Bid Tabulations
Letting of
02/08/2012
LA DOTD Headquarters
| Lead Project: H.007337.6 | |
| Parish: St. Landry | |
| Routes: | |
| Description: EUNICE EAST ELEMENTARY SIDEWALK PROJECT | |
| Type Const: Clearing and grubbing, drainage structures, portland cement concrete sidewalks and related work | |
| Estimated Construction Cost: $75,766.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 39001 | Jd's Rebar & Construction Inc. | $61,117.70 |
| 2 | 52306 | Cecil Perry Improvements Llc | $93,920.00 |
| 3 | 51821 | Elliott Construction, LLC | $96,134.45 |
| 4 | 39104 | Rmk Construction Co. LLC | $107,443.70 |
| 5 | 30774 | Progressive Construction Co., LLC | $112,154.45 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Jd's Rebar & Construction Inc. |
- 2 - Cecil Perry Improvements Llc |
- 3 - Elliott Construction, LLC |
- 4 - Rmk Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,800.00 | 1,800.00 | 1,983.19 | 1,983.19 | 3,000.00 | 3,000.00 | 2,500.00 | 2,500.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 46 | SQYD | 46.00 | 2,116.00 | 11.22 | 516.12 | 50.00 | 2,300.00 | 5.00 | 230.00 |
| 0003 | 202-03-38000 | Relocation of Sign Move signs as directed | 3 | EACH | 25.00 | 75.00 | 68.00 | 204.00 | 25.00 | 75.00 | 150.00 | 450.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 3,000.00 | 3,000.00 | 18,610.00 | 18,610.00 | 12,000.00 | 12,000.00 | 6,500.00 | 6,500.00 |
| 0005 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 224 | LNFT | 19.00 | 4,256.00 | 28.50 | 6,384.00 | 48.75 | 10,920.00 | 35.00 | 7,840.00 |
| 0006 | 701-07-00300 | Yard Drain Pipe (8") | 9 | LNFT | 34.00 | 306.00 | 12.50 | 112.50 | 50.00 | 450.00 | 25.00 | 225.00 |
| 0007 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 1,800.00 | 7,200.00 | 1,990.00 | 7,960.00 | 3,150.00 | 12,600.00 | 3,950.00 | 15,800.00 |
| 0008 | 706-01-00200 | Concrete Walk (5" Thick) | 428.4 | SQYD | 38.00 | 16,279.20 | 53.00 | 22,705.20 | 56.25 | 24,097.50 | 59.00 | 25,275.60 |
| 0009 | 706-02-00200 | Concrete Drive (6" Thick) | 51.7 | SQYD | 60.00 | 3,102.00 | 63.50 | 3,282.95 | 83.50 | 4,316.95 | 78.00 | 4,032.60 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 1,950.00 | 1,950.00 | 7,667.00 | 7,667.00 | 2,500.00 | 2,500.00 | 9,500.00 | 9,500.00 |
| 0011 | 726-01-00100 | Bedding Material | 19.5 | CUYD | 133.00 | 2,593.50 | 120.00 | 2,340.00 | 100.00 | 1,950.00 | 85.00 | 1,657.50 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 7,100.00 | 7,100.00 | 11,910.00 | 11,910.00 | 12,000.00 | 12,000.00 | 12,500.00 | 12,500.00 |
| 0013 | 729-01-00100 | Sign (Type A) | 77 | SQFT | 22.00 | 1,694.00 | 21.00 | 1,617.00 | 21.00 | 1,617.00 | 10.00 | 770.00 |
| 0014 | 729-21-00100 | U-Channel Post | 7 | EACH | 78.00 | 546.00 | 70.00 | 490.00 | 69.00 | 483.00 | 35.00 | 245.00 |
| 0015 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 112.5 | LNFT | 32.00 | 3,600.00 | 30.00 | 3,375.00 | 30.00 | 3,375.00 | 40.00 | 4,500.00 |
| 0016 | 739-01-00100 | Hydro-Seeding | 0.04 | ACRE | 25,000.00 | 1,000.00 | 32,576.00 | 1,303.04 | 28,750.00 | 1,150.00 | 2,950.00 | 118.00 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 1,000.00 | 1,000.00 | 1,800.00 | 1,800.00 | 8,500.00 | 8,500.00 |
| 0018 | NS-ENH-02040 | Bike Racks Double Sided Galvanized (20 Capacity) | 1 | EACH | 1,500.00 | 1,500.00 | 2,460.00 | 2,460.00 | 1,500.00 | 1,500.00 | 6,800.00 | 6,800.00 |
| CONTRACTOR TOTAL | 61,117.70 | 93,920.00 | 96,134.45 | 107,443.70 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Progressive Construction Co., LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 7,000.00 | 7,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 46 | SQYD | 39.00 | 1,794.00 |
| 0003 | 202-03-38000 | Relocation of Sign Move signs as directed | 3 | EACH | 665.00 | 1,995.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 4,850.00 | 4,850.00 |
| 0005 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 224 | LNFT | 32.00 | 7,168.00 |
| 0006 | 701-07-00300 | Yard Drain Pipe (8") | 9 | LNFT | 21.00 | 189.00 |
| 0007 | 702-03-00100 | Catch Basins (CB-01) | 4 | EACH | 4,270.00 | 17,080.00 |
| 0008 | 706-01-00200 | Concrete Walk (5" Thick) | 428.4 | SQYD | 85.00 | 36,414.00 |
| 0009 | 706-02-00200 | Concrete Drive (6" Thick) | 51.7 | SQYD | 110.00 | 5,687.00 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,700.00 | 5,700.00 |
| 0011 | 726-01-00100 | Bedding Material | 19.5 | CUYD | 100.00 | 1,950.00 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000.00 | 10,000.00 |
| 0013 | 729-01-00100 | Sign (Type A) | 77 | SQFT | 19.50 | 1,501.50 |
| 0014 | 729-21-00100 | U-Channel Post | 7 | EACH | 125.50 | 878.50 |
| 0015 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 112.5 | LNFT | 52.50 | 5,906.25 |
| 0016 | 739-01-00100 | Hydro-Seeding | 0.04 | ACRE | 23,530.00 | 941.20 |
| 0017 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,900.00 | 1,900.00 |
| 0018 | NS-ENH-02040 | Bike Racks Double Sided Galvanized (20 Capacity) | 1 | EACH | 1,200.00 | 1,200.00 |