Bid Tabulations
Letting of
05/22/2013
LA DOTD Headquarters
| Lead Project: H.006292.6 | |
| Parish: St. Martin | |
| Routes: | |
| Description: LION CASTILLE ROAD BRIDGE OVER BAYOU PORTAGE GUIDRY | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PORTLAND CEMENT CONCRETE SLAB SPAN BRIDGE AND RELATED WORK. | |
| Estimated Construction Cost: $442,189.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 01012 | Cecil D. Gassiott, LLC | $375,451.76 |
| 2 | 00044 | Guinn Construction, LLC | $397,704.00 |
| 3 | 08815 | W. E. Mcdonald & Son, LLC. | $398,657.50 |
| 4 | 00481 | Coastal Bridge Co., L.L.C. | $408,887.50 |
| 5 | 40312 | Gray Construction Corp. | $417,270.75 |
| 6 | 39462 | Jb James Construction Llc | $458,840.50 |
| 7 | 56288 | Guinn Services, LLC | $530,431.60 |
| 8 | 27634 | Phylway Construction Llc | $756,051.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Cecil D. Gassiott, LLC |
- 2 - Guinn Construction, LLC |
- 3 - W. E. Mcdonald & Son, LLC. |
- 4 - Coastal Bridge Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 2,880.00 | 2,880.00 | 4,000.00 | 4,000.00 | 7,500.00 | 7,500.00 | 2,500.00 | 2,500.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 15+23; 20.25' X 46' TIMBER BRIDGE | 1 | EACH | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 31,800.00 | 31,800.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 16,000.00 | 16,000.00 | 15,000.00 | 15,000.00 | 8,500.00 | 8,500.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 16.50 | 165.00 | 10.00 | 100.00 | 10.00 | 100.00 | 17.00 | 170.00 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 165.00 | 990.00 | 100.00 | 600.00 | 250.00 | 1,500.00 | 165.00 | 990.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 1,068 | LNFT | 1.87 | 1,997.16 | 1.75 | 1,869.00 | 2.00 | 2,136.00 | 2.00 | 2,136.00 |
| 0007 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 60 | CUYD | 62.00 | 3,720.00 | 85.00 | 5,100.00 | 1.00 | 60.00 | 95.00 | 5,700.00 |
| 0008 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 48 | LNFT | 125.00 | 6,000.00 | 96.00 | 4,608.00 | 120.00 | 5,760.00 | 95.00 | 4,560.00 |
| 0009 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 110 | LNFT | 55.00 | 6,050.00 | 80.00 | 8,800.00 | 59.00 | 6,490.00 | 58.50 | 6,435.00 |
| 0010 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 145 | LNFT | 66.00 | 9,570.00 | 114.00 | 16,530.00 | 79.00 | 11,455.00 | 70.00 | 10,150.00 |
| 0011 | 701-05-01120 | Side Drain Pipe (42" RCP/PP/CMP) | 90 | LNFT | 95.00 | 8,550.00 | 155.00 | 13,950.00 | 105.00 | 9,450.00 | 115.00 | 10,350.00 |
| 0012 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 20 | LNFT | 110.00 | 2,200.00 | 90.00 | 1,800.00 | 59.00 | 1,180.00 | 58.50 | 1,170.00 |
| 0013 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 20 | LNFT | 120.00 | 2,400.00 | 110.00 | 2,200.00 | 79.00 | 1,580.00 | 70.00 | 1,400.00 |
| 0014 | 701-05-02120 | Side Drain Pipe (Erosion) (42" PP/CMP) | 20 | LNFT | 140.00 | 2,800.00 | 140.00 | 2,800.00 | 105.00 | 2,100.00 | 115.00 | 2,300.00 |
| 0015 | 701-15-00100 | Concrete Collar | 3 | EACH | 750.00 | 2,250.00 | 1,500.00 | 4,500.00 | 1,000.00 | 3,000.00 | 450.00 | 1,350.00 |
| 0016 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 5,000.00 | 5,000.00 | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 4,500.00 | 4,500.00 |
| 0017 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 3,000.00 | 12,000.00 | 2,650.00 | 10,600.00 | 2,450.00 | 9,800.00 | 2,600.00 | 10,400.00 |
| 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 554 | SQYD | 50.00 | 27,700.00 | 60.00 | 33,240.00 | 65.00 | 36,010.00 | 62.00 | 34,348.00 |
| 0019 | 711-04-00100 | Geotextile Fabric | 554 | SQYD | 3.00 | 1,662.00 | 3.00 | 1,662.00 | 3.00 | 1,662.00 | 2.00 | 1,108.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,042.50 | 4,042.50 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 3,500.00 | 3,500.00 |
| 0021 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 1,540.00 | 770.00 | 2,000.00 | 1,000.00 | 5,000.00 | 2,500.00 | 1,500.00 | 750.00 |
| 0022 | 717-01-00100 | Seeding | 12 | LB | 27.50 | 330.00 | 10.00 | 120.00 | 50.00 | 600.00 | 28.00 | 336.00 |
| 0023 | 718-01-00100 | Fertilizer | 260 | LB | 2.25 | 585.00 | 1.00 | 260.00 | 5.00 | 1,300.00 | 2.00 | 520.00 |
| 0024 | 726-01-00100 | Bedding Material | 14.3 | CUYD | 75.00 | 1,072.50 | 100.00 | 1,430.00 | 85.00 | 1,215.50 | 115.00 | 1,644.50 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 22,000.00 | 22,000.00 | 28,000.00 | 28,000.00 | 28,000.00 | 28,000.00 | 25,000.00 | 25,000.00 |
| 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 | 100.00 | 400.00 | 81.00 | 324.00 | 90.00 | 360.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 | 4,500.00 | 4,500.00 | 7,000.00 | 7,000.00 |
| 0028 | 804-01-00200 | Precast Concrete Piles (14") | 1,580 | LNFT | 51.89 | 81,986.20 | 50.00 | 79,000.00 | 54.00 | 85,320.00 | 53.00 | 83,740.00 |
| 0029 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | 250.00 | 250.00 |
| 0030 | 805-10-02200 | Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) | 4 | SPAN | 29,500.00 | 118,000.00 | 30,000.00 | 120,000.00 | 29,000.00 | 116,000.00 | 30,000.00 | 120,000.00 |
| 0031 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY, 75 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 6,800.00 | 13,600.00 | 9,000.00 | 18,000.00 | 9,000.00 | 18,000.00 | 9,500.00 | 19,000.00 |
| 0032 | 202-02-38500 | Removal of Surfacing and Stablized Base | 435 | SQYD | 3.84 | 1,670.40 | 4.00 | 1,740.00 | 10.00 | 4,350.00 | 8.00 | 3,480.00 |
| 0033 | 302-01-00700 | Class II Base Course (Stone) | 28.4 | CUYD | 100.00 | 2,840.00 | 85.00 | 2,414.00 | 160.00 | 4,544.00 | 100.00 | 2,840.00 |
| 0034 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 240 | INLF | 3.00 | 720.00 | 2.00 | 480.00 | 3.00 | 720.00 | 2.50 | 600.00 |
| CONTRACTOR TOTAL | 375,451.76 | 397,704.00 | 398,657.50 | 408,887.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Gray Construction Corp. |
- 6 - Jb James Construction Llc |
- 7 - Guinn Services, LLC |
- 8 - Phylway Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 2,000.00 | 2,000.00 | 21,000.00 | 21,000.00 | 8,500.00 | 8,500.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 15+23; 20.25' X 46' TIMBER BRIDGE | 1 | EACH | 10,200.00 | 10,200.00 | 12,000.00 | 12,000.00 | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 32,000.00 | 32,000.00 | 21,000.00 | 21,000.00 | 50,000.00 | 50,000.00 | 25,000.00 | 25,000.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 10 | EACH | 15.00 | 150.00 | 26.00 | 260.00 | 250.00 | 2,500.00 | 75.00 | 750.00 |
| 0005 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 6 | EACH | 150.00 | 900.00 | 165.00 | 990.00 | 300.00 | 1,800.00 | 185.00 | 1,110.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 1,068 | LNFT | 1.70 | 1,815.60 | 2.25 | 2,403.00 | 3.95 | 4,218.60 | 2.50 | 2,670.00 |
| 0007 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 60 | CUYD | 104.00 | 6,240.00 | 81.00 | 4,860.00 | 165.00 | 9,900.00 | 290.00 | 17,400.00 |
| 0008 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 48 | LNFT | 76.40 | 3,667.20 | 120.00 | 5,760.00 | 150.00 | 7,200.00 | 200.00 | 9,600.00 |
| 0009 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 110 | LNFT | 57.00 | 6,270.00 | 70.00 | 7,700.00 | 60.00 | 6,600.00 | 115.00 | 12,650.00 |
| 0010 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 145 | LNFT | 70.00 | 10,150.00 | 78.00 | 11,310.00 | 88.00 | 12,760.00 | 124.00 | 17,980.00 |
| 0011 | 701-05-01120 | Side Drain Pipe (42" RCP/PP/CMP) | 90 | LNFT | 100.00 | 9,000.00 | 100.00 | 9,000.00 | 142.00 | 12,780.00 | 210.00 | 18,900.00 |
| 0012 | 701-05-02060 | Side Drain Pipe (Erosion) (24" PP/CMP) | 20 | LNFT | 58.15 | 1,163.00 | 75.00 | 1,500.00 | 75.00 | 1,500.00 | 115.00 | 2,300.00 |
| 0013 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 20 | LNFT | 66.50 | 1,330.00 | 110.00 | 2,200.00 | 95.00 | 1,900.00 | 124.00 | 2,480.00 |
| 0014 | 701-05-02120 | Side Drain Pipe (Erosion) (42" PP/CMP) | 20 | LNFT | 97.80 | 1,956.00 | 125.00 | 2,500.00 | 138.00 | 2,760.00 | 210.00 | 4,200.00 |
| 0015 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,560.00 | 4,680.00 | 900.00 | 2,700.00 | 1,000.00 | 3,000.00 | 3,000.00 | 9,000.00 |
| 0016 | 702-03-00200 | Catch Basins (CB-02) | 1 | EACH | 3,500.00 | 3,500.00 | 5,500.00 | 5,500.00 | 4,500.00 | 4,500.00 | 8,000.00 | 8,000.00 |
| 0017 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,400.00 | 9,600.00 | 2,400.00 | 9,600.00 | 2,400.00 | 9,600.00 | 4,500.00 | 18,000.00 |
| 0018 | 711-01-04000 | Riprap (55 lb, 18" Thick) | 554 | SQYD | 71.00 | 39,334.00 | 62.00 | 34,348.00 | 60.00 | 33,240.00 | 118.00 | 65,372.00 |
| 0019 | 711-04-00100 | Geotextile Fabric | 554 | SQYD | 2.90 | 1,606.60 | 7.00 | 3,878.00 | 4.00 | 2,216.00 | 6.00 | 3,324.00 |
| 0020 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,350.00 | 4,350.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 | 20,000.00 | 20,000.00 |
| 0021 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 1,400.00 | 700.00 | 1,400.00 | 700.00 | 1,000.00 | 500.00 | 3,000.00 | 1,500.00 |
| 0022 | 717-01-00100 | Seeding | 12 | LB | 25.00 | 300.00 | 25.00 | 300.00 | 25.00 | 300.00 | 42.00 | 504.00 |
| 0023 | 718-01-00100 | Fertilizer | 260 | LB | 2.00 | 520.00 | 2.00 | 520.00 | 1.50 | 390.00 | 6.75 | 1,755.00 |
| 0024 | 726-01-00100 | Bedding Material | 14.3 | CUYD | 124.50 | 1,780.35 | 80.00 | 1,144.00 | 100.00 | 1,430.00 | 1,100.00 | 15,730.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 33,300.00 | 33,300.00 | 45,000.00 | 45,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 |
| 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 85.00 | 340.00 | 200.00 | 800.00 | 130.00 | 520.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 | 7,000.00 | 7,000.00 | 45,000.00 | 45,000.00 |
| 0028 | 804-01-00200 | Precast Concrete Piles (14") | 1,580 | LNFT | 52.05 | 82,239.00 | 50.00 | 79,000.00 | 65.00 | 102,700.00 | 44.00 | 69,520.00 |
| 0029 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 100.00 | 100.00 | 1.00 | 1.00 | 1,700.00 | 1,700.00 |
| 0030 | 805-10-02200 | Bridge Superstructure and Substructure (28' Clear Roadway; 75 Degree Crossing) | 4 | SPAN | 31,350.00 | 125,400.00 | 35,000.00 | 140,000.00 | 35,000.00 | 140,000.00 | 40,000.00 | 160,000.00 |
| 0031 | NS-800-00040 | Concrete Approach Slabs (28' CLR RDWY, 75 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 7,000.00 | 14,000.00 | 7,000.00 | 14,000.00 | 11,000.00 | 22,000.00 | 38,000.00 | 76,000.00 |
| 0032 | 202-02-38500 | Removal of Surfacing and Stablized Base | 435 | SQYD | 4.40 | 1,914.00 | 6.50 | 2,827.50 | 10.00 | 4,350.00 | 26.00 | 11,310.00 |
| 0033 | 302-01-00700 | Class II Base Course (Stone) | 28.4 | CUYD | 137.50 | 3,905.00 | 200.00 | 5,680.00 | 165.00 | 4,686.00 | 290.00 | 8,236.00 |
| 0034 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 240 | INLF | 1.50 | 360.00 | 3.00 | 720.00 | 20.00 | 4,800.00 | 2.25 | 540.00 |
| CONTRACTOR TOTAL | 417,270.75 | 458,840.50 | 530,431.60 | 756,051.00 | ||||||||