Bid Tabulations
Letting of
03/14/2012
LA DOTD Headquarters
| Lead Project: H.007235.6 | |
| Parish: Lafourche | |
| Routes: | |
| Description: LOCKPORT SIDEWALK PROJECT | |
| Type Const: Clearing and Grubbing, Drainage Structures, Portland Cement Concrete Sidewalks and related work. | |
| Estimated Construction Cost: $162,116.80 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34263 | La Contracting Enterprises Llc | $122,871.30 |
| 2 | 45861 | American Contractor & Technology Inc | $127,334.80 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $150,323.70 |
| 4 | 52550 | Gibbs & Register Inc. | $163,265.40 |
| 5 | 38590 | J.C. Patin Group, LLC | $194,214.28 |
| 6 | 06276 | Barriere Construction Co., LLC | $197,964.91 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - La Contracting Enterprises Llc |
- 2 - American Contractor & Technology Inc |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Gibbs & Register Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,000.00 | 2,000.00 | 7,500.00 | 7,500.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 349 | SQYD | 10.00 | 3,490.00 | 18.00 | 6,282.00 | 7.00 | 2,443.00 | 20.00 | 6,980.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 9,000.00 | 9,000.00 | 7,500.00 | 7,500.00 | 16,000.00 | 16,000.00 | 20,000.00 | 20,000.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 6 | EACH | 7.50 | 45.00 | 75.00 | 450.00 | 25.00 | 150.00 | 350.00 | 2,100.00 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 250.00 | 500.00 | 500.00 | 1,000.00 | 100.00 | 200.00 | 500.00 | 1,000.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 215 | LNFT | 5.00 | 1,075.00 | 4.00 | 860.00 | 3.00 | 645.00 | 10.00 | 2,150.00 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 50 | CUYD | 68.00 | 3,400.00 | 50.00 | 2,500.00 | 75.00 | 3,750.00 | 85.00 | 4,250.00 |
| 0008 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 580 | LNFT | 25.00 | 14,500.00 | 15.00 | 8,700.00 | 23.00 | 13,340.00 | 30.00 | 17,400.00 |
| 0009 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 13 | LNFT | 33.00 | 429.00 | 13.00 | 169.00 | 21.50 | 279.50 | 25.00 | 325.00 |
| 0010 | 701-07-00400 | Yard Drain Pipe (10") | 21 | LNFT | 14.00 | 294.00 | 12.00 | 252.00 | 16.00 | 336.00 | 20.00 | 420.00 |
| 0011 | 701-15-00100 | Concrete Collar | 3 | EACH | 300.00 | 900.00 | 750.00 | 2,250.00 | 300.00 | 900.00 | 350.00 | 1,050.00 |
| 0012 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 1,900.00 | 20,900.00 | 3,000.00 | 33,000.00 | 1,800.00 | 19,800.00 | 2,500.00 | 27,500.00 |
| 0013 | 706-01-00300 | Concrete Walk (6" Thick) | 27.2 | SQYD | 45.00 | 1,224.00 | 45.00 | 1,224.00 | 68.00 | 1,849.60 | 45.00 | 1,224.00 |
| 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 99.8 | SQYD | 47.00 | 4,690.60 | 45.00 | 4,491.00 | 60.00 | 5,988.00 | 45.00 | 4,491.00 |
| 0015 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 500.00 | 500.00 | 1,500.00 | 1,500.00 | 875.00 | 875.00 | 1,000.00 | 1,000.00 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,500.00 | 3,500.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 7,500.00 | 7,500.00 |
| 0017 | 726-01-00100 | Bedding Material | 52.6 | CUYD | 88.00 | 4,628.80 | 25.00 | 1,315.00 | 75.00 | 3,945.00 | 65.00 | 3,419.00 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 3,000.00 | 3,000.00 | 9,000.00 | 9,000.00 | 3,900.00 | 3,900.00 | 15,000.00 | 15,000.00 |
| 0019 | 739-01-00100 | Hydro-Seeding | 0.16 | ACRE | 9,000.00 | 1,440.00 | 10,000.00 | 1,600.00 | 2,500.00 | 400.00 | 13,500.00 | 2,160.00 |
| 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 |
| 0021 | NS-ENH-03081 | Concrete (Decorative Surface Treatment) Stamped Brick | 503.9 | SQYD | 91.00 | 45,854.90 | 62.00 | 31,241.80 | 134.00 | 67,522.60 | 76.00 | 38,296.40 |
| CONTRACTOR TOTAL | 122,871.30 | 127,334.80 | 150,323.70 | 163,265.40 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - J.C. Patin Group, LLC |
- 6 - Barriere Construction Co., LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,498.00 | 10,498.00 | 13,500.00 | 13,500.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 349 | SQYD | 14.00 | 4,886.00 | 14.00 | 4,886.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 5,157.00 | 5,157.00 | 27,500.00 | 27,500.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 6 | EACH | 41.00 | 246.00 | 25.00 | 150.00 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 328.00 | 656.00 | 200.00 | 400.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 215 | LNFT | 4.00 | 860.00 | 4.00 | 860.00 |
| 0007 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 50 | CUYD | 92.00 | 4,600.00 | 66.00 | 3,300.00 |
| 0008 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 580 | LNFT | 26.00 | 15,080.00 | 51.50 | 29,870.00 |
| 0009 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 13 | LNFT | 54.00 | 702.00 | 57.00 | 741.00 |
| 0010 | 701-07-00400 | Yard Drain Pipe (10") | 21 | LNFT | 81.00 | 1,701.00 | 57.00 | 1,197.00 |
| 0011 | 701-15-00100 | Concrete Collar | 3 | EACH | 957.00 | 2,871.00 | 975.00 | 2,925.00 |
| 0012 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 2,403.00 | 26,433.00 | 2,000.00 | 22,000.00 |
| 0013 | 706-01-00300 | Concrete Walk (6" Thick) | 27.2 | SQYD | 46.00 | 1,251.20 | 108.75 | 2,958.00 |
| 0014 | 706-02-00200 | Concrete Drive (6" Thick) | 99.8 | SQYD | 44.00 | 4,391.20 | 62.45 | 6,232.51 |
| 0015 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 1,140.00 | 1,140.00 | 1,045.00 | 1,045.00 |
| 0016 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 12,424.00 | 12,424.00 | 7,500.00 | 7,500.00 |
| 0017 | 726-01-00100 | Bedding Material | 52.6 | CUYD | 81.00 | 4,260.60 | 53.00 | 2,787.80 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 56,034.00 | 56,034.00 | 10,500.00 | 10,500.00 |
| 0019 | 739-01-00100 | Hydro-Seeding | 0.16 | ACRE | 12,288.00 | 1,966.08 | 1,050.00 | 168.00 |
| 0020 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,831.00 | 9,831.00 | 2,000.00 | 2,000.00 |
| 0021 | NS-ENH-03081 | Concrete (Decorative Surface Treatment) Stamped Brick | 503.9 | SQYD | 58.00 | 29,226.20 | 114.00 | 57,444.60 |
| CONTRACTOR TOTAL | 194,214.28 | 197,964.91 | ||||||