Bid Tabulations
Letting of
04/24/2013
LA DOTD Headquarters
| Lead Project: H.007493.6 | |
| Parish: Lincoln | |
| Routes: | |
| Description: Ruston Downtown Revitalization, Phase V | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,186,042.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 30774 | Progressive Construction Co., LLC | $1,148,765.96 |
| 2 | 18546 | C W & W Contractors, Inc. | $1,187,918.23 |
| 3 | 15099 | Amethyst Construction, Inc. | $1,306,900.54 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Progressive Construction Co., LLC |
- 2 - C W & W Contractors, Inc. |
- 3 - Amethyst Construction, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 45,000.00 | 45,000.00 | 18,000.00 | 18,000.00 |
| 0002 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 1,320 | LNFT | 11.00 | 14,520.00 | 10.00 | 13,200.00 | 14.00 | 18,480.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,658.02 | SQYD | 10.65 | 17,657.91 | 10.00 | 16,580.20 | 16.00 | 26,528.32 |
| 0004 | 202-02-32140 | Removal of Pipe (Storm Drain) 15" | 300 | LNFT | 21.50 | 6,450.00 | 15.00 | 4,500.00 | 28.00 | 8,400.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,842.47 | SQYD | 8.25 | 23,450.38 | 5.00 | 14,212.35 | 12.00 | 34,109.64 |
| 0006 | 202-02-46000 | Removal of Walls | 6,450 | SQFT | 2.00 | 12,900.00 | 1.00 | 6,450.00 | 1.25 | 8,062.50 |
| 0007 | 203-01-00100 | General Excavation Plan Quantity | 1,000 | CUYD | 8.75 | 8,750.00 | 15.00 | 15,000.00 | 24.00 | 24,000.00 |
| 0008 | 203-03-00100 | Embankment | 500 | CUYD | 23.50 | 11,750.00 | 20.00 | 10,000.00 | 42.00 | 21,000.00 |
| 0009 | 302-02-01061 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,200 | SQYD | 14.50 | 17,400.00 | 14.00 | 16,800.00 | 28.00 | 33,600.00 |
| 0010 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 3,400 | SQYD | 24.25 | 82,450.00 | 28.00 | 95,200.00 | 30.00 | 102,000.00 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 82.85 | 8,285.00 | 100.00 | 10,000.00 | 100.00 | 10,000.00 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 675 | TON | 210.00 | 141,750.00 | 250.00 | 168,750.00 | 220.00 | 148,500.00 |
| 0013 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 351 | LNFT | 61.50 | 21,586.50 | 65.00 | 22,815.00 | 100.00 | 35,100.00 |
| 0014 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 298 | LNFT | 78.00 | 23,244.00 | 95.00 | 28,310.00 | 110.00 | 32,780.00 |
| 0015 | 701-07-00200 | Yard Drain Pipe (6") PVC | 163 | LNFT | 19.50 | 3,178.50 | 16.00 | 2,608.00 | 60.00 | 9,780.00 |
| 0016 | 702-03-00800 | Catch Basins (CB-09) | 11 | EACH | 4,300.00 | 47,300.00 | 4,500.00 | 49,500.00 | 4,400.00 | 48,400.00 |
| 0017 | 702-04-00100 | Adjusting Manholes | 4 | EACH | 850.00 | 3,400.00 | 3,000.00 | 12,000.00 | 2,000.00 | 8,000.00 |
| 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 1,160 | SQYD | 55.00 | 63,800.00 | 55.00 | 63,800.00 | 80.00 | 92,800.00 |
| 0019 | 706-01-00300 | Concrete Walk (6" Thick) | 50 | SQYD | 102.00 | 5,100.00 | 80.00 | 4,000.00 | 88.00 | 4,400.00 |
| 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 330 | SQYD | 77.00 | 25,410.00 | 85.00 | 28,050.00 | 88.00 | 29,040.00 |
| 0021 | 706-04-00100 | Handicapped Curb Ramps 6" Reinforced | 6 | EACH | 1,575.00 | 9,450.00 | 1,500.00 | 9,000.00 | 1,600.00 | 9,600.00 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 1,700 | LNFT | 29.00 | 49,300.00 | 30.00 | 51,000.00 | 36.00 | 61,200.00 |
| 0023 | 710-01-00100 | Flowable Fill | 5 | CUYD | 125.00 | 625.00 | 400.00 | 2,000.00 | 140.00 | 700.00 |
| 0024 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,300.00 | 15,300.00 | 48,000.00 | 48,000.00 | 25,000.00 | 25,000.00 |
| 0025 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 500 | LNFT | 0.55 | 275.00 | 1.00 | 500.00 | 1.00 | 500.00 |
| 0026 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 50 | LNFT | 2.10 | 105.00 | 4.00 | 200.00 | 3.00 | 150.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 168,000.00 | 168,000.00 | 100,000.00 | 100,000.00 | 40,000.00 | 40,000.00 |
| 0028 | 729-01-00100 | Sign (Type A) | 40.84 | SQFT | 81.75 | 3,338.67 | 77.00 | 3,144.68 | 12.00 | 490.08 |
| 0029 | 730-01-00100 | Trenching and Backfilling | 1,100 | LNFT | 3.15 | 3,465.00 | 3.00 | 3,300.00 | 3.00 | 3,300.00 |
| 0030 | 730-02-01060 | Conduit with Conductors (PVC/HDPE) (1 1/4") Empty With Pull Tape | 1,100 | LNFT | 8.40 | 9,240.00 | 5.00 | 5,500.00 | 8.00 | 8,800.00 |
| 0031 | 730-05-10000 | Light Pole 14'-0" Pole W/ Fluted Shaft | 20 | EACH | 3,465.00 | 69,300.00 | 2,000.00 | 40,000.00 | 3,300.00 | 66,000.00 |
| 0032 | 730-07-04021 | Luminaire (175 Watt) (Metal Halide) | 20 | EACH | 1,050.00 | 21,000.00 | 900.00 | 18,000.00 | 1,000.00 | 20,000.00 |
| 0033 | 730-21-00020 | Duct Marker (Concrete) | 2 | EACH | 105.00 | 210.00 | 200.00 | 400.00 | 100.00 | 200.00 |
| 0034 | 730-22-00220 | Underground Marker Tape (3")(Detectable) | 1,100 | LNFT | 1.05 | 1,155.00 | 3.00 | 3,300.00 | 1.00 | 1,100.00 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 24 | EACH | 21.00 | 504.00 | 12.00 | 288.00 | 100.00 | 2,400.00 |
| 0036 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 820 | LNFT | 2.10 | 1,722.00 | 4.00 | 3,280.00 | 2.00 | 1,640.00 |
| 0037 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 280 | LNFT | 6.30 | 1,764.00 | 11.00 | 3,080.00 | 6.00 | 1,680.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 14,500.00 | 14,500.00 | 16,000.00 | 16,000.00 | 34,000.00 | 34,000.00 |
| 0039 | 741-06-00100 | Relocating Fire Hydrant Adjustment Only | 1 | EACH | 7,500.00 | 7,500.00 | 4,200.00 | 4,200.00 | 4,000.00 | 4,000.00 |
| 0040 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 4,000 | INLF | 0.50 | 2,000.00 | 3.00 | 12,000.00 | 2.00 | 8,000.00 |
| 0041 | NS-ENH-01040 | Adjusting Utility Boxes Sewer, Telephone, Gas | 18 | EACH | 250.00 | 4,500.00 | 500.00 | 9,000.00 | 1,400.00 | 25,200.00 |
| 0042 | NS-ENH-02000 | Benches (Park) 6' Metal Bench w/o Backrest, Furnished & Installed | 6 | EACH | 1,475.00 | 8,850.00 | 2,000.00 | 12,000.00 | 2,000.00 | 12,000.00 |
| 0043 | NS-ENH-02160 | Baskets (Hanging) Furnished & Installed | 40 | EACH | 40.00 | 1,600.00 | 70.00 | 2,800.00 | 300.00 | 12,000.00 |
| 0044 | NS-ENH-08000 | Handrails Complete & Installed | 35 | LNFT | 122.00 | 4,270.00 | 90.00 | 3,150.00 | 80.00 | 2,800.00 |
| 0045 | NS-ENH-09000 | Irrigation System Furnished & Installed | 1 | LUMP | 23,000.00 | 23,000.00 | 20,000.00 | 20,000.00 | 14,000.00 | 14,000.00 |
| 0046 | NS-ENH-16000 | Pavers (Brick) Running Bond Includes Polymeric Sand | 2,100 | SQFT | 15.00 | 31,500.00 | 15.00 | 31,500.00 | 8.00 | 16,800.00 |
| 0047 | NS-ENH-16035 | Pedestrian Access Ramp Special, Complete & Installed | 1 | EACH | 10,500.00 | 10,500.00 | 8,000.00 | 8,000.00 | 16,000.00 | 16,000.00 |
| 0048 | NS-ENH-16090 | Planter Metal, Furnished & Installed | 12 | EACH | 1,250.00 | 15,000.00 | 1,000.00 | 12,000.00 | 850.00 | 10,200.00 |
| 0049 | NS-ENH-16130 | Post (Decorative) 2.375" Diameter, Furnished & Installed | 4 | EACH | 550.00 | 2,200.00 | 500.00 | 2,000.00 | 750.00 | 3,000.00 |
| 0050 | NS-ENH-18060 | Roof Drain Downspouts Connect Downspout to Storm Drain | 13 | EACH | 650.00 | 8,450.00 | 800.00 | 10,400.00 | 750.00 | 9,750.00 |
| 0051 | NS-ENH-20000 | Temporary Business Entrances Handicapped Accessible | 1 | LUMP | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 |
| 0052 | NS-ENH-20020 | Trash Receptacle 36 Gal, Furnished & Installed | 2 | EACH | 900.00 | 1,800.00 | 1,400.00 | 2,800.00 | 1,200.00 | 2,400.00 |
| 0053 | NS-ENH-23120 | Water Valve and Meter Box (New Installation) 3/4" Curb Stop, Meter, Connection | 20 | EACH | 1,150.00 | 23,000.00 | 1,100.00 | 22,000.00 | 1,000.00 | 20,000.00 |
| 0054 | NS-P31-00001 | Water Main (6" PVC) | 15 | LNFT | 80.00 | 1,200.00 | 100.00 | 1,500.00 | 80.00 | 1,200.00 |
| 0055 | NS-P31-00003 | Water Main (12" PVC) | 365 | LNFT | 88.00 | 32,120.00 | 100.00 | 36,500.00 | 110.00 | 40,150.00 |
| 0056 | NS-P31-00004 | Gate Valve (6" with box) | 1 | EACH | 1,700.00 | 1,700.00 | 1,300.00 | 1,300.00 | 2,500.00 | 2,500.00 |
| 0057 | NS-P31-00006 | Gate Valve (12" with box) | 1 | EACH | 3,600.00 | 3,600.00 | 4,000.00 | 4,000.00 | 4,500.00 | 4,500.00 |
| 0058 | NS-P31-00008 | Water Service Line 2" PE | 30 | LNFT | 38.00 | 1,140.00 | 100.00 | 3,000.00 | 32.00 | 960.00 |
| 0059 | NS-P31-00008 | Water Service Line 3/4" PVC | 400 | LNFT | 16.00 | 6,400.00 | 30.00 | 12,000.00 | 28.00 | 11,200.00 |
| 0060 | NS-P31-00011 | Iron Fittings | 2,000 | LB | 8.00 | 16,000.00 | 8.00 | 16,000.00 | 28.00 | 56,000.00 |
| 0061 | NS-P31-00012 | Tie-In New Water Main | 2 | EACH | 1,800.00 | 3,600.00 | 800.00 | 1,600.00 | 2,000.00 | 4,000.00 |
| 0062 | NS-P31-00013 | Temporary Valve Furnished and Installed | 1 | EACH | 1,200.00 | 1,200.00 | 1,400.00 | 1,400.00 | 4,000.00 | 4,000.00 |
| 0063 | NS-P31-00014 | Abandoning Existing Water Mains | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 |
| CONTRACTOR TOTAL | 1,148,765.96 | 1,187,918.23 | 1,306,900.54 | |||||||