06/27/2012
LA DOTD Headquarters
| Lead Project: H.006288.6 | |
| Parish: St. Landry | |
| Routes: | |
| Description: PRAYER HOUSE ROAD BRIDGE OVER BAYOU BELLEVIEW | |
| Type Const: GRADING, PORTLAND CEMENT CONCRETE SLAB SPAN BRIDGE AND RELATED WORK. | |
| Estimated Construction Cost: $304,286.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00044 | Guinn Construction, LLC | $256,790.50 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $262,939.80 |
| 3 | 56288 | Guinn Services, LLC | $298,015.75 |
| 4 | 01012 | Cecil D. Gassiott, LLC | $316,073.50 |
| 5 | 39462 | Jb James Construction Llc | $352,972.00 |
| 6 | 40312 | Gray Construction Corp. | $363,324.70 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Guinn Construction, LLC |
- 2 - Coastal Bridge Co., L.L.C. |
- 3 - Guinn Services, LLC |
- 4 - Cecil D. Gassiott, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 11,000.00 | 11,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 15+17.50; 18.25' X 35' TIMBER BRIDGE | 1 | EACH | 4,500.00 | 4,500.00 | 13,400.00 | 13,400.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 9,000.00 | 9,000.00 | 17,500.00 | 17,500.00 | 25,000.00 | 25,000.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 4 | EACH | 10.00 | 40.00 | 16.50 | 66.00 | 25.00 | 100.00 | 9.00 | 36.00 |
| 0005 | 204-03-00100 | Temporary Slope Drains | 160 | LNFT | 0.00 | 0.00 | 9.00 | 1,440.00 | 15.00 | 2,400.00 | 15.00 | 2,400.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 100.00 | 400.00 | 165.00 | 660.00 | 150.00 | 600.00 | 180.00 | 720.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 1,067 | LNFT | 1.50 | 1,600.50 | 2.00 | 2,134.00 | 2.25 | 2,400.75 | 2.50 | 2,667.50 |
| 0008 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 104.4 | CUYD | 80.00 | 8,352.00 | 77.00 | 8,038.80 | 110.00 | 11,484.00 | 100.00 | 10,440.00 |
| 0009 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 120.00 | 12,000.00 | 50.00 | 5,000.00 | 65.00 | 6,500.00 | 47.00 | 4,700.00 |
| 0010 | 704-09-00100 | Guard Rail Anchor Sections (Turndown) | 100 | LNFT | 40.00 | 4,000.00 | 72.00 | 7,200.00 | 72.00 | 7,200.00 | 67.00 | 6,700.00 |
| 0011 | 705-01-00100 | Barbed Wire Fence | 95 | LNFT | 10.00 | 950.00 | 12.00 | 1,140.00 | 10.00 | 950.00 | 8.00 | 760.00 |
| 0012 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 150 | LNFT | 15.00 | 2,250.00 | 15.00 | 2,250.00 | 15.00 | 2,250.00 | 12.00 | 1,800.00 |
| 0013 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 410 | SQYD | 60.00 | 24,600.00 | 52.00 | 21,320.00 | 65.00 | 26,650.00 | 65.00 | 26,650.00 |
| 0014 | 711-04-00100 | Geotextile Fabric | 410 | SQYD | 5.00 | 2,050.00 | 2.00 | 820.00 | 4.00 | 1,640.00 | 4.50 | 1,845.00 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,000.00 | 6,000.00 | 4,200.00 | 4,200.00 | 8,500.00 | 8,500.00 | 6,000.00 | 6,000.00 |
| 0016 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 2,500.00 | 500.00 | 4,400.00 | 880.00 | 2,000.00 | 400.00 | 2,000.00 | 400.00 |
| 0017 | 717-01-00100 | Seeding | 5 | LB | 25.00 | 125.00 | 33.00 | 165.00 | 40.00 | 200.00 | 25.00 | 125.00 |
| 0018 | 718-01-00100 | Fertilizer | 110 | LB | 1.00 | 110.00 | 5.00 | 550.00 | 2.00 | 220.00 | 1.00 | 110.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 20,000.00 | 20,000.00 | 26,000.00 | 26,000.00 | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 |
| 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 100.00 | 800.00 | 110.00 | 880.00 | 75.00 | 600.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,000.00 | 3,000.00 | 7,000.00 | 7,000.00 | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 |
| 0022 | 804-01-00200 | Precast Concrete Piles (14") | 756 | LNFT | 52.00 | 39,312.00 | 46.00 | 34,776.00 | 65.00 | 49,140.00 | 70.00 | 52,920.00 |
| 0023 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 100.00 | 100.00 | 1.00 | 1.00 | 1,000.00 | 1,000.00 |
| 0024 | 805-10-01360 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Precast) | 3 | SPAN | 28,000.00 | 84,000.00 | 28,000.00 | 84,000.00 | 29,500.00 | 88,500.00 | 29,000.00 | 87,000.00 |
| 0025 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 8,500.00 | 17,000.00 | 9,000.00 | 18,000.00 | 8,000.00 | 16,000.00 | 7,500.00 | 15,000.00 |
| 0026 | NS-804-00001 | Vibration Monitoring INCLUDES INITIAL SITE SURVEY | 12 | EACH | 600.00 | 7,200.00 | 500.00 | 6,000.00 | 250.00 | 3,000.00 | 350.00 | 4,200.00 |
| CONTRACTOR TOTAL | 256,790.50 | 262,939.80 | 298,015.75 | 316,073.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Jb James Construction Llc |
- 6 - Gray Construction Corp. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 40,000.00 | 40,000.00 | 12,000.00 | 12,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 15+17.50; 18.25' X 35' TIMBER BRIDGE | 1 | EACH | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 24,000.00 | 24,000.00 | 20,000.00 | 20,000.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 4 | EACH | 15.00 | 60.00 | 15.00 | 60.00 |
| 0005 | 204-03-00100 | Temporary Slope Drains | 160 | LNFT | 13.00 | 2,080.00 | 11.00 | 1,760.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 4 | EACH | 150.00 | 600.00 | 150.00 | 600.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 1,067 | LNFT | 2.00 | 2,134.00 | 1.80 | 1,920.60 |
| 0008 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 104.4 | CUYD | 100.00 | 10,440.00 | 114.00 | 11,901.60 |
| 0009 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 45.00 | 4,500.00 | 45.00 | 4,500.00 |
| 0010 | 704-09-00100 | Guard Rail Anchor Sections (Turndown) | 100 | LNFT | 65.00 | 6,500.00 | 65.00 | 6,500.00 |
| 0011 | 705-01-00100 | Barbed Wire Fence | 95 | LNFT | 10.00 | 950.00 | 11.00 | 1,045.00 |
| 0012 | 705-02-00100 | Combination Mesh & Barbed Wire Fence | 150 | LNFT | 12.00 | 1,800.00 | 13.50 | 2,025.00 |
| 0013 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 410 | SQYD | 58.00 | 23,780.00 | 95.00 | 38,950.00 |
| 0014 | 711-04-00100 | Geotextile Fabric | 410 | SQYD | 2.00 | 820.00 | 3.15 | 1,291.50 |
| 0015 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 7,000.00 | 7,000.00 | 4,575.00 | 4,575.00 |
| 0016 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 4,000.00 | 800.00 | 4,000.00 | 800.00 |
| 0017 | 717-01-00100 | Seeding | 5 | LB | 30.00 | 150.00 | 30.00 | 150.00 |
| 0018 | 718-01-00100 | Fertilizer | 110 | LB | 5.00 | 550.00 | 5.00 | 550.00 |
| 0019 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 26,800.00 | 26,800.00 |
| 0020 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 100.00 | 800.00 |
| 0021 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 6,700.00 | 6,700.00 |
| 0022 | 804-01-00200 | Precast Concrete Piles (14") | 756 | LNFT | 68.00 | 51,408.00 | 116.00 | 87,696.00 |
| 0023 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 100.00 | 100.00 | 100.00 | 100.00 |
| 0024 | 805-10-01360 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) (Precast) | 3 | SPAN | 35,000.00 | 105,000.00 | 34,400.00 | 103,200.00 |
| 0025 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT) | 2 | EACH | 7,000.00 | 14,000.00 | 9,100.00 | 18,200.00 |
| 0026 | NS-804-00001 | Vibration Monitoring INCLUDES INITIAL SITE SURVEY | 12 | EACH | 250.00 | 3,000.00 | 100.00 | 1,200.00 |
| CONTRACTOR TOTAL | 352,972.00 | 363,324.70 | ||||||