Bid Tabulations
Letting of
05/30/2012
LA DOTD Headquarters
| Lead Project: H.006555.6 | |
| Parish: Livingston | |
| Routes: | |
| Description: South Walker Sidewalks | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PORTLAND CEMENT CONCRETE WALKS AND DRIVES AND RELATED WORK. | |
| Estimated Construction Cost: $200,125.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12198 | Byron E. Talbot Contractor, Inc. | $154,117.00 |
| 2 | 54896 | Magee Excavation & Development LLC | $160,994.55 |
| 3 | 49356 | Kort's Trucking Inc. | $184,409.00 |
| 4 | 48896 | Command Construction Industries LLC | $189,980.00 |
| 5 | 16724 | Stranco, Inc. | $194,686.70 |
| 6 | 24901 | Hard Rock Construction LLC | $217,255.00 |
| 7 | 05693 | Industrial Enterprises, Inc. | $233,148.63 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Byron E. Talbot Contractor, Inc. |
- 2 - Magee Excavation & Development LLC |
- 3 - Kort's Trucking Inc. |
- 4 - Command Construction Industries LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,500.00 | 2,500.00 | 1,500.00 | 1,500.00 | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 60 | SQYD | 7.00 | 420.00 | 20.00 | 1,200.00 | 15.00 | 900.00 | 1.00 | 60.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 115 | SQYD | 7.00 | 805.00 | 18.00 | 2,070.00 | 15.00 | 1,725.00 | 1.00 | 115.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 6,000.00 | 6,000.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 100 | EACH | 11.50 | 1,150.00 | 11.75 | 1,175.00 | 11.00 | 1,100.00 | 1.00 | 100.00 |
| 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 25 | CUYD | 66.00 | 1,650.00 | 60.00 | 1,500.00 | 45.00 | 1,125.00 | 50.00 | 1,250.00 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 65 | SQYD | 115.00 | 7,475.00 | 175.00 | 11,375.00 | 145.00 | 9,425.00 | 100.00 | 6,500.00 |
| 0008 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 42 | LNFT | 76.00 | 3,192.00 | 49.00 | 2,058.00 | 50.00 | 2,100.00 | 90.00 | 3,780.00 |
| 0009 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 488 | LNFT | 40.00 | 19,520.00 | 21.00 | 10,248.00 | 38.00 | 18,544.00 | 50.00 | 24,400.00 |
| 0010 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 440 | LNFT | 41.00 | 18,040.00 | 26.00 | 11,440.00 | 40.00 | 17,600.00 | 51.00 | 22,440.00 |
| 0011 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 48 | LNFT | 52.00 | 2,496.00 | 66.50 | 3,192.00 | 55.00 | 2,640.00 | 70.00 | 3,360.00 |
| 0012 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 10 | LNFT | 50.00 | 500.00 | 23.50 | 235.00 | 40.00 | 400.00 | 70.00 | 700.00 |
| 0013 | 701-07-00300 | Yard Drain Pipe (8") | 12 | LNFT | 20.00 | 240.00 | 3.30 | 39.60 | 15.00 | 180.00 | 20.00 | 240.00 |
| 0014 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) (Type C) | 1 | EACH | 750.00 | 750.00 | 642.00 | 642.00 | 550.00 | 550.00 | 1,750.00 | 1,750.00 |
| 0015 | 702-03-00100 | Catch Basins (CB-01) | 17 | EACH | 1,800.00 | 30,600.00 | 1,167.00 | 19,839.00 | 2,200.00 | 37,400.00 | 2,000.00 | 34,000.00 |
| 0016 | 702-03-00400 | Catch Basins (CB-05) | 2 | EACH | 700.00 | 1,400.00 | 331.00 | 662.00 | 550.00 | 1,100.00 | 1,000.00 | 2,000.00 |
| 0017 | 706-01-00100 | Concrete Walk (4" Thick) | 790 | SQYD | 43.20 | 34,128.00 | 54.00 | 42,660.00 | 45.00 | 35,550.00 | 45.00 | 35,550.00 |
| 0018 | 706-02-00200 | Concrete Drive (6" Thick) | 140 | SQYD | 60.00 | 8,400.00 | 60.00 | 8,400.00 | 60.00 | 8,400.00 | 45.00 | 6,300.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 2,800.00 | 2,800.00 | 5,352.00 | 5,352.00 | 10,000.00 | 10,000.00 | 5,000.00 | 5,000.00 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 6,500.00 | 6,500.00 | 18,500.00 | 18,500.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 |
| 0021 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 260 | LNFT | 3.30 | 858.00 | 13.75 | 3,575.00 | 10.00 | 2,600.00 | 3.00 | 780.00 |
| 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 11.00 | 528.00 | 29.50 | 1,416.00 | 15.00 | 720.00 | 10.00 | 480.00 |
| 0023 | 739-01-00100 | Hydro-Seeding | 0.3 | ACRE | 4,000.00 | 1,200.00 | 4,204.00 | 1,261.20 | 4,000.00 | 1,200.00 | 2,000.00 | 600.00 |
| 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 1,700.00 | 1,700.00 | 2,919.75 | 2,919.75 | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 |
| 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 250 | INLF | 1.10 | 275.00 | 2.34 | 585.00 | 1.00 | 250.00 | 0.50 | 125.00 |
| 0026 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 900 | INLF | 1.10 | 990.00 | 3.50 | 3,150.00 | 1.00 | 900.00 | 0.50 | 450.00 |
| CONTRACTOR TOTAL | 154,117.00 | 160,994.55 | 184,409.00 | 189,980.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Stranco, Inc. |
- 6 - Hard Rock Construction LLC |
- 7 - Industrial Enterprises, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 1,016.60 | 1,016.60 |
| 0002 | 202-02-02000 | Removal of Asphalt Drives | 60 | SQYD | 9.00 | 540.00 | 10.00 | 600.00 | 5.75 | 345.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 115 | SQYD | 9.00 | 1,035.00 | 10.00 | 1,150.00 | 11.50 | 1,322.50 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 3,555.00 | 3,555.00 | 15,000.00 | 15,000.00 | 18,400.00 | 18,400.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 100 | EACH | 12.00 | 1,200.00 | 10.00 | 1,000.00 | 12.08 | 1,208.00 |
| 0006 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 25 | CUYD | 50.00 | 1,250.00 | 65.00 | 1,625.00 | 86.25 | 2,156.25 |
| 0007 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 65 | SQYD | 140.00 | 9,100.00 | 100.00 | 6,500.00 | 212.75 | 13,828.75 |
| 0008 | 701-03-02040 | Storm Drain Pipe (Outfall) (24" PP or 30" CMP) | 42 | LNFT | 60.00 | 2,520.00 | 80.00 | 3,360.00 | 111.71 | 4,691.82 |
| 0009 | 701-04-01000 | Storm Drain Pipe Arch (15" Equiv. RCPA) | 488 | LNFT | 50.00 | 24,400.00 | 50.00 | 24,400.00 | 63.92 | 31,192.96 |
| 0010 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 440 | LNFT | 55.00 | 24,200.00 | 50.00 | 22,000.00 | 71.31 | 31,376.40 |
| 0011 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 48 | LNFT | 78.00 | 3,744.00 | 100.00 | 4,800.00 | 95.29 | 4,573.92 |
| 0012 | 701-05-01020 | Side Drain Pipe (15" RCP/PP/CMP) | 10 | LNFT | 45.00 | 450.00 | 100.00 | 1,000.00 | 108.76 | 1,087.60 |
| 0013 | 701-07-00300 | Yard Drain Pipe (8") | 12 | LNFT | 30.00 | 360.00 | 75.00 | 900.00 | 24.94 | 299.28 |
| 0014 | 702-03-00001 | Catch Basin (Remove and Replace Frame and Cover) (Type C) | 1 | EACH | 1,800.00 | 1,800.00 | 1,000.00 | 1,000.00 | 1,150.00 | 1,150.00 |
| 0015 | 702-03-00100 | Catch Basins (CB-01) | 17 | EACH | 2,050.00 | 34,850.00 | 2,000.00 | 34,000.00 | 1,725.00 | 29,325.00 |
| 0016 | 702-03-00400 | Catch Basins (CB-05) | 2 | EACH | 750.00 | 1,500.00 | 2,500.00 | 5,000.00 | 431.25 | 862.50 |
| 0017 | 706-01-00100 | Concrete Walk (4" Thick) | 790 | SQYD | 50.00 | 39,500.00 | 50.00 | 39,500.00 | 70.36 | 55,584.40 |
| 0018 | 706-02-00200 | Concrete Drive (6" Thick) | 140 | SQYD | 60.00 | 8,400.00 | 70.00 | 9,800.00 | 86.25 | 12,075.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 6,004.15 | 6,004.15 |
| 0020 | 727-01-00100 | Mobilization | 1 | LUMP | 17,500.00 | 17,500.00 | 29,000.00 | 29,000.00 | 9,832.50 | 9,832.50 |
| 0021 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 260 | LNFT | 8.80 | 2,288.00 | 10.00 | 2,600.00 | 3.45 | 897.00 |
| 0022 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 48 | LNFT | 26.40 | 1,267.20 | 15.00 | 720.00 | 11.50 | 552.00 |
| 0023 | 739-01-00100 | Hydro-Seeding | 0.3 | ACRE | 4,000.00 | 1,200.00 | 3,000.00 | 900.00 | 4,140.00 | 1,242.00 |
| 0024 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 3,000.00 | 3,000.00 | 2,875.00 | 2,875.00 |
| 0025 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 250 | INLF | 1.25 | 312.50 | 2.00 | 500.00 | 0.86 | 215.00 |
| 0026 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 900 | INLF | 1.35 | 1,215.00 | 1.00 | 900.00 | 1.15 | 1,035.00 |
| CONTRACTOR TOTAL | 194,686.70 | 217,255.00 | 233,148.63 | |||||||