| Lead Project: H.007897.6 | |
| Parish: Bossier | |
| Routes: LA 3105 | |
| Description: LA 3105 TURN LANE IMPROVEMENTS | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $155,998.88 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 28218 | F. J. Burnell, Inc. | $87,524.00 |
| 2 | 48462 | Fessler And Bowman, Inc. | $104,151.57 |
| 3 | 36374 | Best-Yet Builders, Llc | $119,905.00 |
| 4 | 30774 | Progressive Construction Co., LLC | $134,415.95 |
| 5 | 39001 | Jd's Rebar & Construction Inc. | $198,342.31 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - F. J. Burnell, Inc. |
- 2 - Fessler And Bowman, Inc. |
- 3 - Best-Yet Builders, Llc |
- 4 - Progressive Construction Co., LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,000.00 | 4,000.00 | 2,671.82 | 2,671.82 | 2,500.00 | 2,500.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 323 | SQYD | 10.00 | 3,230.00 | 9.26 | 2,990.98 | 20.00 | 6,460.00 | 9.65 | 3,116.95 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 255 | LNFT | 10.00 | 2,550.00 | 10.06 | 2,565.30 | 10.00 | 2,550.00 | 5.00 | 1,275.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 4,000.00 | 4,000.00 | 5,871.63 | 5,871.63 | 8,150.00 | 8,150.00 | 5,000.00 | 5,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 20.00 | 160.00 | 17.40 | 139.20 | 10.00 | 80.00 | 20.00 | 160.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 320 | LNFT | 2.00 | 640.00 | 4.06 | 1,299.20 | 3.00 | 960.00 | 3.00 | 960.00 |
| 0007 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 265 | SQYD | 20.00 | 5,300.00 | 31.67 | 8,392.55 | 25.00 | 6,625.00 | 30.00 | 7,950.00 |
| 0008 | 304-05-00100 | Lime Treatment (Type E) | 3.75 | TON | 200.00 | 750.00 | 608.93 | 2,283.49 | 1,000.00 | 3,750.00 | 3,000.00 | 11,250.00 |
| 0009 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 238 | SQYD | 65.00 | 15,470.00 | 83.89 | 19,965.82 | 70.00 | 16,660.00 | 104.00 | 24,752.00 |
| 0010 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 8 | LNFT | 250.00 | 2,000.00 | 219.08 | 1,752.64 | 250.00 | 2,000.00 | 102.00 | 816.00 |
| 0011 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 4,500.00 | 4,500.00 | 3,951.80 | 3,951.80 | 3,000.00 | 3,000.00 | 4,750.00 | 4,750.00 |
| 0012 | 706-02-00200 | Concrete Drive (6" Thick) | 259 | SQYD | 48.00 | 12,432.00 | 84.32 | 21,838.88 | 50.00 | 12,950.00 | 73.00 | 18,907.00 |
| 0013 | 707-01-00200 | Concrete Curb (Barrier) | 255 | LNFT | 8.00 | 2,040.00 | 10.35 | 2,639.25 | 10.00 | 2,550.00 | 13.00 | 3,315.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,000.00 | 4,000.00 | 5,509.40 | 5,509.40 | 10,000.00 | 10,000.00 | 3,500.00 | 3,500.00 |
| 0015 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 300 | SQYD | 5.00 | 1,500.00 | 4.64 | 1,392.00 | 10.00 | 3,000.00 | 10.00 | 3,000.00 |
| 0016 | 726-01-00100 | Bedding Material | 1.5 | CUYD | 200.00 | 300.00 | 318.96 | 478.44 | 500.00 | 750.00 | 124.00 | 186.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 7,500.00 | 7,500.00 | 6,133.16 | 6,133.16 | 15,000.00 | 15,000.00 | 18,000.00 | 18,000.00 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 19 | EACH | 33.00 | 627.00 | 23.20 | 440.80 | 20.00 | 380.00 | 33.00 | 627.00 |
| 0019 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 320 | LNFT | 3.00 | 960.00 | 3.48 | 1,113.60 | 3.00 | 960.00 | 2.20 | 704.00 |
| 0020 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 190 | LNFT | 5.00 | 950.00 | 5.80 | 1,102.00 | 5.00 | 950.00 | 4.40 | 836.00 |
| 0021 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.025 | MILE | 10,000.00 | 250.00 | 23,197.50 | 579.94 | 20,000.00 | 500.00 | 8,800.00 | 220.00 |
| 0022 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 350.00 | 700.00 | 463.95 | 927.90 | 400.00 | 800.00 | 330.00 | 660.00 |
| 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 985.89 | 985.89 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 |
| 0024 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,665 | INLF | 1.00 | 2,665.00 | 0.99 | 2,638.35 | 2.00 | 5,330.00 | 1.40 | 3,731.00 |
| 0025 | NS-713-00001 | Dynamic Message Sign Unit | 1 | EACH | 2,500.00 | 2,500.00 | 1,565.83 | 1,565.83 | 3,000.00 | 3,000.00 | 1,300.00 | 1,300.00 |
| 0026 | NS-SRP-00005 | Adjust Catch Basin (Type A) | 1 | EACH | 3,000.00 | 3,000.00 | 2,460.85 | 2,460.85 | 2,500.00 | 2,500.00 | 3,300.00 | 3,300.00 |
| 0027 | NS-SRP-00006 | Adjust Catch Basin (Type C) | 1 | EACH | 3,000.00 | 3,000.00 | 2,460.85 | 2,460.85 | 3,500.00 | 3,500.00 | 3,100.00 | 3,100.00 |
| CONTRACTOR TOTAL | 87,524.00 | 104,151.57 | 119,905.00 | 134,415.95 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Jd's Rebar & Construction Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,000.00 | 4,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 323 | SQYD | 20.00 | 6,460.00 |
| 0003 | 202-02-06140 | Removal of Curbs (Concrete) | 255 | LNFT | 9.00 | 2,295.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 4,000.00 | 4,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 10.00 | 80.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 320 | LNFT | 3.00 | 960.00 |
| 0007 | 302-02-04121 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 265 | SQYD | 15.00 | 3,975.00 |
| 0008 | 304-05-00100 | Lime Treatment (Type E) | 3.75 | TON | 500.00 | 1,875.00 |
| 0009 | 601-01-00300 | Portland Cement Concrete Pavement (9" Thick) | 238 | SQYD | 40.00 | 9,520.00 |
| 0010 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 8 | LNFT | 200.00 | 1,600.00 |
| 0011 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 2,200.00 | 2,200.00 |
| 0012 | 706-02-00200 | Concrete Drive (6" Thick) | 259 | SQYD | 20.00 | 5,180.00 |
| 0013 | 707-01-00200 | Concrete Curb (Barrier) | 255 | LNFT | 15.00 | 3,825.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,500.00 | 6,500.00 |
| 0015 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 300 | SQYD | 12.00 | 3,600.00 |
| 0016 | 726-01-00100 | Bedding Material | 1.5 | CUYD | 500.00 | 750.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 123,859.81 | 123,859.81 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 19 | EACH | 15.00 | 285.00 |
| 0019 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 320 | LNFT | 1.50 | 480.00 |
| 0020 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 190 | LNFT | 2.50 | 475.00 |
| 0021 | 732-03-02010 | Plastic Pvmt Strip (Dotted Line)(4" W)(2' L)(Thermo 90 mil) | 0.025 | MILE | 5,000.00 | 125.00 |
| 0022 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 150.00 | 300.00 |
| 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,500.00 | 4,500.00 |
| 0024 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,665 | INLF | 1.50 | 3,997.50 |
| 0025 | NS-713-00001 | Dynamic Message Sign Unit | 1 | EACH | 4,500.00 | 4,500.00 |
| 0026 | NS-SRP-00005 | Adjust Catch Basin (Type A) | 1 | EACH | 1,500.00 | 1,500.00 |
| 0027 | NS-SRP-00006 | Adjust Catch Basin (Type C) | 1 | EACH | 1,500.00 | 1,500.00 |
| CONTRACTOR TOTAL | 198,342.31 | |||||