Bid Tabulations
Letting of
10/26/2011
LA DOTD Headquarters
| Lead Project: H.007559.6 | |
| Parish: St. John | |
| Routes: | |
| Description: St John Eastbank Mississippi River Multi-Use Trail, Phase II | |
| Type Const: CLEARING AND GRUBBING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, TRAFFIC SIGNALIZATION, AND RELATED WORK. | |
| Estimated Construction Cost: $829,044.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $897,771.95 |
| 2 | 38610 | Three C's Properties Inc | $916,148.96 |
| 3 | 02179 | Boh Bros. Construction Co., LLC. | $934,583.05 |
| 4 | 00935 | Fleming Construction Co., Inc. | $987,541.55 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Three C's Properties Inc |
- 3 - Boh Bros. Construction Co., LLC. |
- 4 - Fleming Construction Co., Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1.00 | 1.00 | 2,615.00 | 2,615.00 | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 |
| 0002 | 202-02-38240 | Removal of Signs and Supports | 2 | EACH | 1.00 | 2.00 | 100.00 | 200.00 | 80.00 | 160.00 | 75.00 | 150.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 5,475.00 | 5,475.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,000 | CUYD | 25.00 | 100,000.00 | 22.30 | 89,200.00 | 30.00 | 120,000.00 | 20.00 | 80,000.00 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 10.00 | 100.00 | 15.00 | 150.00 | 120.00 | 1,200.00 | 150.00 | 1,500.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 500 | LNFT | 2.20 | 1,100.00 | 3.00 | 1,500.00 | 2.20 | 1,100.00 | 2.00 | 1,000.00 |
| 0007 | 302-01-00800 | Class II Base Course (Stone or Recycled Portland Cement Concrete) | 270.1 | CUYD | 125.00 | 33,762.50 | 70.20 | 18,961.02 | 100.00 | 27,010.00 | 90.00 | 24,309.00 |
| 0008 | 502-01-00100 | Superpave Asphaltic Concrete | 4,474.2 | TON | 99.00 | 442,945.80 | 149.65 | 669,564.03 | 120.00 | 536,904.00 | 125.00 | 559,275.00 |
| 0009 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 282 | LNFT | 50.00 | 14,100.00 | 26.55 | 7,487.10 | 75.00 | 21,150.00 | 100.00 | 28,200.00 |
| 0010 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,750.00 | 5,500.00 | 2,005.00 | 4,010.00 | 3,000.00 | 6,000.00 | 6,000.00 | 12,000.00 |
| 0011 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 10 | SQYD | 100.00 | 1,000.00 | 90.00 | 900.00 | 110.00 | 1,100.00 | 250.00 | 2,500.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 5,175.00 | 5,175.00 | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 |
| 0013 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 875 | SQYD | 1.25 | 1,093.75 | 2.00 | 1,750.00 | 1.20 | 1,050.00 | 1.50 | 1,312.50 |
| 0014 | 726-01-00100 | Bedding Material | 26.9 | CUYD | 100.00 | 2,690.00 | 77.50 | 2,084.75 | 85.00 | 2,286.50 | 150.00 | 4,035.00 |
| 0015 | 727-01-00100 | Mobilization | 1 | LUMP | 89,000.00 | 89,000.00 | 25,945.00 | 25,945.00 | 93,000.00 | 93,000.00 | 90,000.00 | 90,000.00 |
| 0016 | 729-01-00100 | Sign (Type A) | 157.8 | SQFT | 20.00 | 3,156.00 | 15.90 | 2,509.02 | 20.00 | 3,156.00 | 20.00 | 3,156.00 |
| 0017 | 729-08-00200 | Mounting (3 1/2" Size Post) | 30 | EACH | 200.00 | 6,000.00 | 92.00 | 2,760.00 | 400.00 | 12,000.00 | 800.00 | 24,000.00 |
| 0018 | 730-01-00100 | Trenching and Backfilling | 200 | LNFT | 2.50 | 500.00 | 3.50 | 700.00 | 2.60 | 520.00 | 3.00 | 600.00 |
| 0019 | 730-02-01040 | Conduit with Conductors (PVC/HDPE) (1") 1"C, 3#10, 1#10G | 490 | LNFT | 8.00 | 3,920.00 | 8.50 | 4,165.00 | 8.00 | 3,920.00 | 9.00 | 4,410.00 |
| 0020 | 730-02-01080 | Conduit with Conductors (PVC/HDPE) (1 1/2") 1 1/2"C, 3#8, 1#10G | 5 | LNFT | 310.00 | 1,550.00 | 25.00 | 125.00 | 330.00 | 1,650.00 | 350.00 | 1,750.00 |
| 0021 | 730-04-00100 | Jacked or Bored Casing (4" Diameter) (PVC/HDPE) | 225 | LNFT | 29.00 | 6,525.00 | 27.00 | 6,075.00 | 30.00 | 6,750.00 | 35.00 | 7,875.00 |
| 0022 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 40 | LNFT | 33.00 | 1,320.00 | 31.60 | 1,264.00 | 35.00 | 1,400.00 | 40.00 | 1,600.00 |
| 0023 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 1,456 | LNFT | 0.60 | 873.60 | 0.75 | 1,092.00 | 0.65 | 946.40 | 0.75 | 1,092.00 |
| 0024 | 732-01-02000 | Plastic Pavement Striping (4" Width) (Thermoplastic 125 mil) | 265 | LNFT | 0.60 | 159.00 | 1.05 | 278.25 | 0.65 | 172.25 | 0.85 | 225.25 |
| 0025 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 161 | LNFT | 2.50 | 402.50 | 4.55 | 732.55 | 2.70 | 434.70 | 4.00 | 644.00 |
| 0026 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.048 | MILE | 850.00 | 2,590.80 | 1,130.00 | 3,444.24 | 900.00 | 2,743.20 | 1,100.00 | 3,352.80 |
| 0027 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 13 | EACH | 200.00 | 2,600.00 | 220.00 | 2,860.00 | 220.00 | 2,860.00 | 195.00 | 2,535.00 |
| 0028 | 732-04-02000 | Plastic Pavement Legends and Symbols (Bicycle) | 11 | EACH | 350.00 | 3,850.00 | 523.00 | 5,753.00 | 370.00 | 4,070.00 | 460.00 | 5,060.00 |
| 0029 | 736-04-02000 | Signal Support (Pedestal Pole) | 6 | EACH | 1,900.00 | 11,400.00 | 578.00 | 3,468.00 | 2,000.00 | 12,000.00 | 2,500.00 | 15,000.00 |
| 0030 | 736-05-01020 | Signal Heads (1 Section, 12" Led Lens, Y) | 4 | EACH | 500.00 | 2,000.00 | 385.00 | 1,540.00 | 500.00 | 2,000.00 | 600.00 | 2,400.00 |
| 0031 | 736-06-00100 | Signal Service | 1 | EACH | 6,000.00 | 6,000.00 | 2,100.00 | 2,100.00 | 6,000.00 | 6,000.00 | 6,500.00 | 6,500.00 |
| 0032 | 736-10-00300 | Underground Junction Box (Type F) | 2 | EACH | 750.00 | 1,500.00 | 523.00 | 1,046.00 | 750.00 | 1,500.00 | 850.00 | 1,700.00 |
| 0033 | 739-01-00100 | Hydro-Seeding | 5 | ACRE | 1,050.00 | 5,250.00 | 1,760.00 | 8,800.00 | 1,050.00 | 5,250.00 | 2,250.00 | 11,250.00 |
| 0034 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 6,400.00 | 6,400.00 | 6,000.00 | 6,000.00 | 20,000.00 | 20,000.00 |
| 0035 | NS-200-00020 | Cleaning Existing Ditches | 290 | LNFT | 7.00 | 2,030.00 | 8.00 | 2,320.00 | 5.00 | 1,450.00 | 9.00 | 2,610.00 |
| 0036 | NS-706-00100 | Truncated Dome System (Asphaltic Concrete Pavement) | 2 | EACH | 25.00 | 50.00 | 190.00 | 380.00 | 500.00 | 1,000.00 | 1,000.00 | 2,000.00 |
| 0037 | NS-ENH-02000 | Benches (Park) 6' Metal | 2 | EACH | 2,500.00 | 5,000.00 | 1,500.00 | 3,000.00 | 1,500.00 | 3,000.00 | 1,200.00 | 2,400.00 |
| 0038 | NS-ENH-16080 | Pedestrian Button Detector Complete and Installed | 2 | EACH | 1,000.00 | 2,000.00 | 920.00 | 1,840.00 | 1,100.00 | 2,200.00 | 1,200.00 | 2,400.00 |
| 0039 | NS-ENH-19000 | Safety Rail 54" Hich, Galvanized Pipe | 176 | LNFT | 300.00 | 52,800.00 | 105.00 | 18,480.00 | 100.00 | 17,600.00 | 75.00 | 13,200.00 |
| CONTRACTOR TOTAL | 897,771.95 | 916,148.96 | 934,583.05 | 987,541.55 | ||||||||