 2,626.00 | 8,912.64 | 2,625.00 | 8,909.25 | 2,800.00 | 9,503.20 |
| 0025 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.498 | MILE | 808.00 | 1,210.38 | 910.00 | 1,363.18 | 1,000.00 | 1,498.00 |
| 0026 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 4 | EACH | 252.50 | 1,010.00 | 230.00 | 920.00 | 300.00 | 1,200.00 |
| 0027 | 732-05-00100 | Removal of Existing Markings | 0.057 | MILE | 4,040.00 | 230.28 | 5,360.00 | 305.52 | 5,000.00 | 285.00 |
| 0028 | 735-01-00100 | Mailboxes | 13 | EACH | 12.12 | 157.56 | 12.75 | 165.75 | 15.00 | 195.00 |
| 0029 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 95.95 | 1,247.35 | 101.00 | 1,313.00 | 200.00 | 2,600.00 |
| 0030 | 736-01-00100 | Trenching and Backfilling | 205 | LNFT | 8.39 | 1,719.95 | 5.00 | 1,025.00 | 5.00 | 1,025.00 |
| 0031 | 736-03-00300 | Jacked or Bored Conduit (3" HPDE, Sch 80) | 206 | LNFT | 13.64 | 2,809.84 | 14.00 | 2,884.00 | 15.00 | 3,090.00 |
| 0032 | 736-04-04080 | Signal Support (25' Single Mast Arm) | 2 | EACH | 8,256.75 | 16,513.50 | 9,220.00 | 18,440.00 | 9,000.00 | 18,000.00 |
| 0033 | 736-04-04160 | Signal Support (45' Single Mast Arm) | 2 | EACH | 11,170.60 | 22,341.20 | 12,625.00 | 25,250.00 | 12,000.00 | 24,000.00 |
| 0034 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 5 | EACH | 1,166.55 | 5,832.75 | 925.00 | 4,625.00 | 900.00 | 4,500.00 |
| 0035 | 736-05-02020 | Signal Heads (3 Section, 12" Led Lens, R, LT. Y, LT. G) | 4 | EACH | 1,292.80 | 5,171.20 | 968.00 | 3,872.00 | 950.00 | 3,800.00 |
| 0036 | 736-05-02040 | Signal Heads (3 Section, 12" Led Lens, R, RT. Y, RT. G) | 1 | EACH | 1,292.80 | 1,292.80 | 965.00 | 965.00 | 950.00 | 950.00 |
| 0037 | 736-06-00200 | Signal Service (Pedestal Required) | 1 | EACH | 1,828.10 | 1,828.10 | 1,915.00 | 1,915.00 | 1,850.00 | 1,850.00 |
| 0038 | 736-08-00111 | Sig Cntrlr (TS-2, Type 2)(Type 6E Cabinet)(Furnish & Install) | 1 | EACH | 25,840.85 | 25,840.85 | 29,065.00 | 29,065.00 | 28,000.00 | 28,000.00 |
| 0039 | 736-10-00300 | Underground Junction Box (Type F) | 3 | EACH | 646.40 | 1,939.20 | 495.00 | 1,485.00 | 500.00 | 1,500.00 |
| 0040 | 736-10-00500 | Underground Junction Box (Type H) | 1 | EACH | 1,212.00 | 1,212.00 | 895.00 | 895.00 | 900.00 | 900.00 |
| 0041 | 736-11-00300 | Conduit (2" HDPE, Schedule 80) | 144 | LNFT | 3.99 | 574.56 | 1.90 | 273.60 | 2.00 | 288.00 |
| 0042 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 60 | LNFT | 8.59 | 515.40 | 3.40 | 204.00 | 4.00 | 240.00 |
| 0043 | 736-12-02000 | Conductor (3c, 6 gauge / #6 awg) | 102 | LNFT | 3.54 | 361.08 | 3.35 | 341.70 | 4.00 | 408.00 |
| 0044 | 736-12-04000 | Conductor (6c, #14 awg) | 281 | LNFT | 2.58 | 724.98 | 1.75 | 491.75 | 2.00 | 562.00 |
| 0045 | 736-12-06000 | Conductor (10c, #14 awg) | 675 | LNFT | 3.39 | 2,288.25 | 2.15 | 1,451.25 | 2.50 | 1,687.50 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,300.00 | 6,300.00 | 5,775.00 | 5,775.00 | 15,000.00 | 15,000.00 |
| 0047 | NS-602-00001 | Milling Concrete Pavement | 459.6 | SQYD | 11.49 | 5,280.80 | 5.25 | 2,412.90 | 18.00 | 8,272.80 |
| 0048 | NS-736-00001 | GPS | 1 | EACH | 1,004.95 | 1,004.95 | 1,050.00 | 1,050.00 | 1,000.00 | 1,000.00 |
| 0049 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 9,064.75 | 9,064.75 | 8,935.00 | 8,935.00 | 8,500.00 | 8,500.00 |
| 0050 | NS-736-00006 | Video Detection Camera | 4 | EACH | 2,737.10 | 10,948.40 | 2,055.00 | 8,220.00 | 2,000.00 | 8,000.00 |
| 0051 | NS-736-00007 | Video Detection Training | 1 | LUMP | 101.00 | 101.00 | 1.05 | 1.05 | 10.00 | 10.00 |
| 0052 | NS-MSC-00080 | Detectable Warning System Retrofit for Curb Ramps | 5 | EACH | 454.50 | 2,272.50 | 450.00 | 2,250.00 | 600.00 | 3,000.00 |
| CONTRACTOR TOTAL | 660,772.34 | 723,000.00 | 906,696.41 | |||||||