Bid Tabulations
Letting of
12/12/2012
LA DOTD Headquarters
| Lead Project: H.006317.6 | |
| Parish: Tensas | |
| Routes: | |
| Description: DUNBAR ROAD BRIDGE OVER BAYOU VIDAL | |
| Type Const: GRADING, PRECAST-PRESTRESSED CONCRETE GIRDER SPAN BRIDGE AND RELATED WORK. | |
| Estimated Construction Cost: $817,397.30 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 55519 | Key, LLC Of Mississippi | $863,611.70 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $936,827.60 |
| 3 | 49239 | WL Bass Construction Inc. | $994,336.40 |
| 4 | 23112 | Ben Allen, Inc. | $1,227,174.80 |
| 5 | 00044 | Guinn Construction, LLC | $1,394,393.25 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Key, LLC Of Mississippi |
- 2 - Gilchrist Construction Co. LLC |
- 3 - WL Bass Construction Inc. |
- 4 - Ben Allen, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA. 16+05 - 21' X171' TIMBER BRIDGE) | 1 | EACH | 10,000.00 | 10,000.00 | 13,000.00 | 13,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 202-02-12000 | Removal of Fence | 118 | LNFT | 5.00 | 590.00 | 4.00 | 472.00 | 5.00 | 590.00 | 10.00 | 1,180.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 75,000.00 | 75,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 25.00 | 200.00 | 20.00 | 160.00 | 1.00 | 8.00 | 0.00 | 0.00 |
| 0006 | 204-03-00100 | Temporary Slope Drains | 280 | LNFT | 10.00 | 2,800.00 | 5.00 | 1,400.00 | 1.00 | 280.00 | 0.00 | 0.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 175.00 | 525.00 | 250.00 | 750.00 | 1.00 | 3.00 | 0.00 | 0.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 1,064 | LNFT | 2.50 | 2,660.00 | 1.20 | 1,276.80 | 0.10 | 106.40 | 5.00 | 5,320.00 |
| 0009 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 105.2 | CUYD | 100.00 | 10,520.00 | 95.00 | 9,994.00 | 85.00 | 8,942.00 | 150.00 | 15,780.00 |
| 0010 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 85.00 | 8,500.00 | 84.00 | 8,400.00 | 85.00 | 8,500.00 | 75.00 | 7,500.00 |
| 0011 | 704-09-00100 | Guard Rail Anchor Sections (Turndown) | 100 | LNFT | 40.00 | 4,000.00 | 40.00 | 4,000.00 | 35.00 | 3,500.00 | 75.00 | 7,500.00 |
| 0012 | 705-01-00100 | Barbed Wire Fence | 146 | LNFT | 15.00 | 2,190.00 | 16.00 | 2,336.00 | 10.00 | 1,460.00 | 20.00 | 2,920.00 |
| 0013 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 676 | SQYD | 70.00 | 47,320.00 | 70.00 | 47,320.00 | 65.00 | 43,940.00 | 85.00 | 57,460.00 |
| 0014 | 711-04-00100 | Geotextile Fabric | 676 | SQYD | 4.00 | 2,704.00 | 1.50 | 1,014.00 | 3.00 | 2,028.00 | 5.00 | 3,380.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 7,500.00 | 7,500.00 |
| 0016 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 1,800.00 | 720.00 | 2,800.00 | 1,120.00 | 2,000.00 | 800.00 | 1,000.00 | 400.00 |
| 0017 | 717-01-00100 | Seeding | 9 | LB | 30.00 | 270.00 | 55.00 | 495.00 | 20.00 | 180.00 | 50.00 | 450.00 |
| 0018 | 718-01-00100 | Fertilizer | 190 | LB | 3.00 | 570.00 | 2.30 | 437.00 | 1.00 | 190.00 | 5.00 | 950.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 93,000.00 | 93,000.00 | 85,000.00 | 85,000.00 | 120,000.00 | 120,000.00 |
| 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 85.00 | 680.00 | 90.00 | 720.00 | 85.00 | 680.00 | 100.00 | 800.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 23,000.00 | 23,000.00 | 20,000.00 | 20,000.00 |
| 0022 | 804-01-00600 | Precast Concrete Piles (24") | 1,536 | LNFT | 135.00 | 207,360.00 | 118.00 | 181,248.00 | 165.00 | 253,440.00 | 225.00 | 345,600.00 |
| 0023 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 1.00 | 1.00 | 0.00 | 0.00 |
| 0024 | 805-01-00700 | Class A Concrete (Bents) | 52.97 | CUYD | 885.00 | 46,878.45 | 1,500.00 | 79,455.00 | 1,000.00 | 52,970.00 | 1,500.00 | 79,455.00 |
| 0025 | 805-03-00100 | Class AA Concrete | 130.75 | CUYD | 925.00 | 120,943.75 | 1,000.00 | 130,750.00 | 1,300.00 | 169,975.00 | 1,500.00 | 196,125.00 |
| 0026 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 987.5 | LNFT | 85.00 | 83,937.50 | 75.00 | 74,062.50 | 80.00 | 79,000.00 | 125.00 | 123,437.50 |
| 0027 | 806-01-00100 | Deformed Reinforcing Steel | 46,743 | LB | 1.00 | 46,743.00 | 1.10 | 51,417.30 | 1.00 | 46,743.00 | 1.10 | 51,417.30 |
| 0028 | 807-08-00100 | Structural Metalwork (3050 LBS.) | 1 | LUMP | 30,000.00 | 30,000.00 | 30,000.00 | 30,000.00 | 21,000.00 | 21,000.00 | 30,000.00 | 30,000.00 |
| 0029 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 400 | LNFT | 75.00 | 30,000.00 | 90.00 | 36,000.00 | 70.00 | 28,000.00 | 100.00 | 40,000.00 |
| 0030 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY; 90 DEG CROSSING; W/O ASPHALT; TANGENT) | 1 | EACH | 15,000.00 | 15,000.00 | 13,000.00 | 13,000.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 |
| 0031 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY; 90 DEG CROSSING; (W/O ASPHALT; CURVED) | 1 | EACH | 15,000.00 | 15,000.00 | 13,000.00 | 13,000.00 | 12,000.00 | 12,000.00 | 15,000.00 | 15,000.00 |
| CONTRACTOR TOTAL | 863,611.70 | 936,827.60 | 994,336.40 | 1,227,174.80 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Guinn Construction, LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 18,000.00 | 18,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA. 16+05 - 21' X171' TIMBER BRIDGE) | 1 | EACH | 22,000.00 | 22,000.00 |
| 0003 | 202-02-12000 | Removal of Fence | 118 | LNFT | 10.00 | 1,180.00 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 10.00 | 80.00 |
| 0006 | 204-03-00100 | Temporary Slope Drains | 280 | LNFT | 1.00 | 280.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 3 | EACH | 500.00 | 1,500.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 1,064 | LNFT | 2.00 | 2,128.00 |
| 0009 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 105.2 | CUYD | 100.00 | 10,520.00 |
| 0010 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 85.00 | 8,500.00 |
| 0011 | 704-09-00100 | Guard Rail Anchor Sections (Turndown) | 100 | LNFT | 45.00 | 4,500.00 |
| 0012 | 705-01-00100 | Barbed Wire Fence | 146 | LNFT | 15.00 | 2,190.00 |
| 0013 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 676 | SQYD | 85.00 | 57,460.00 |
| 0014 | 711-04-00100 | Geotextile Fabric | 676 | SQYD | 8.00 | 5,408.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,500.00 | 10,500.00 |
| 0016 | 716-01-00100 | Mulch (Vegetative) | 0.4 | TON | 2,000.00 | 800.00 |
| 0017 | 717-01-00100 | Seeding | 9 | LB | 25.00 | 225.00 |
| 0018 | 718-01-00100 | Fertilizer | 190 | LB | 1.00 | 190.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 300,000.00 | 300,000.00 |
| 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 16,000.00 | 16,000.00 |
| 0022 | 804-01-00600 | Precast Concrete Piles (24") | 1,536 | LNFT | 200.00 | 307,200.00 |
| 0023 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 |
| 0024 | 805-01-00700 | Class A Concrete (Bents) | 52.97 | CUYD | 2,000.00 | 105,940.00 |
| 0025 | 805-03-00100 | Class AA Concrete | 130.75 | CUYD | 1,500.00 | 196,125.00 |
| 0026 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 987.5 | LNFT | 125.00 | 123,437.50 |
| 0027 | 806-01-00100 | Deformed Reinforcing Steel | 46,743 | LB | 1.25 | 58,428.75 |
| 0028 | 807-08-00100 | Structural Metalwork (3050 LBS.) | 1 | LUMP | 26,000.00 | 26,000.00 |
| 0029 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 400 | LNFT | 100.00 | 40,000.00 |
| 0030 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY; 90 DEG CROSSING; W/O ASPHALT; TANGENT) | 1 | EACH | 25,000.00 | 25,000.00 |
| 0031 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY; 90 DEG CROSSING; (W/O ASPHALT; CURVED) | 1 | EACH | 25,000.00 | 25,000.00 |
| CONTRACTOR TOTAL | 1,394,393.25 | |||||