Bid Tabulations
Letting of
03/13/2013
LA DOTD Headquarters
| Lead Project: H.007213.6 | |
| Parish: Jefferson | |
| Routes: VETERANS BOULEVARD | |
| Description: Veterans Blvd Overlay Phase I (Sharon St to Salem St) | |
| Type Const: GRADING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $427,745.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $458,251.56 |
| 2 | 02179 | Boh Bros. Construction Co., LLC. | $473,151.91 |
| 3 | 00935 | Fleming Construction Co., LLC | $492,514.56 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Boh Bros. Construction Co., LLC. |
- 3 - Fleming Construction Co., LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | 361.2 | SQYD | 80.00 | 28,896.00 | 10.00 | 3,612.00 | 20.00 | 7,224.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 354.5 | LNFT | 6.00 | 2,127.00 | 5.00 | 1,772.50 | 5.00 | 1,772.50 |
| 0003 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 1,023 | SQYD | 6.00 | 6,138.00 | 12.00 | 12,276.00 | 15.00 | 15,345.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 14,500.00 | 14,500.00 | 20,000.00 | 20,000.00 |
| 0005 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 25.00 | 2,500.00 | 15.00 | 1,500.00 | 20.00 | 2,000.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 1,365 | TON | 115.00 | 156,975.00 | 110.00 | 150,150.00 | 135.00 | 184,275.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 632.4 | TON | 150.00 | 94,860.00 | 110.00 | 69,564.00 | 150.00 | 94,860.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 5,320 | SQYD | 2.75 | 14,630.00 | 3.00 | 15,960.00 | 5.00 | 26,600.00 |
| 0009 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 250 | SQYD | 30.00 | 7,500.00 | 100.00 | 25,000.00 | 100.00 | 25,000.00 |
| 0010 | 707-03-00100 | Combination Concrete Curb and Gutter (MOUNTABLE) | 255 | LNFT | 33.00 | 8,415.00 | 50.00 | 12,750.00 | 40.00 | 10,200.00 |
| 0011 | 707-03-00100 | Combination Concrete Curb and Gutter (BARRIER) | 394 | LNFT | 33.00 | 13,002.00 | 50.00 | 19,700.00 | 40.00 | 15,760.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 65,000.00 | 65,000.00 | 30,000.00 | 30,000.00 |
| 0013 | 713-02-00100 | Temporary Pavement Markings (4" Width) | 9,345.6 | LNFT | 0.10 | 934.56 | 0.10 | 934.56 | 0.10 | 934.56 |
| 0014 | 716-01-00200 | Mulch (Fiber) | 5.2 | TON | 300.00 | 1,560.00 | 800.00 | 4,160.00 | 350.00 | 1,820.00 |
| 0015 | 717-01-00100 | Seeding | 100 | LB | 10.00 | 1,000.00 | 15.00 | 1,500.00 | 10.00 | 1,000.00 |
| 0016 | 718-01-00100 | Fertilizer | 200 | LB | 10.00 | 2,000.00 | 6.00 | 1,200.00 | 1.00 | 200.00 |
| 0017 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 | 2,000.00 | 2,000.00 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 46,000.00 | 46,000.00 | 47,000.00 | 47,000.00 | 30,000.00 | 30,000.00 |
| 0019 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 107.5 | SQFT | 25.00 | 2,687.50 | 20.00 | 2,150.00 | 18.00 | 1,935.00 |
| 0020 | 729-21-00100 | U-Channel Post | 17 | EACH | 100.00 | 1,700.00 | 60.00 | 1,020.00 | 55.00 | 935.00 |
| 0021 | 731-02-00100 | Reflectorized Raised Pavement Markers | 63 | EACH | 11.00 | 693.00 | 6.00 | 378.00 | 5.25 | 330.75 |
| 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 120 | LNFT | 13.00 | 1,560.00 | 6.00 | 720.00 | 5.00 | 600.00 |
| 0023 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.863 | MILE | 4,500.00 | 3,883.50 | 3,700.00 | 3,193.10 | 3,500.00 | 3,020.50 |
| 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 9,000.00 | 9,000.00 | 8,000.00 | 8,000.00 | 6,000.00 | 6,000.00 |
| 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,095 | INLF | 2.00 | 4,190.00 | 0.65 | 1,361.75 | 0.55 | 1,152.25 |
| 0026 | NS-500-00360 | Saw Cutting Asphaltic Concrete Pavement Over Portland Cement Concrete Composite Pavement | 500 | INLF | 2.00 | 1,000.00 | 1.50 | 750.00 | 1.10 | 550.00 |
| 0027 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 1,500.00 | 3,000.00 | 3,000.00 | 6,000.00 | 4,500.00 | 9,000.00 |
| CONTRACTOR TOTAL | 458,251.56 | 473,151.91 | 492,514.56 | |||||||