LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.007219.6
Parish: Jefferson
Routes:
Description: MANHATTAN BOULEVARD (GRETNA - US 90B) OVERLAY
Type Const: COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK
Estimated Construction Cost: $2,167,508.14


RankLicenseBidderConstruction Bid
1 02179 Boh Bros. Construction Co., LLC. $2,516,190.33
2 06276 Barriere Construction Co., LLC $2,572,583.14


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Boh Bros. Construction Co., LLC.
- 2 -
Barriere Construction Co., LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06080 Removal of Concrete Combination Curb and Gutter 38      LNFT 15.00 570.00 19.00 722.00
0002 202-02-06100 Removal of Concrete Walks and Drives 15.6    SQYD 15.00 234.00 32.00 499.20
0003 202-02-06140 Removal of Curbs (Concrete) 17      LNFT 15.00 255.00 20.00 340.00
0004 202-02-32500 Removal of Portland Cement Concrete Pavement 137      SQYD 20.00 2,740.00 30.00 4,110.00
0005 203-08-00100 Geotextile Fabric 160      SQYD 1.00 160.00 25.00 4,000.00
0006 204-02-00100 Temporary Hay or Straw Bales 420      EACH 15.00 6,300.00 10.00 4,200.00
0007 204-06-00100 Temporary Silt Fencing 2,600      LNFT 1.80 4,680.00 1.00 2,600.00
0008 502-01-00100 Superpave Asphaltic Concrete 8,989.7    TON 115.00 1,033,815.50 118.00 1,060,784.60
0009 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 311.4    TON 115.00 35,811.00 165.00 51,381.00
0010 509-01-00100 Cold Planing Asphaltic Pavement 45,633      SQYD 6.50 296,614.50 5.00 228,165.00
0011 510-01-00200 Pavement Patching (12" Minimum Thickness) 1,101.3    SQYD 130.00 143,169.00 80.00 88,104.00
0012 702-04-00100 Adjusting Manholes 19      EACH 1,000.00 19,000.00 2,000.00 38,000.00
0013 702-04-00200 Adjusting Catch Basins 11      EACH 1,500.00 16,500.00 3,500.00 38,500.00
0014 706-01-00200 Concrete Walk (5" Thick) 356.4    SQYD 98.00 34,927.20 90.00 32,076.00
0015 706-03-00200 Incidental Concrete Paving (5" Thick) 137      SQYD 98.00 13,426.00 85.00 11,645.00
0016 706-04-00100 Handicapped Curb Ramps 8      EACH 2,400.00 19,200.00 3,500.00 28,000.00
0017 707-01-00200 Concrete Curb (Barrier) 345      LNFT 26.00 8,970.00 25.00 8,625.00
0018 707-03-00100 Combination Concrete Curb and Gutter 38      LNFT 55.00 2,090.00 40.00 1,520.00
0019 713-01-00100 Temporary Signs and Barricades 1      LUMP 150,000.00 150,000.00 230,000.00 230,000.00
0020 713-02-00100 Temporary Pavement Markings (4" Width) 16,896      LNFT 0.13 2,196.48 0.19 3,210.24
0021 713-02-00300 Temporary Pavement Markings (8" Width) 2,640      LNFT 0.22 580.80 0.35 924.00
0022 713-02-00500 Temporary Pavement Markings (24" Width) 580      LNFT 0.75 435.00 0.75 435.00
0023 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 2.8    MILE 300.00 840.00 650.00 1,820.00
0024 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 11      EACH 10.00 110.00 25.00 275.00
0025 713-05-00200 Temporary Pavement Legends & Symbols (Double Arrow) 7      EACH 55.00 385.00 33.00 231.00
0026 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 11      EACH 15.00 165.00 41.00 451.00
0027 714-01-00100 Slab Sodding (Bermuda Grass) 80      SQYD 30.00 2,400.00 32.00 2,560.00
0028 722-02-00100 Project Site Laboratory (Equipped) 1      EACH 5,000.00 5,000.00 6,000.00 6,000.00
0029 727-01-00100 Mobilization 1      LUMP 250,000.00 250,000.00 240,000.00 240,000.00
0030 731-02-00100 Reflectorized Raised Pavement Markers 770      EACH 5.50 4,235.00 6.00 4,620.00
0031 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 517      LNFT 5.25 2,714.25 5.00 2,585.00
0032 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 3.6    MILE 3,400.00 12,240.00 2,900.00 10,440.00
0033 732-02-02040 Plastic Pavement Striping (Solid Line) (8" Width) (Thermoplastic 90 mil) 0.5    MILE 7,900.00 3,950.00 5,005.00 2,502.50
0034 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 2.9    MILE 1,050.00 3,045.00 750.00 2,175.00
0035 732-04-01020 Plastic Pavement Legends and Symbols (Arrow - Straight) 4      EACH 215.00 860.00 230.00 920.00
0036 732-04-01040 Plastic Pavement Legends and Symbols (Arrow - Double) 8      EACH 280.00 2,240.00 251.00 2,008.00
0037 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 1      EACH 2,250.00 2,250.00 225.00 225.00
0038 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 6      EACH 2,250.00 13,500.00 230.00 1,380.00
0039 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 11      EACH 240.00 2,640.00 305.00 3,355.00
0040 736-09-00100 Loop Detector 6,500      LNFT 14.00 91,000.00 15.00 97,500.00
0041 740-01-00100 Construction Layout 1      LUMP 9,000.00 9,000.00 20,000.00 20,000.00
0042 NS-500-00180 Roadway Reinforcing Mesh (Complete Road System) 35,798      SQYD 8.00 286,384.00 9.00 322,182.00
0043 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 11,832      INLF 0.55 6,507.60 0.55 6,507.60
0044 NS-700-00140 Flexible Post Traffic Delineators 15      EACH 70.00 1,050.00 67.00 1,005.00
0045 NS-P26-04020 Cleaning and Sealing Random Cracks in Asphaltic Concrete Pavement 12,000      LF 2.00 24,000.00 0.50 6,000.00
                 
    CONTRACTOR TOTAL       2,516,190.33   2,572,583.14