Bid Tabulations
Letting of
08/08/2012
LA DOTD Headquarters
| Lead Project: H.006592.6 | |
| Parish: St. Charles | |
| Routes: | |
| Description: NORCO 5TH STREET SIDEWALK PROJECT | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $353,800.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 50267 | Hhp Construction Group Llc | $230,287.00 |
| 2 | 48896 | Command Construction Industries LLC | $238,700.52 |
| 3 | 54896 | Magee Excavation & Development LLC | $245,225.00 |
| 4 | 24901 | Hard Rock Construction LLC | $252,164.00 |
| 5 | 12198 | Byron E. Talbot Contractor, Inc. | $290,991.45 |
| 6 | 34263 | La Contracting Enterprises Llc | $311,916.00 |
| 7 | 00935 | Fleming Construction Co., LLC | $312,340.00 |
| 8 | 51053 | APC Construction, LLC | $354,338.05 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Hhp Construction Group Llc |
- 2 - Command Construction Industries LLC |
- 3 - Magee Excavation & Development LLC |
- 4 - Hard Rock Construction LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 2,500.00 | 2,500.00 | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 4,500.00 | 4,500.00 | 15,000.00 | 15,000.00 | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 21,000.00 | 21,000.00 | 1,000.00 | 1,000.00 | 8,500.00 | 8,500.00 | 12,000.00 | 12,000.00 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 30 | EACH | 125.00 | 3,750.00 | 50.00 | 1,500.00 | 7.00 | 210.00 | 6.00 | 180.00 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 3,660 | LNFT | 1.85 | 6,771.00 | 0.10 | 366.00 | 1.50 | 5,490.00 | 2.00 | 7,320.00 |
| 0006 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 615.00 | 1,230.00 | 0.01 | 0.02 | 2,000.00 | 4,000.00 | 100.00 | 200.00 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 70.00 | 3,500.00 | 0.01 | 0.50 | 70.00 | 3,500.00 | 30.00 | 1,500.00 |
| 0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 10 | SQYD | 98.00 | 980.00 | 125.00 | 1,250.00 | 158.00 | 1,580.00 | 90.00 | 900.00 |
| 0009 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 170 | LNFT | 61.00 | 10,370.00 | 70.00 | 11,900.00 | 29.00 | 4,930.00 | 65.00 | 11,050.00 |
| 0010 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 45 | LNFT | 85.00 | 3,825.00 | 80.00 | 3,600.00 | 37.00 | 1,665.00 | 82.00 | 3,690.00 |
| 0011 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 185 | LNFT | 90.00 | 16,650.00 | 90.00 | 16,650.00 | 50.00 | 9,250.00 | 80.00 | 14,800.00 |
| 0012 | 701-07-00300 | Yard Drain Pipe (8") | 15 | LNFT | 27.00 | 405.00 | 30.00 | 450.00 | 7.00 | 105.00 | 10.00 | 150.00 |
| 0013 | 701-07-00500 | Yard Drain Pipe (12") | 15 | LNFT | 32.00 | 480.00 | 40.00 | 600.00 | 12.00 | 180.00 | 15.00 | 225.00 |
| 0014 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 1,850.00 | 1,850.00 | 2,500.00 | 2,500.00 | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 |
| 0015 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 2,500.00 | 2,500.00 | 500.00 | 500.00 | 790.00 | 790.00 | 1,200.00 | 1,200.00 |
| 0016 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 1,500.00 | 4,500.00 | 2,500.00 | 7,500.00 | 1,640.00 | 4,920.00 | 3,000.00 | 9,000.00 |
| 0017 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 1,750.00 | 5,250.00 | 2,500.00 | 7,500.00 | 1,750.00 | 5,250.00 | 3,000.00 | 9,000.00 |
| 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 1,900 | SQYD | 47.50 | 90,250.00 | 50.00 | 95,000.00 | 37.00 | 70,300.00 | 46.00 | 87,400.00 |
| 0019 | 706-01-00300 | Concrete Walk (6" Thick) | 25 | SQYD | 100.00 | 2,500.00 | 80.00 | 2,000.00 | 47.00 | 1,175.00 | 66.00 | 1,650.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,800.00 | 7,800.00 | 1,000.00 | 1,000.00 | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 |
| 0021 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 800.00 | 1,600.00 | 1.00 | 2.00 | 1,500.00 | 3,000.00 | 1,000.00 | 2,000.00 |
| 0022 | 726-01-00100 | Bedding Material | 30 | CUYD | 70.00 | 2,100.00 | 40.00 | 1,200.00 | 86.00 | 2,580.00 | 60.00 | 1,800.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 27,500.00 | 27,500.00 | 72,500.00 | 72,500.00 | 26,000.00 | 26,000.00 |
| 0024 | 729-01-00100 | Sign (Type A) | 52 | SQFT | 25.00 | 1,300.00 | 35.00 | 1,820.00 | 30.00 | 1,560.00 | 22.00 | 1,144.00 |
| 0025 | 729-08-00100 | Mounting (2 1/2" Size Post) | 4 | EACH | 1,200.00 | 4,800.00 | 1,000.00 | 4,000.00 | 1,580.00 | 6,320.00 | 1,000.00 | 4,000.00 |
| 0026 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 480 | LNFT | 2.70 | 1,296.00 | 7.00 | 3,360.00 | 14.00 | 6,720.00 | 7.00 | 3,360.00 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 30.00 | 30.00 | 250.00 | 250.00 | 100.00 | 100.00 | 95.00 | 95.00 |
| 0028 | 739-01-00100 | Hydro-Seeding | 2 | ACRE | 2,150.00 | 4,300.00 | 1.00 | 2.00 | 1,550.00 | 3,100.00 | 1,500.00 | 3,000.00 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 1,000.00 | 1,000.00 | 4,500.00 | 4,500.00 | 5,000.00 | 5,000.00 |
| 0030 | 741-06-00100 | Relocating Fire Hydrant | 5 | EACH | 1,000.00 | 5,000.00 | 750.00 | 3,750.00 | 650.00 | 3,250.00 | 4,500.00 | 22,500.00 |
| 0031 | 741-11-00200 | Adjusting Water Valve and Meter Box | 10 | EACH | 175.00 | 1,750.00 | 250.00 | 2,500.00 | 125.00 | 1,250.00 | 100.00 | 1,000.00 |
| CONTRACTOR TOTAL | 230,287.00 | 238,700.52 | 245,225.00 | 252,164.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Byron E. Talbot Contractor, Inc. |
- 6 - La Contracting Enterprises Llc |
- 7 - Fleming Construction Co., LLC |
- 8 - APC Construction, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 9,500.00 | 9,500.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 8,947.37 | 8,947.37 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 | 5,000.00 | 5,000.00 | 3,684.21 | 3,684.21 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 3,789.47 | 3,789.47 |
| 0004 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 30 | EACH | 25.00 | 750.00 | 140.00 | 4,200.00 | 10.00 | 300.00 | 15.79 | 473.70 |
| 0005 | 204-06-00100 | Temporary Silt Fencing | 3,660 | LNFT | 2.10 | 7,686.00 | 2.25 | 8,235.00 | 2.00 | 7,320.00 | 1.95 | 7,137.00 |
| 0006 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 500.00 | 1,000.00 | 3,900.00 | 7,800.00 | 2,000.00 | 4,000.00 | 631.58 | 1,263.16 |
| 0007 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 50.00 | 2,500.00 | 88.00 | 4,400.00 | 50.00 | 2,500.00 | 38.95 | 1,947.50 |
| 0008 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 10 | SQYD | 100.00 | 1,000.00 | 110.00 | 1,100.00 | 250.00 | 2,500.00 | 117.89 | 1,178.90 |
| 0009 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 170 | LNFT | 57.65 | 9,800.50 | 55.00 | 9,350.00 | 90.00 | 15,300.00 | 117.89 | 20,041.30 |
| 0010 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 45 | LNFT | 65.75 | 2,958.75 | 70.00 | 3,150.00 | 140.00 | 6,300.00 | 129.47 | 5,826.15 |
| 0011 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 185 | LNFT | 75.00 | 13,875.00 | 82.00 | 15,170.00 | 100.00 | 18,500.00 | 184.21 | 34,078.85 |
| 0012 | 701-07-00300 | Yard Drain Pipe (8") | 15 | LNFT | 50.00 | 750.00 | 27.00 | 405.00 | 100.00 | 1,500.00 | 15.79 | 236.85 |
| 0013 | 701-07-00500 | Yard Drain Pipe (12") | 15 | LNFT | 50.00 | 750.00 | 48.00 | 720.00 | 100.00 | 1,500.00 | 18.95 | 284.25 |
| 0014 | 702-02-00200 | Manholes (R-CB-11) | 1 | EACH | 2,400.00 | 2,400.00 | 2,500.00 | 2,500.00 | 6,000.00 | 6,000.00 | 1,894.74 | 1,894.74 |
| 0015 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) | 1 | EACH | 1,100.00 | 1,100.00 | 1,200.00 | 1,200.00 | 2,000.00 | 2,000.00 | 3,684.21 | 3,684.21 |
| 0016 | 702-03-00100 | Catch Basins (CB-01) | 3 | EACH | 2,250.00 | 6,750.00 | 2,800.00 | 8,400.00 | 4,500.00 | 13,500.00 | 2,947.37 | 8,842.11 |
| 0017 | 702-03-00200 | Catch Basins (CB-02) | 3 | EACH | 2,450.00 | 7,350.00 | 3,000.00 | 9,000.00 | 5,000.00 | 15,000.00 | 2,947.37 | 8,842.11 |
| 0018 | 706-01-00100 | Concrete Walk (4" Thick) | 1,900 | SQYD | 62.15 | 118,085.00 | 52.00 | 98,800.00 | 65.00 | 123,500.00 | 68.42 | 129,998.00 |
| 0019 | 706-01-00300 | Concrete Walk (6" Thick) | 25 | SQYD | 70.00 | 1,750.00 | 60.00 | 1,500.00 | 100.00 | 2,500.00 | 78.95 | 1,973.75 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 | 8,000.00 | 8,000.00 | 4,421.05 | 4,421.05 |
| 0021 | 716-01-00100 | Mulch (Vegetative) | 2 | TON | 1,600.00 | 3,200.00 | 950.00 | 1,900.00 | 750.00 | 1,500.00 | 1,368.42 | 2,736.84 |
| 0022 | 726-01-00100 | Bedding Material | 30 | CUYD | 45.00 | 1,350.00 | 120.00 | 3,600.00 | 100.00 | 3,000.00 | 68.42 | 2,052.60 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 24,000.00 | 24,000.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 46,806.74 | 46,806.74 |
| 0024 | 729-01-00100 | Sign (Type A) | 52 | SQFT | 23.35 | 1,214.20 | 28.00 | 1,456.00 | 20.00 | 1,040.00 | 11.58 | 602.16 |
| 0025 | 729-08-00100 | Mounting (2 1/2" Size Post) | 4 | EACH | 1,200.00 | 4,800.00 | 1,400.00 | 5,600.00 | 300.00 | 1,200.00 | 263.16 | 1,052.64 |
| 0026 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 480 | LNFT | 2.65 | 1,272.00 | 8.00 | 3,840.00 | 6.00 | 2,880.00 | 15.79 | 7,579.20 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 300.00 | 300.00 | 190.00 | 190.00 | 300.00 | 300.00 | 121.05 | 121.05 |
| 0028 | 739-01-00100 | Hydro-Seeding | 2 | ACRE | 1,225.00 | 2,450.00 | 2,400.00 | 4,800.00 | 1,850.00 | 3,700.00 | 1,894.74 | 3,789.48 |
| 0029 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,400.00 | 4,400.00 | 3,600.00 | 3,600.00 | 3,000.00 | 3,000.00 | 6,842.11 | 6,842.11 |
| 0030 | 741-06-00100 | Relocating Fire Hydrant | 5 | EACH | 4,200.00 | 21,000.00 | 2,300.00 | 11,500.00 | 2,500.00 | 12,500.00 | 1,578.95 | 7,894.75 |
| 0031 | 741-11-00200 | Adjusting Water Valve and Meter Box | 10 | EACH | 400.00 | 4,000.00 | 450.00 | 4,500.00 | 300.00 | 3,000.00 | 2,631.58 | 26,315.80 |
| CONTRACTOR TOTAL | 290,991.45 | 311,916.00 | 312,340.00 | 354,338.05 | ||||||||