Bid Tabulations
Letting of
05/30/2012
LA DOTD Headquarters
| Lead Project: H.006556.6 | |
| Parish: Livingston | |
| Routes: | |
| Description: Walker Sidewalks (Phase 2) | |
| Type Const: GRADING, DRAINAGE STRUCTURES, SIDEWALKS AND RELATED WORK. | |
| Estimated Construction Cost: $205,935.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $157,116.00 |
| 2 | 49356 | Kort's Trucking Inc. | $179,117.00 |
| 3 | 16724 | Stranco, Inc. | $188,107.00 |
| 4 | 54896 | Magee Excavation & Development LLC | $188,376.50 |
| 5 | 24901 | Hard Rock Construction LLC | $212,650.00 |
| 6 | 48896 | Command Construction Industries LLC | $212,907.00 |
| 7 | 05693 | Industrial Enterprises, Inc. | $254,781.35 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Byron E. Talbot Contractor, Inc. |
- 2 - Kort's Trucking Inc. |
- 3 - Stranco, Inc. |
- 4 - Magee Excavation & Development LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 3,325.00 | 3,325.00 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 25 | SQYD | 7.00 | 175.00 | 12.00 | 300.00 | 9.00 | 225.00 | 27.00 | 675.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 250 | SQYD | 7.00 | 1,750.00 | 12.00 | 3,000.00 | 9.00 | 2,250.00 | 24.00 | 6,000.00 |
| 0004 | 203-04-00300 | Nonplastic Embankment (Stone) | 50 | CUYD | 70.00 | 3,500.00 | 65.00 | 3,250.00 | 70.00 | 3,500.00 | 80.00 | 4,000.00 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 6,000.00 | 6,000.00 | 13,300.00 | 13,300.00 |
| 0006 | 203-08-00100 | Geotextile Fabric | 200 | SQYD | 2.25 | 450.00 | 5.00 | 1,000.00 | 2.00 | 400.00 | 4.00 | 800.00 |
| 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 100 | EACH | 12.00 | 1,200.00 | 11.00 | 1,100.00 | 12.00 | 1,200.00 | 13.30 | 1,330.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 900 | LNFT | 3.00 | 2,700.00 | 2.75 | 2,475.00 | 2.50 | 2,250.00 | 1.80 | 1,620.00 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 10 | CUYD | 70.00 | 700.00 | 45.00 | 450.00 | 50.00 | 500.00 | 80.00 | 800.00 |
| 0010 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 188 | LNFT | 40.00 | 7,520.00 | 38.00 | 7,144.00 | 50.00 | 9,400.00 | 24.75 | 4,653.00 |
| 0011 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 48 | LNFT | 45.00 | 2,160.00 | 45.00 | 2,160.00 | 55.00 | 2,640.00 | 38.00 | 1,824.00 |
| 0012 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 352 | LNFT | 51.00 | 17,952.00 | 45.00 | 15,840.00 | 70.00 | 24,640.00 | 19.60 | 6,899.20 |
| 0013 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 20 | LNFT | 55.00 | 1,100.00 | 50.00 | 1,000.00 | 45.00 | 900.00 | 2.00 | 40.00 |
| 0014 | 701-07-00100 | Yard Drain Pipe (4") | 10 | LNFT | 10.00 | 100.00 | 5.00 | 50.00 | 24.00 | 240.00 | 2.65 | 26.50 |
| 0015 | 701-07-00200 | Yard Drain Pipe (6") | 20 | LNFT | 15.00 | 300.00 | 7.00 | 140.00 | 26.00 | 520.00 | 2.65 | 53.00 |
| 0016 | 701-07-00300 | Yard Drain Pipe (8") | 86 | LNFT | 20.00 | 1,720.00 | 8.00 | 688.00 | 30.00 | 2,580.00 | 3.70 | 318.20 |
| 0017 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 1,800.00 | 16,200.00 | 2,200.00 | 19,800.00 | 2,050.00 | 18,450.00 | 1,390.00 | 12,510.00 |
| 0018 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 800.00 | 800.00 | 600.00 | 600.00 | 750.00 | 750.00 | 400.00 | 400.00 |
| 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 790 | SQYD | 43.20 | 34,128.00 | 45.00 | 35,550.00 | 50.00 | 39,500.00 | 61.00 | 48,190.00 |
| 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 210 | SQYD | 60.00 | 12,600.00 | 60.00 | 12,600.00 | 60.00 | 12,600.00 | 68.50 | 14,385.00 |
| 0021 | 711-03-00300 | Riprap (30 lb) | 10 | TON | 55.00 | 550.00 | 65.00 | 650.00 | 150.00 | 1,500.00 | 79.80 | 798.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,750.00 | 3,750.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 6,100.00 | 6,100.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 6,500.00 | 6,500.00 | 9,500.00 | 9,500.00 | 17,500.00 | 17,500.00 | 25,000.00 | 25,000.00 |
| 0024 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 110 | LNFT | 3.30 | 363.00 | 10.00 | 1,100.00 | 20.00 | 2,200.00 | 18.60 | 2,046.00 |
| 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 28 | LNFT | 11.00 | 308.00 | 15.00 | 420.00 | 44.00 | 1,232.00 | 43.70 | 1,223.60 |
| 0026 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 4,000.00 | 2,000.00 | 2,200.00 | 1,100.00 | 2,400.00 | 1,200.00 | 2,790.00 | 1,395.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,800.00 | 1,800.00 | 7,500.00 | 7,500.00 | 2,500.00 | 2,500.00 | 13,300.00 | 13,300.00 |
| 0028 | 805-01-00100 | Class A Concrete | 25 | CUYD | 800.00 | 20,000.00 | 1,100.00 | 27,500.00 | 715.00 | 17,875.00 | 132.00 | 3,300.00 |
| 0029 | 806-01-00100 | Deformed Reinforcing Steel | 2,000 | LB | 1.10 | 2,200.00 | 1.15 | 2,300.00 | 1.50 | 3,000.00 | 3.30 | 6,600.00 |
| 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 100 | INLF | 1.10 | 110.00 | 1.00 | 100.00 | 1.25 | 125.00 | 2.65 | 265.00 |
| 0031 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,800 | INLF | 1.10 | 1,980.00 | 1.00 | 1,800.00 | 1.35 | 2,430.00 | 4.00 | 7,200.00 |
| CONTRACTOR TOTAL | 157,116.00 | 179,117.00 | 188,107.00 | 188,376.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Hard Rock Construction LLC |
- 6 - Command Construction Industries LLC |
- 7 - Industrial Enterprises, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 10,000.00 | 10,000.00 | 1,157.48 | 1,157.48 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 25 | SQYD | 10.00 | 250.00 | 1.00 | 25.00 | 6.33 | 158.25 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 250 | SQYD | 10.00 | 2,500.00 | 1.00 | 250.00 | 12.65 | 3,162.50 |
| 0004 | 203-04-00300 | Nonplastic Embankment (Stone) | 50 | CUYD | 70.00 | 3,500.00 | 125.00 | 6,250.00 | 126.50 | 6,325.00 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 10,000.00 | 10,000.00 | 22,137.50 | 22,137.50 |
| 0006 | 203-08-00100 | Geotextile Fabric | 200 | SQYD | 2.00 | 400.00 | 3.00 | 600.00 | 2.88 | 576.00 |
| 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 100 | EACH | 10.00 | 1,000.00 | 1.00 | 100.00 | 12.08 | 1,208.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 900 | LNFT | 2.00 | 1,800.00 | 3.00 | 2,700.00 | 2.53 | 2,277.00 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 10 | CUYD | 80.00 | 800.00 | 100.00 | 1,000.00 | 86.25 | 862.50 |
| 0010 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 188 | LNFT | 60.00 | 11,280.00 | 75.00 | 14,100.00 | 66.19 | 12,443.72 |
| 0011 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 48 | LNFT | 60.00 | 2,880.00 | 76.00 | 3,648.00 | 68.83 | 3,303.84 |
| 0012 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 352 | LNFT | 60.00 | 21,120.00 | 77.00 | 27,104.00 | 96.30 | 33,897.60 |
| 0013 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 20 | LNFT | 105.00 | 2,100.00 | 70.00 | 1,400.00 | 103.39 | 2,067.80 |
| 0014 | 701-07-00100 | Yard Drain Pipe (4") | 10 | LNFT | 50.00 | 500.00 | 15.00 | 150.00 | 17.53 | 175.30 |
| 0015 | 701-07-00200 | Yard Drain Pipe (6") | 20 | LNFT | 50.00 | 1,000.00 | 15.00 | 300.00 | 18.63 | 372.60 |
| 0016 | 701-07-00300 | Yard Drain Pipe (8") | 86 | LNFT | 50.00 | 4,300.00 | 20.00 | 1,720.00 | 23.41 | 2,013.26 |
| 0017 | 702-03-00100 | Catch Basins (CB-01) | 9 | EACH | 2,000.00 | 18,000.00 | 2,000.00 | 18,000.00 | 1,725.00 | 15,525.00 |
| 0018 | 702-03-00400 | Catch Basins (CB-05) | 1 | EACH | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | 431.25 | 431.25 |
| 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 790 | SQYD | 50.00 | 39,500.00 | 50.00 | 39,500.00 | 75.10 | 59,329.00 |
| 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 210 | SQYD | 70.00 | 14,700.00 | 51.00 | 10,710.00 | 86.25 | 18,112.50 |
| 0021 | 711-03-00300 | Riprap (30 lb) | 10 | TON | 100.00 | 1,000.00 | 50.00 | 500.00 | 115.00 | 1,150.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 | 11,500.00 | 11,500.00 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 22,000.00 | 22,000.00 | 20,000.00 | 20,000.00 | 9,832.50 | 9,832.50 |
| 0024 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 110 | LNFT | 10.00 | 1,100.00 | 10.00 | 1,100.00 | 3.45 | 379.50 |
| 0025 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 28 | LNFT | 15.00 | 420.00 | 20.00 | 560.00 | 11.50 | 322.00 |
| 0026 | 739-01-00100 | Hydro-Seeding | 0.5 | ACRE | 2,000.00 | 1,000.00 | 2,500.00 | 1,250.00 | 2,415.00 | 1,207.50 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 2,500.00 | 2,500.00 | 2,875.00 | 2,875.00 |
| 0028 | 805-01-00100 | Class A Concrete | 25 | CUYD | 1,000.00 | 25,000.00 | 1,250.00 | 31,250.00 | 1,454.51 | 36,362.75 |
| 0029 | 806-01-00100 | Deformed Reinforcing Steel | 2,000 | LB | 1.00 | 2,000.00 | 2.00 | 4,000.00 | 1.73 | 3,460.00 |
| 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 100 | INLF | 2.00 | 200.00 | 0.10 | 10.00 | 0.86 | 86.00 |
| 0031 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 1,800 | INLF | 1.00 | 1,800.00 | 0.10 | 180.00 | 1.15 | 2,070.00 |
| CONTRACTOR TOTAL | 212,650.00 | 212,907.00 | 254,781.35 | |||||||