LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.007837.6
Parish: Acadia
Routes: LA 1120
Description: LA 1120: LA 100 - LA 98
Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, IN-PLACE STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK
Estimated Construction Cost: $3,699,351.39


RankLicenseBidderConstruction Bid
1 00481 Coastal Bridge Co., L.L.C. $3,264,586.96
2 08815 W. E. Mcdonald & Son, LLC. $3,288,356.26
3 34356 Prairie Contractors Inc. $3,478,309.90
4 12312 Gilchrist Construction Co. LLC $3,684,017.23
5 33663 Glenn Lege Construction Inc $3,697,963.05


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Coastal Bridge Co., L.L.C.
- 2 -
W. E. Mcdonald & Son, LLC.
- 3 -
Prairie Contractors Inc.
- 4 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-14500 Removal of Guard Rail 1,281      LNFT 10.00 12,810.00 2.00 2,562.00 15.00 19,215.00 7.00 8,967.00
0002 202-02-32100 Removal of Pipe (Cross Drain) (36" EQUIV CMPA) 64      LNFT 40.00 2,560.00 30.00 1,920.00 7.00 448.00 25.00 1,600.00
0003 202-02-32100 Removal of Pipe (Cross Drain) (42" EQUIV CMPA) 56      LNFT 45.00 2,520.00 40.00 2,240.00 7.00 392.00 30.00 1,680.00
0004 204-05-00100 Temporary Sediment Check Dams (Hay) 70      EACH 1.00 70.00 25.00 1,750.00 130.00 9,100.00 125.00 8,750.00
0005 303-01-00200 In-Place Cement Stabilized Base Course (8 1/2" Thick) 86,783      SQYD 5.10 442,593.30 6.06 525,904.98 6.25 542,393.75 5.75 499,002.25
0006 305-01-03020 Subgrade Layer (10" Thick) (Treated) 21,712      SQYD 5.50 119,416.00 12.20 264,886.40 12.50 271,400.00 13.50 293,112.00
0007 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 3,300      CUYD 30.00 99,000.00 22.00 72,600.00 32.00 105,600.00 30.00 99,000.00
0008 502-01-00100 Superpave Asphaltic Concrete 17,795.2    TON 80.00 1,423,616.00 93.25 1,659,402.40 93.25 1,659,402.40 90.00 1,601,568.00
0009 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,338.6    TON 1.00 1,338.60 50.00 66,930.00 50.00 66,930.00 140.00 187,404.00
0010 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 56,553      GAL 3.45 195,107.85 3.41 192,845.73 3.50 197,935.50 3.90 220,556.70
0011 507-02-00200 Aggregate (S2) 83,166      SQYD 1.00 83,166.00 0.89 74,017.74 0.95 79,007.70 1.00 83,166.00
0012 507-02-00300 Aggregate (S3) 83,166      SQYD 0.65 54,057.90 0.68 56,552.88 0.75 62,374.50 0.75 62,374.50
0013 509-01-00100 Cold Planing Asphaltic Pavement 77,125      SQYD 1.25 96,406.25 1.10 84,837.50 1.15 88,693.75 1.40 107,975.00
0014 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,008      CUYD 0.01 -40.08 0.01 -40.08 0.01 -40.08 1.00 -4,008.00
0015 510-01-00200 Pavement Patching (12" Minimum Thickness) 215      SQYD 115.00 24,725.00 125.00 26,875.00 166.00 35,690.00 85.00 18,275.00
0016 701-02-02080 Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) 72      LNFT 185.00 13,320.00 140.00 10,080.00 160.00 11,520.00 175.00 12,600.00
0017 701-02-02120 Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) 64      LNFT 215.00 13,760.00 200.00 12,800.00 215.00 13,760.00 220.00 14,080.00
0018 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 375      LNFT 45.00 16,875.00 49.00 18,375.00 52.00 19,500.00 50.00 18,750.00
0019 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 462.5    LNFT 60.00 27,750.00 70.00 32,375.00 72.00 33,300.00 65.00 30,062.50
0020 704-03-00100 Blocked Out Guard Rail 493.8    LNFT 20.00 9,876.00 20.00 9,876.00 22.00 10,863.60 22.00 10,863.60
0021 704-11-00200 Guard Rail End Treatment (Tangent) 16      EACH 2,500.00 40,000.00 2,450.00 39,200.00 2,500.00 40,000.00 2,700.00 43,200.00
0022 713-01-00100 Temporary Signs and Barricades 1      LUMP 100,000.00 100,000.00 6,800.00 6,800.00 50,000.00 50,000.00 50,000.00 50,000.00
0023 713-02-00500 Temporary Pavement Markings (24" Width) 44      LNFT 0.51 22.44 0.50 22.00 0.01 0.44 0.80 35.20
0024 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 12.383  MILE 400.00 4,953.20 400.00 4,953.20 400.00 4,953.20 450.00 5,572.35
0025 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 12.383  MILE 1.00 12.38 175.00 2,167.03 0.01 0.12 100.00 1,238.30
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 26.821  MILE 1.00 26.82 300.00 8,046.30 0.01 0.27 100.00 2,682.10
0027 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 1,630      EACH 1.50 2,445.00 1.50 2,445.00 1.75 2,852.50 1.75 2,852.50
0028 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 5,000.00 5,000.00 3,000.00 3,000.00 3,000.00 3,000.00 4,000.00 4,000.00
0029 726-01-00100 Bedding Material 30      CUYD 100.00 3,000.00 100.00 3,000.00 100.00 3,000.00 100.00 3,000.00
0030 727-01-00100 Mobilization 1      LUMP 320,000.00 320,000.00 50,000.00 50,000.00 100,000.00 100,000.00 225,000.00 225,000.00
0031 729-16-00200 Object Marker Assembly (Type 2) 8      EACH 65.00 520.00 80.00 640.00 100.00 800.00 75.00 600.00
0032 731-02-00100 Reflectorized Raised Pavement Markers 965      EACH 5.50 5,307.50 4.25 4,101.25 5.00 4,825.00 6.00 5,790.00
0033 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 44      LNFT 10.00 440.00 10.00 440.00 5.00 220.00 5.00 220.00
0034 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 13.41   MILE 2,700.00 36,207.00 2,600.00 34,866.00 2,500.00 33,525.00 2,600.00 34,866.00
0035 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 6.191  MILE 800.00 4,952.80 675.00 4,178.93 750.00 4,643.25 975.00 6,036.23
0036 735-01-00100 Mailboxes 22      EACH 1.00 22.00 1.00 22.00 2.00 44.00 18.00 396.00
0037 735-02-00100 Mailbox Supports (Single) 22      EACH 125.00 2,750.00 122.00 2,684.00 130.00 2,860.00 125.00 2,750.00
0038 740-01-00100 Construction Layout 1      LUMP 100,000.00 100,000.00 5,000.00 5,000.00 100.00 100.00 20,000.00 20,000.00
                         
    CONTRACTOR TOTAL       3,264,586.96   3,288,356.26   3,478,309.90   3,684,017.23



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Glenn Lege Construction Inc
Unit PriceTotal
Amount
0001 202-02-14500 Removal of Guard Rail 1,281      LNFT 7.50 9,607.50
0002 202-02-32100 Removal of Pipe (Cross Drain) (36" EQUIV CMPA) 64      LNFT 15.00 960.00
0003 202-02-32100 Removal of Pipe (Cross Drain) (42" EQUIV CMPA) 56      LNFT 15.00 840.00
0004 204-05-00100 Temporary Sediment Check Dams (Hay) 70      EACH 90.00 6,300.00
0005 303-01-00200 In-Place Cement Stabilized Base Course (8 1/2" Thick) 86,783      SQYD 5.70 494,663.10
0006 305-01-03020 Subgrade Layer (10" Thick) (Treated) 21,712      SQYD 13.73 298,105.76
0007 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 3,300      CUYD 30.00 99,000.00
0008 502-01-00100 Superpave Asphaltic Concrete 17,795.2    TON 86.50 1,539,284.80
0009 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 1,338.6    TON 114.50 153,269.70
0010 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 56,553      GAL 3.89 219,991.17
0011 507-02-00200 Aggregate (S2) 83,166      SQYD 1.03 85,660.98
0012 507-02-00300 Aggregate (S3) 83,166      SQYD 0.69 57,384.54
0013 509-01-00100 Cold Planing Asphaltic Pavement 77,125      SQYD 1.40 107,975.00
0014 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -4,008      CUYD 0.10 -400.80
0015 510-01-00200 Pavement Patching (12" Minimum Thickness) 215      SQYD 105.33 22,645.95
0016 701-02-02080 Cross Drain Pipe Arch (36" Equiv. RCPA or 42" Equiv. CMPA) 72      LNFT 174.27 12,547.44
0017 701-02-02120 Cross Drain Pipe Arch (42" Equiv. RCPA or 48" Equiv. CMPA) 64      LNFT 210.39 13,464.96
0018 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 375      LNFT 54.44 20,415.00
0019 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 462.5    LNFT 77.77 35,968.63
0020 704-03-00100 Blocked Out Guard Rail 493.8    LNFT 22.22 10,972.24
0021 704-11-00200 Guard Rail End Treatment (Tangent) 16      EACH 2,721.95 43,551.20
0022 713-01-00100 Temporary Signs and Barricades 1      LUMP 7,582.58 7,582.58
0023 713-02-00500 Temporary Pavement Markings (24" Width) 44      LNFT 0.67 29.48
0024 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 12.383  MILE 300.00 3,714.90
0025 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 12.383  MILE 222.20 2,751.50
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 26.821  MILE 444.40 11,919.25
0027 713-06-00200 Temporary Reflectorized Raised Pavement Markers (Tabs) 1,630      EACH 1.67 2,722.10
0028 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 8,005.55 8,005.55
0029 726-01-00100 Bedding Material 30      CUYD 95.00 2,850.00
0030 727-01-00100 Mobilization 1      LUMP 362,337.50 362,337.50
0031 729-16-00200 Object Marker Assembly (Type 2) 8      EACH 88.88 711.04
0032 731-02-00100 Reflectorized Raised Pavement Markers 965      EACH 5.00 4,825.00
0033 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 44      LNFT 5.05 222.20
0034 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 13.41   MILE 2,666.40 35,756.42
0035 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 6.191  MILE 777.70 4,814.74
0036 735-01-00100 Mailboxes 22      EACH 27.78 611.16
0037 735-02-00100 Mailbox Supports (Single) 22      EACH 194.43 4,277.46
0038 740-01-00100 Construction Layout 1      LUMP 12,625.00 12,625.00
             
    CONTRACTOR TOTAL       3,697,963.05