Bid Tabulations
Letting of
07/24/2013
LA DOTD Headquarters
| Lead Project: H.007116.6 | |
| Parish: Calcasieu | |
| Routes: | |
| Description: SALE ROAD BRIDGE | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $4,997,399.43 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $5,084,841.31 |
| 2 | 39462 | Jb James Construction Llc | $5,181,752.98 |
| 3 | 14648 | Mcmanus Construction, LLC | $5,892,286.30 |
| 4 | 00481 | Coastal Bridge Co., L.L.C. | $6,588,672.40 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Jb James Construction Llc |
- 3 - Mcmanus Construction, LLC |
- 4 - Coastal Bridge Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 280,000.00 | 280,000.00 | 150,000.00 | 150,000.00 | 85,000.00 | 85,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 55,000.00 | 55,000.00 | 30,000.00 | 30,000.00 | 55,000.00 | 55,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STA. 108+58.08; 34.50'x56.85' CONCRETE SLAB SPAN W/ASPHALT OVERLAY & TREATED TIMBER PILES | 1 | EACH | 20,000.00 | 20,000.00 | 16,000.00 | 16,000.00 | 19,800.00 | 19,800.00 | 125,000.00 | 125,000.00 |
| 0004 | 202-02-06060 | Removal of Concrete Catch Basin | 9 | EACH | 200.00 | 1,800.00 | 400.00 | 3,600.00 | 500.00 | 4,500.00 | 550.00 | 4,950.00 |
| 0005 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 100 | LNFT | 10.00 | 1,000.00 | 7.00 | 700.00 | 20.00 | 2,000.00 | 22.00 | 2,200.00 |
| 0006 | 202-02-06100 | Removal of Concrete Walks and Drives | 184 | SQYD | 4.00 | 736.00 | 12.00 | 2,208.00 | 20.00 | 3,680.00 | 22.00 | 4,048.00 |
| 0007 | 202-02-14500 | Removal of Guard Rail | 314 | LNFT | 8.00 | 2,512.00 | 5.00 | 1,570.00 | 8.00 | 2,512.00 | 9.00 | 2,826.00 |
| 0008 | 202-02-26000 | Removal of Manholes | 5 | EACH | 200.00 | 1,000.00 | 400.00 | 2,000.00 | 2,000.00 | 10,000.00 | 2,250.00 | 11,250.00 |
| 0009 | 202-02-32120 | Removal of Pipe (Side Drain) SEE PLANS | 138 | LNFT | 14.00 | 1,932.00 | 10.00 | 1,380.00 | 20.00 | 2,760.00 | 22.00 | 3,036.00 |
| 0010 | 202-02-32140 | Removal of Pipe (Storm Drain) SEE PLANS | 578 | LNFT | 8.00 | 4,624.00 | 10.00 | 5,780.00 | 20.00 | 11,560.00 | 22.00 | 12,716.00 |
| 0011 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 946.4 | SQYD | 8.50 | 8,044.40 | 10.00 | 9,464.00 | 12.00 | 11,356.80 | 14.00 | 13,249.60 |
| 0012 | 202-02-38500 | Removal of Surfacing and Stablized Base | 5,548.4 | SQYD | 8.50 | 47,161.40 | 4.20 | 23,303.28 | 10.00 | 55,484.00 | 11.00 | 61,032.40 |
| 0013 | 202-02-40100 | Removal of Traffic Signal Equipment | 1 | LUMP | 3,500.00 | 3,500.00 | 3,200.00 | 3,200.00 | 4,100.00 | 4,100.00 | 3,500.00 | 3,500.00 |
| 0014 | 203-02-00100 | Drainage Excavation | 1,265 | CUYD | 11.00 | 13,915.00 | 9.00 | 11,385.00 | 12.00 | 15,180.00 | 18.00 | 22,770.00 |
| 0015 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 200,000.00 | 200,000.00 | 150,000.00 | 150,000.00 | 240,000.00 | 240,000.00 | 270,000.00 | 270,000.00 |
| 0016 | 204-02-00100 | Temporary Hay or Straw Bales | 217 | EACH | 15.00 | 3,255.00 | 10.00 | 2,170.00 | 25.00 | 5,425.00 | 17.00 | 3,689.00 |
| 0017 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 10 | EACH | 175.00 | 1,750.00 | 100.00 | 1,000.00 | 140.00 | 1,400.00 | 140.00 | 1,400.00 |
| 0018 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 5 | EACH | 375.00 | 1,875.00 | 800.00 | 4,000.00 | 2,000.00 | 10,000.00 | 350.00 | 1,750.00 |
| 0019 | 204-06-00100 | Temporary Silt Fencing | 4,056 | LNFT | 1.60 | 6,489.60 | 2.25 | 9,126.00 | 4.00 | 16,224.00 | 2.25 | 9,126.00 |
| 0020 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 1,500.00 | 3,000.00 | 2,600.00 | 5,200.00 | 6,000.00 | 12,000.00 | 6,500.00 | 13,000.00 |
| 0021 | 302-02-03121 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 11,946.7 | SQYD | 16.80 | 200,704.56 | 20.00 | 238,934.00 | 22.00 | 262,827.40 | 25.00 | 298,667.50 |
| 0022 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 11,946.7 | SQYD | 12.00 | 143,360.40 | 11.00 | 131,413.70 | 12.00 | 143,360.40 | 13.50 | 161,280.45 |
| 0023 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 500 | CUYD | 15.00 | 7,500.00 | 65.00 | 32,500.00 | 85.00 | 42,500.00 | 96.00 | 48,000.00 |
| 0024 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 43 | TON | 200.00 | 8,600.00 | 175.00 | 7,525.00 | 200.00 | 8,600.00 | 225.00 | 9,675.00 |
| 0025 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 10,600.6 | SQYD | 47.00 | 498,228.20 | 52.00 | 551,231.20 | 74.00 | 784,444.40 | 83.50 | 885,150.10 |
| 0026 | 601-02-00700 | Portland Cement Concrete Pavement (8" Thick) (Crossovers & Turnouts) | 872.5 | SQYD | 87.00 | 75,907.50 | 60.00 | 52,350.00 | 76.00 | 66,310.00 | 86.00 | 75,035.00 |
| 0027 | 601-04-00100 | Portland Cement Concrete Pavement Coring | 20 | EACH | 75.00 | 1,500.00 | 120.00 | 2,400.00 | 150.00 | 3,000.00 | 140.00 | 2,800.00 |
| 0028 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 1,950 | LNFT | 48.00 | 93,600.00 | 55.00 | 107,250.00 | 55.00 | 107,250.00 | 62.00 | 120,900.00 |
| 0029 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 8 | LNFT | 150.00 | 1,200.00 | 78.00 | 624.00 | 100.00 | 800.00 | 113.00 | 904.00 |
| 0030 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 506 | LNFT | 65.00 | 32,890.00 | 80.00 | 40,480.00 | 65.00 | 32,890.00 | 73.50 | 37,191.00 |
| 0031 | 701-03-02020 | Storm Drain Pipe (Outfall) (18" PP or 24" CMP) | 6 | LNFT | 190.00 | 1,140.00 | 95.00 | 570.00 | 200.00 | 1,200.00 | 225.00 | 1,350.00 |
| 0032 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 6 | LNFT | 200.00 | 1,200.00 | 100.00 | 600.00 | 200.00 | 1,200.00 | 225.00 | 1,350.00 |
| 0033 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 150.00 | 1,200.00 | 100.00 | 800.00 | 200.00 | 1,600.00 | 225.00 | 1,800.00 |
| 0034 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,500.00 | 1,500.00 | 200.00 | 200.00 | 500.00 | 500.00 | 550.00 | 550.00 |
| 0035 | 702-02-00200 | Manholes (R-CB-11) | 3 | EACH | 7,000.00 | 21,000.00 | 2,800.00 | 8,400.00 | 3,500.00 | 10,500.00 | 4,000.00 | 12,000.00 |
| 0036 | 702-02-00600 | Manholes (R-CB-36) | 9 | EACH | 5,800.00 | 52,200.00 | 2,400.00 | 21,600.00 | 9,520.00 | 85,680.00 | 2,650.00 | 23,850.00 |
| 0037 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 3,400.00 | 10,200.00 | 2,700.00 | 8,100.00 | 3,500.00 | 10,500.00 | 5,650.00 | 16,950.00 |
| 0038 | 702-03-00500 | Catch Basins (CB-06) | 22 | EACH | 4,800.00 | 105,600.00 | 3,400.00 | 74,800.00 | 3,500.00 | 77,000.00 | 4,000.00 | 88,000.00 |
| 0039 | 702-03-00700 | Catch Basins (CB-08) | 6 | EACH | 8,400.00 | 50,400.00 | 6,800.00 | 40,800.00 | 8,000.00 | 48,000.00 | 9,000.00 | 54,000.00 |
| 0040 | 703-01-00100 | Shoulder Underdrain Systems | 3,791 | LNFT | 12.00 | 45,492.00 | 10.00 | 37,910.00 | 20.00 | 75,820.00 | 13.87 | 52,581.17 |
| 0041 | 703-02-00100 | Shoulder Outlet Underdrains | 2 | EACH | 1,200.00 | 2,400.00 | 600.00 | 1,200.00 | 400.00 | 800.00 | 1,350.00 | 2,700.00 |
| 0042 | 703-03-00100 | Perforated Pipe Underdrains | 40 | LNFT | 40.00 | 1,600.00 | 12.00 | 480.00 | 40.00 | 1,600.00 | 13.87 | 554.80 |
| 0043 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 1,543.9 | LNFT | 31.00 | 47,860.90 | 30.00 | 46,317.00 | 68.20 | 105,293.98 | 50.00 | 77,195.00 |
| 0044 | 704-03-00100 | Blocked Out Guard Rail | 12.5 | LNFT | 19.00 | 237.50 | 20.00 | 250.00 | 23.65 | 295.63 | 22.50 | 281.25 |
| 0045 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 12.6 | LNFT | 100.00 | 1,260.00 | 90.00 | 1,134.00 | 115.50 | 1,455.30 | 40.00 | 504.00 |
| 0046 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 150 | LNFT | 75.00 | 11,250.00 | 65.00 | 9,750.00 | 74.80 | 11,220.00 | 56.50 | 8,475.00 |
| 0047 | 704-11-00100 | Guard Rail End Treatment (Flared) | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,310.00 | 2,310.00 | 2,260.00 | 2,260.00 |
| 0048 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 5 | EACH | 2,200.00 | 11,000.00 | 2,100.00 | 10,500.00 | 2,750.00 | 13,750.00 | 2,260.00 | 11,300.00 |
| 0049 | 706-02-00200 | Concrete Drive (6" Thick) | 171 | SQYD | 80.00 | 13,680.00 | 60.00 | 10,260.00 | 55.00 | 9,405.00 | 68.00 | 11,628.00 |
| 0050 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 1,561.7 | SQYD | 63.00 | 98,387.10 | 45.00 | 70,276.50 | 88.00 | 137,429.60 | 58.50 | 91,359.45 |
| 0051 | 707-01-00200 | Concrete Curb (Barrier) | 2,839.4 | LNFT | 11.00 | 31,233.40 | 5.00 | 14,197.00 | 12.00 | 34,072.80 | 13.50 | 38,331.90 |
| 0052 | 707-01-00300 | Concrete Curb (Mountable) | 1,148.6 | LNFT | 11.00 | 12,634.60 | 2.60 | 2,986.36 | 12.00 | 13,783.20 | 13.50 | 15,506.10 |
| 0053 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 20 | SQYD | 115.00 | 2,300.00 | 180.00 | 3,600.00 | 200.00 | 4,000.00 | 225.00 | 4,500.00 |
| 0054 | 711-04-00100 | Geotextile Fabric | 20 | SQYD | 15.00 | 300.00 | 7.00 | 140.00 | 10.00 | 200.00 | 11.00 | 220.00 |
| 0055 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 32,000.00 | 32,000.00 | 60,000.00 | 60,000.00 | 30,000.00 | 30,000.00 | 95,000.00 | 95,000.00 |
| 0056 | 713-03-01020 | Temporary Pavement Markings (Broken Line) (4" W) (4' L) (Type 1 Removable) | 0.5 | MILE | 3,200.00 | 1,600.00 | 4,000.00 | 2,000.00 | 8,250.00 | 4,125.00 | 3,400.00 | 1,700.00 |
| 0057 | 713-04-01020 | Temporary Pavement Markings (Solid Line) (4"Width) (Type 1 Removable) | 0.5 | MILE | 11,200.00 | 5,600.00 | 15,000.00 | 7,500.00 | 16,500.00 | 8,250.00 | 11,300.00 | 5,650.00 |
| 0058 | 716-01-00100 | Mulch (Vegetative) | 3.2 | TON | 600.00 | 1,920.00 | 550.00 | 1,760.00 | 1,705.00 | 5,456.00 | 500.00 | 1,600.00 |
| 0059 | 717-01-00100 | Seeding | 96 | LB | 9.00 | 864.00 | 11.00 | 1,056.00 | 15.84 | 1,520.64 | 13.00 | 1,248.00 |
| 0060 | 718-01-00100 | Fertilizer | 1,600 | LB | 0.65 | 1,040.00 | 0.60 | 960.00 | 0.85 | 1,360.00 | 1.25 | 2,000.00 |
| 0061 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 | 18,500.00 | 18,500.00 |
| 0062 | 726-01-00100 | Bedding Material | 362.8 | CUYD | 90.00 | 32,652.00 | 65.00 | 23,582.00 | 90.00 | 32,652.00 | 102.00 | 37,005.60 |
| 0063 | 727-01-00100 | Mobilization | 1 | LUMP | 500,000.00 | 500,000.00 | 500,000.00 | 500,000.00 | 193,500.00 | 193,500.00 | 500,000.00 | 500,000.00 |
| 0064 | 729-07-00102 | Sign (Overlay Panel)(Furnish and Install) | 9 | SQFT | 115.00 | 1,035.00 | 50.00 | 450.00 | 150.00 | 1,350.00 | 85.00 | 765.00 |
| 0065 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 85.00 | 1,020.00 | 80.00 | 960.00 | 200.00 | 2,400.00 | 73.50 | 882.00 |
| 0066 | 730-01-00100 | Trenching and Backfilling | 41 | LNFT | 9.25 | 379.25 | 8.00 | 328.00 | 20.00 | 820.00 | 9.00 | 369.00 |
| 0067 | 731-02-00100 | Reflectorized Raised Pavement Markers | 139 | EACH | 8.15 | 1,132.85 | 5.00 | 695.00 | 6.60 | 917.40 | 8.00 | 1,112.00 |
| 0068 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 125 | LNFT | 4.60 | 575.00 | 1.00 | 125.00 | 2.20 | 275.00 | 4.50 | 562.50 |
| 0069 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 80 | LNFT | 17.50 | 1,400.00 | 4.00 | 320.00 | 6.60 | 528.00 | 17.00 | 1,360.00 |
| 0070 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.484 | MILE | 4,000.00 | 5,936.00 | 3,000.00 | 4,452.00 | 4,400.00 | 6,529.60 | 3,950.00 | 5,861.80 |
| 0071 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.528 | MILE | 1,300.00 | 686.40 | 1,100.00 | 580.80 | 1,650.00 | 871.20 | 1,335.00 | 704.88 |
| 0072 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 1 | EACH | 400.00 | 400.00 | 200.00 | 200.00 | 330.00 | 330.00 | 400.00 | 400.00 |
| 0073 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 7 | EACH | 285.00 | 1,995.00 | 200.00 | 1,400.00 | 220.00 | 1,540.00 | 280.00 | 1,960.00 |
| 0074 | 735-01-00100 | Mailboxes | 2 | EACH | 100.00 | 200.00 | 1.00 | 2.00 | 100.00 | 200.00 | 30.00 | 60.00 |
| 0075 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 120.00 | 240.00 | 200.00 | 400.00 | 300.00 | 600.00 | 90.00 | 180.00 |
| 0076 | 736-04-04060 | Signal Support (20' Single Mast Arm) | 1 | EACH | 9,200.00 | 9,200.00 | 8,200.00 | 8,200.00 | 15,880.00 | 15,880.00 | 9,000.00 | 9,000.00 |
| 0077 | 736-04-04180 | Signal Support (50' Single Mast Arm) | 1 | EACH | 15,000.00 | 15,000.00 | 14,000.00 | 14,000.00 | 18,630.00 | 18,630.00 | 14,750.00 | 14,750.00 |
| 0078 | 736-05-02000 | Signal Heads (3 Section, 12" Led Lens, R, Y, G) | 2 | EACH | 1,300.00 | 2,600.00 | 1,200.00 | 2,400.00 | 1,005.00 | 2,010.00 | 1,325.00 | 2,650.00 |
| 0079 | 736-05-04000 | Signal Heads (5 Section, 12" Led Lens, R, LT. Y, Y, LT. G, G) | 2 | EACH | 2,000.00 | 4,000.00 | 1,800.00 | 3,600.00 | 1,580.00 | 3,160.00 | 1,950.00 | 3,900.00 |
| 0080 | 736-10-00200 | Underground Junction Box (Type E) | 2 | EACH | 520.00 | 1,040.00 | 500.00 | 1,000.00 | 830.00 | 1,660.00 | 500.00 | 1,000.00 |
| 0081 | 736-11-00400 | Conduit (3" HDPE, Schedule 80) | 41 | LNFT | 10.00 | 410.00 | 8.00 | 328.00 | 8.80 | 360.80 | 9.00 | 369.00 |
| 0082 | 736-12-04000 | Conductor (6c, #14 awg) | 284 | LNFT | 2.00 | 568.00 | 2.00 | 568.00 | 3.30 | 937.20 | 2.00 | 568.00 |
| 0083 | 736-12-06000 | Conductor (10c, #14 awg) | 339 | LNFT | 2.50 | 847.50 | 2.30 | 779.70 | 5.50 | 1,864.50 | 2.50 | 847.50 |
| 0084 | 736-12-08000 | Conductor (Video Surevillance) | 438 | LNFT | 3.30 | 1,445.40 | 3.00 | 1,314.00 | 3.30 | 1,445.40 | 3.25 | 1,423.50 |
| 0085 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 75,000.00 | 75,000.00 | 15,000.00 | 15,000.00 | 65,000.00 | 65,000.00 |
| 0086 | 742-01-00400 | Sanitary Sewer Pipe (8") | 939 | LNFT | 110.00 | 103,290.00 | 44.00 | 41,316.00 | 39.20 | 36,808.80 | 56.50 | 53,053.50 |
| 0087 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 3 | EACH | 1,600.00 | 4,800.00 | 550.00 | 1,650.00 | 2,324.00 | 6,972.00 | 565.00 | 1,695.00 |
| 0088 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 170 | LNFT | 65.00 | 11,050.00 | 30.00 | 5,100.00 | 100.00 | 17,000.00 | 28.25 | 4,802.50 |
| 0089 | 803-03-00100 | Steel Sheet Pile Wall | 44,540 | SQFT | 38.00 | 1,692,520.00 | 35.00 | 1,558,900.00 | 40.53 | 1,805,206.20 | 44.00 | 1,959,760.00 |
| 0090 | 804-01-00600 | Precast Concrete Piles (24") | 2,800 | LNFT | 90.00 | 252,000.00 | 90.00 | 252,000.00 | 121.00 | 338,800.00 | 110.00 | 308,000.00 |
| 0091 | 804-17-00100 | Dynamic Monitoring | 2 | EACH | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,375.00 | 2,750.00 | 2,500.00 | 5,000.00 |
| 0092 | 805-01-00700 | Class A Concrete (Bents) | 118.49 | CUYD | 725.00 | 85,905.25 | 880.00 | 104,271.20 | 1,155.00 | 136,855.95 | 1,400.00 | 165,886.00 |
| 0093 | 805-04-00100 | Class AA(M) Concrete | 288.6 | CUYD | 550.00 | 158,730.00 | 600.00 | 173,160.00 | 825.00 | 238,095.00 | 900.00 | 259,740.00 |
| 0094 | 806-01-00100 | Deformed Reinforcing Steel | 80,712 | LB | 0.80 | 64,569.60 | 0.92 | 74,255.04 | 1.10 | 88,783.20 | 0.95 | 76,676.40 |
| 0095 | 810-01-00100 | Concrete Railing (Standard Barrier) | 240 | LNFT | 62.00 | 14,880.00 | 75.00 | 18,000.00 | 88.00 | 21,120.00 | 65.00 | 15,600.00 |
| 0096 | 813-01-00100 | Concrete Approach Slabs | 253.4 | SQYD | 205.00 | 51,947.00 | 220.00 | 55,748.00 | 258.50 | 65,503.90 | 200.00 | 50,680.00 |
| 0097 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 800 | INLF | 2.25 | 1,800.00 | 0.84 | 672.00 | 2.00 | 1,600.00 | 1.15 | 920.00 |
| 0098 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,835 | INLF | 1.50 | 2,752.50 | 1.12 | 2,055.20 | 3.00 | 5,505.00 | 1.50 | 2,752.50 |
| 0099 | NS-700-00240 | Special Guard Rail Anchor Section | 2 | EACH | 1,200.00 | 2,400.00 | 2,500.00 | 5,000.00 | 1,705.00 | 3,410.00 | 1,130.00 | 2,260.00 |
| 0100 | NS-736-00005 | Video Detection Cabinet Components | 1 | EACH | 9,000.00 | 9,000.00 | 8,000.00 | 8,000.00 | 13,653.00 | 13,653.00 | 8,750.00 | 8,750.00 |
| 0101 | NS-736-00006 | Video Detection Camera | 4 | EACH | 2,300.00 | 9,200.00 | 2,000.00 | 8,000.00 | 2,324.00 | 9,296.00 | 2,250.00 | 9,000.00 |
| 0102 | NS-804-00001 | Vibration Monitoring | 35 | EACH | 230.00 | 8,050.00 | 400.00 | 14,000.00 | 605.00 | 21,175.00 | 625.00 | 21,875.00 |
| 0103 | NS-MSC-00120 | Drainage Structure PG-DRAIN01 - PAVED GUTTER DRAIN | 1 | EACH | 7,000.00 | 7,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 3,400.00 | 3,400.00 |
| CONTRACTOR TOTAL | 5,084,841.31 | 5,181,752.98 | 5,892,286.30 | 6,588,672.40 | ||||||||