Bid Tabulations
Letting of
02/29/2012
LA DOTD Headquarters
| Lead Project: H.007114.6 | |
| Parish: Calcasieu | |
| Routes: | |
| Description: Park Road @ Recreation Blvd. | |
| Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, LIME TREATMENT, PAVEMENT PATCHING, AND RELATED WORK | |
| Estimated Construction Cost: $870,152.59 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 14648 | Mcmanus Construction, Inc. | $846,386.11 |
| 2 | 36384 | John Bailey, Inc. | $847,848.93 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $867,881.15 |
| 4 | 39462 | Jb James Construction Llc | $916,711.78 |
| 5 | 30774 | Progressive Construction Co., LLC | $931,009.89 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Mcmanus Construction, Inc. |
- 2 - John Bailey, Inc. |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 90,000.00 | 90,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 12,000.00 | 26,000.00 | 26,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 24 | SQYD | 15.00 | 360.00 | 10.00 | 240.00 | 30.00 | 720.00 | 12.00 | 288.00 |
| 0004 | 202-02-02020 | Removal of Asphalt Pavement | 299.1 | SQYD | 15.00 | 4,486.50 | 12.00 | 3,589.20 | 10.00 | 2,991.00 | 12.00 | 3,589.20 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 644 | SQYD | 15.00 | 9,660.00 | 8.00 | 5,152.00 | 10.00 | 6,440.00 | 12.00 | 7,728.00 |
| 0006 | 202-02-26300 | Removal of Median / Island | 2 | SQYD | 100.00 | 200.00 | 450.00 | 900.00 | 150.00 | 300.00 | 200.00 | 400.00 |
| 0007 | 202-03-00010 | Relocation Brick Memorial (Sta. 21+71.09) | 1 | EACH | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 | 1.00 | 1.00 |
| 0008 | 203-02-00100 | Drainage Excavation | 10 | CUYD | 20.00 | 200.00 | 50.00 | 500.00 | 50.00 | 500.00 | 25.00 | 250.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 21,000.00 | 21,000.00 |
| 0010 | 204-02-00100 | Temporary Hay or Straw Bales | 154 | EACH | 20.00 | 3,080.00 | 20.00 | 3,080.00 | 15.00 | 2,310.00 | 12.00 | 1,848.00 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 300.00 | 600.00 | 200.00 | 400.00 | 400.00 | 800.00 | 200.00 | 400.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 1,907 | LNFT | 3.00 | 5,721.00 | 4.00 | 7,628.00 | 1.40 | 2,669.80 | 2.50 | 4,767.50 |
| 0014 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 1,964 | SQYD | 12.00 | 23,568.00 | 25.00 | 49,100.00 | 12.00 | 23,568.00 | 12.00 | 23,568.00 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,500 | CUYD | 72.00 | 108,000.00 | 60.00 | 90,000.00 | 10.00 | 15,000.00 | 1.00 | 1,500.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 1,554.9 | TON | 105.00 | 163,264.50 | 110.00 | 171,039.00 | 125.00 | 194,362.50 | 101.00 | 157,044.90 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 134.4 | TON | 145.00 | 19,488.00 | 152.00 | 20,428.80 | 200.00 | 26,880.00 | 140.00 | 18,816.00 |
| 0018 | 509-01-00100 | Cold Planing Asphaltic Pavement | 3,410 | SQYD | 2.15 | 7,331.50 | 5.75 | 19,607.50 | 3.50 | 11,935.00 | 2.40 | 8,184.00 |
| 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -95 | CUYD | 1.00 | -95.00 | 0.01 | -0.95 | 5.00 | -475.00 | 1.00 | -95.00 |
| 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 31 | SQYD | 204.00 | 6,324.00 | 150.00 | 4,650.00 | 215.00 | 6,665.00 | 195.00 | 6,045.00 |
| 0021 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,602 | LNFT | 60.00 | 96,120.00 | 50.00 | 80,100.00 | 55.00 | 88,110.00 | 70.00 | 112,140.00 |
| 0022 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 325 | LNFT | 70.00 | 22,750.00 | 70.00 | 22,750.00 | 90.00 | 29,250.00 | 95.00 | 30,875.00 |
| 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 158 | LNFT | 85.00 | 13,430.00 | 85.00 | 13,430.00 | 100.00 | 15,800.00 | 110.00 | 17,380.00 |
| 0024 | 701-10-01200 | Reinforced Concrete Pipe (Extension) (72") | 15 | LNFT | 300.00 | 4,500.00 | 250.00 | 3,750.00 | 485.00 | 7,275.00 | 275.00 | 4,125.00 |
| 0025 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 3,500.00 | 7,000.00 | 4,000.00 | 8,000.00 | 4,800.00 | 9,600.00 | 3,600.00 | 7,200.00 |
| 0026 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 2,200.00 | 24,200.00 | 2,500.00 | 27,500.00 | 2,900.00 | 31,900.00 | 2,500.00 | 27,500.00 |
| 0027 | 702-03-00500 | Catch Basins (CB-06) | 21 | EACH | 3,000.00 | 63,000.00 | 3,500.00 | 73,500.00 | 4,000.00 | 84,000.00 | 3,300.00 | 69,300.00 |
| 0028 | 706-01-00100 | Concrete Walk (4" Thick) | 454.6 | SQYD | 54.00 | 24,548.40 | 50.00 | 22,730.00 | 50.00 | 22,730.00 | 48.00 | 21,820.80 |
| 0029 | 706-02-00200 | Concrete Drive (6" Thick) | 232.4 | SQYD | 63.00 | 14,641.20 | 65.00 | 15,106.00 | 88.00 | 20,451.20 | 65.00 | 15,106.00 |
| 0030 | 706-04-00100 | Handicapped Curb Ramps | 5 | EACH | 1,575.00 | 7,875.00 | 900.00 | 4,500.00 | 1,000.00 | 5,000.00 | 825.00 | 4,125.00 |
| 0031 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,016.9 | LNFT | 25.00 | 50,422.50 | 25.00 | 50,422.50 | 19.00 | 38,321.10 | 27.00 | 54,456.30 |
| 0032 | 707-04-00100 | Asphaltic Curb | 55.7 | LNFT | 100.00 | 5,570.00 | 50.00 | 2,785.00 | 50.00 | 2,785.00 | 20.00 | 1,114.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 6,000.00 | 6,000.00 |
| 0034 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.377 | MILE | 3,000.00 | 1,131.00 | 500.00 | 188.50 | 500.00 | 188.50 | 1,050.00 | 395.85 |
| 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.829 | MILE | 3,000.00 | 2,487.00 | 747.50 | 619.68 | 650.00 | 538.85 | 1,025.00 | 849.73 |
| 0036 | 716-01-00100 | Mulch (Vegetative) | 1.4 | TON | 1,671.00 | 2,339.40 | 1,075.00 | 1,505.00 | 1,000.00 | 1,400.00 | 900.00 | 1,260.00 |
| 0037 | 717-01-00100 | Seeding | 32 | LB | 17.00 | 544.00 | 18.00 | 576.00 | 20.00 | 640.00 | 15.50 | 496.00 |
| 0038 | 718-01-00100 | Fertilizer | 700 | LB | 1.05 | 735.00 | 1.50 | 1,050.00 | 2.00 | 1,400.00 | 1.00 | 700.00 |
| 0039 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 7,000.00 | 7,000.00 | 10,000.00 | 10,000.00 | 3,500.00 | 3,500.00 | 8,000.00 | 8,000.00 |
| 0040 | 726-01-00100 | Bedding Material | 238.9 | CUYD | 80.00 | 19,112.00 | 85.00 | 20,306.50 | 90.00 | 21,501.00 | 85.00 | 20,306.50 |
| 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 38,000.00 | 38,000.00 | 85,000.00 | 85,000.00 | 90,000.00 | 90,000.00 |
| 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 271 | EACH | 5.51 | 1,493.21 | 5.75 | 1,558.25 | 6.00 | 1,626.00 | 5.00 | 1,355.00 |
| 0043 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 5,730 | LNFT | 0.68 | 3,896.40 | 0.80 | 4,584.00 | 0.75 | 4,297.50 | 1.00 | 5,730.00 |
| 0044 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 225 | LNFT | 1.42 | 319.50 | 1.75 | 393.75 | 1.50 | 337.50 | 2.00 | 450.00 |
| 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 164 | LNFT | 5.25 | 861.00 | 5.75 | 943.00 | 5.80 | 951.20 | 5.00 | 820.00 |
| 0046 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 226.00 | 452.00 | 220.00 | 440.00 | 250.00 | 500.00 | 300.00 | 600.00 |
| 0047 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 226.00 | 226.00 | 220.00 | 220.00 | 250.00 | 250.00 | 300.00 | 300.00 |
| 0048 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 236.00 | 708.00 | 240.00 | 720.00 | 260.00 | 780.00 | 300.00 | 900.00 |
| 0049 | 735-01-00100 | Mailboxes | 3 | EACH | 300.00 | 900.00 | 150.00 | 450.00 | 12.00 | 36.00 | 150.00 | 450.00 |
| 0050 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 100.00 | 300.00 | 150.00 | 450.00 | 255.00 | 765.00 | 505.00 | 1,515.00 |
| 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 7,000.00 | 7,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 |
| 0052 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 1,000.00 | 1,000.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 1,000.00 | 1,000.00 |
| 0053 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 2 | EACH | 500.00 | 1,000.00 | 350.00 | 700.00 | 500.00 | 1,000.00 | 600.00 | 1,200.00 |
| 0054 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 12,570 | INLF | 2.00 | 25,140.00 | 0.85 | 10,684.50 | 0.50 | 6,285.00 | 0.85 | 10,684.50 |
| 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 498 | INLF | 2.00 | 996.00 | 1.15 | 572.70 | 2.00 | 996.00 | 1.25 | 622.50 |
| 0056 | NS-MSC-00120 | Drainage Structure CB-CAP, Capping Existing Catch Basin | 1 | EACH | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 2,000.00 | 1,600.00 | 1,600.00 |
| CONTRACTOR TOTAL | 846,386.11 | 847,848.93 | 867,881.15 | 916,711.78 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Progressive Construction Co., LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 24,000.00 | 24,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 24 | SQYD | 9.40 | 225.60 |
| 0004 | 202-02-02020 | Removal of Asphalt Pavement | 299.1 | SQYD | 9.40 | 2,811.54 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 644 | SQYD | 9.40 | 6,053.60 |
| 0006 | 202-02-26300 | Removal of Median / Island | 2 | SQYD | 100.00 | 200.00 |
| 0007 | 202-03-00010 | Relocation Brick Memorial (Sta. 21+71.09) | 1 | EACH | 2,500.00 | 2,500.00 |
| 0008 | 203-02-00100 | Drainage Excavation | 10 | CUYD | 50.00 | 500.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 13,500.00 | 13,500.00 |
| 0010 | 204-02-00100 | Temporary Hay or Straw Bales | 154 | EACH | 13.20 | 2,032.80 |
| 0011 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 165.00 | 330.00 |
| 0012 | 204-06-00100 | Temporary Silt Fencing | 1,907 | LNFT | 2.20 | 4,195.40 |
| 0014 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 1,964 | SQYD | 33.50 | 65,794.00 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,500 | CUYD | 70.00 | 105,000.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 1,554.9 | TON | 116.50 | 181,145.85 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 134.4 | TON | 135.00 | 18,144.00 |
| 0018 | 509-01-00100 | Cold Planing Asphaltic Pavement | 3,410 | SQYD | 7.50 | 25,575.00 |
| 0019 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -95 | CUYD | 0.01 | -0.95 |
| 0020 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 31 | SQYD | 198.00 | 6,138.00 |
| 0021 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 1,602 | LNFT | 46.25 | 74,092.50 |
| 0022 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 325 | LNFT | 81.50 | 26,487.50 |
| 0023 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 158 | LNFT | 112.25 | 17,735.50 |
| 0024 | 701-10-01200 | Reinforced Concrete Pipe (Extension) (72") | 15 | LNFT | 456.00 | 6,840.00 |
| 0025 | 702-02-00200 | Manholes (R-CB-11) | 2 | EACH | 5,500.00 | 11,000.00 |
| 0026 | 702-03-00100 | Catch Basins (CB-01) | 11 | EACH | 2,650.00 | 29,150.00 |
| 0027 | 702-03-00500 | Catch Basins (CB-06) | 21 | EACH | 3,300.00 | 69,300.00 |
| 0028 | 706-01-00100 | Concrete Walk (4" Thick) | 454.6 | SQYD | 55.00 | 25,003.00 |
| 0029 | 706-02-00200 | Concrete Drive (6" Thick) | 232.4 | SQYD | 58.00 | 13,479.20 |
| 0030 | 706-04-00100 | Handicapped Curb Ramps | 5 | EACH | 1,500.00 | 7,500.00 |
| 0031 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,016.9 | LNFT | 24.50 | 49,414.05 |
| 0032 | 707-04-00100 | Asphaltic Curb | 55.7 | LNFT | 60.00 | 3,342.00 |
| 0033 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,800.00 | 13,800.00 |
| 0034 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.377 | MILE | 6,200.00 | 2,337.40 |
| 0035 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.829 | MILE | 600.00 | 497.40 |
| 0036 | 716-01-00100 | Mulch (Vegetative) | 1.4 | TON | 985.00 | 1,379.00 |
| 0037 | 717-01-00100 | Seeding | 32 | LB | 16.50 | 528.00 |
| 0038 | 718-01-00100 | Fertilizer | 700 | LB | 1.65 | 1,155.00 |
| 0039 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 20,000.00 | 20,000.00 |
| 0040 | 726-01-00100 | Bedding Material | 238.9 | CUYD | 80.00 | 19,112.00 |
| 0041 | 727-01-00100 | Mobilization | 1 | LUMP | 44,500.00 | 44,500.00 |
| 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 271 | EACH | 6.00 | 1,626.00 |
| 0043 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 5,730 | LNFT | 0.75 | 4,297.50 |
| 0044 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 225 | LNFT | 1.60 | 360.00 |
| 0045 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 164 | LNFT | 5.50 | 902.00 |
| 0046 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 250.00 | 500.00 |
| 0047 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 1 | EACH | 250.00 | 250.00 |
| 0048 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 250.00 | 750.00 |
| 0049 | 735-01-00100 | Mailboxes | 3 | EACH | 15.00 | 45.00 |
| 0050 | 735-02-00100 | Mailbox Supports (Single) | 3 | EACH | 350.00 | 1,050.00 |
| 0051 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 |
| 0052 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 5,000.00 | 5,000.00 |
| 0053 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 2 | EACH | 1,200.00 | 2,400.00 |
| 0054 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 12,570 | INLF | 0.50 | 6,285.00 |
| 0055 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 498 | INLF | 1.50 | 747.00 |
| 0056 | NS-MSC-00120 | Drainage Structure CB-CAP, Capping Existing Catch Basin | 1 | EACH | 1,000.00 | 1,000.00 |
| CONTRACTOR TOTAL | 931,009.89 | |||||