Bid Tabulations
Letting of
05/30/2012
LA DOTD Headquarters
| Lead Project: H.006173.6 | |
| Parish: Morehouse | |
| Routes: | |
| Description: LOUIS WHITE ROAD BRIDGE | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CONCRETE SLAB SPAN BRIDGE, AND RELATED WORK | |
| Estimated Construction Cost: $234,846.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 14788 | Louisiana Bridge, Inc. | $193,082.20 |
| 2 | 49864 | Terral Construction LLC | $214,838.00 |
| 3 | 00044 | Guinn Construction, LLC | $243,595.00 |
| 4 | 49239 | W L Bass Construction Inc. | $244,556.00 |
| 5 | 56288 | Guinn Services, LLC | $252,214.00 |
| 6 | 01012 | Cecil D. Gassiott, LLC | $280,809.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Louisiana Bridge, Inc. |
- 2 - Terral Construction LLC |
- 3 - Guinn Construction, LLC |
- 4 - W L Bass Construction Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,600.00 | 1,600.00 | 7,500.00 | 7,500.00 | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA 105+15; 24.1'X45' TIMBER BRIDGE) | 1 | EACH | 2,500.00 | 2,500.00 | 4,000.00 | 4,000.00 | 6,000.00 | 6,000.00 | 3,500.00 | 3,500.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,850.00 | 10,850.00 | 11,000.00 | 11,000.00 | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 22 | EACH | 9.00 | 198.00 | 20.00 | 440.00 | 10.00 | 220.00 | 1.00 | 22.00 |
| 0005 | 204-03-00100 | Temporary Slope Drains | 20 | LNFT | 8.00 | 160.00 | 10.00 | 200.00 | 0.00 | 0.00 | 1.00 | 20.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 37.00 | 74.00 | 100.00 | 200.00 | 100.00 | 200.00 | 1.00 | 2.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 65 | LNFT | 3.00 | 195.00 | 2.00 | 130.00 | 5.00 | 325.00 | 1.00 | 65.00 |
| 0008 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 75.4 | CUYD | 105.00 | 7,917.00 | 150.00 | 11,310.00 | 85.00 | 6,409.00 | 95.00 | 7,163.00 |
| 0009 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 36 | LNFT | 80.00 | 2,880.00 | 46.00 | 1,656.00 | 100.00 | 3,600.00 | 75.00 | 2,700.00 |
| 0010 | 705-01-00100 | Barbed Wire Fence | 15 | LNFT | 20.00 | 300.00 | 10.00 | 150.00 | 50.00 | 750.00 | 25.00 | 375.00 |
| 0011 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 256 | SQYD | 50.00 | 12,800.00 | 66.00 | 16,896.00 | 70.00 | 17,920.00 | 65.00 | 16,640.00 |
| 0012 | 711-04-00100 | Geotextile Fabric | 256 | SQYD | 2.50 | 640.00 | 2.00 | 512.00 | 5.00 | 1,280.00 | 3.00 | 768.00 |
| 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 2,500.00 | 2,500.00 | 8,000.00 | 8,000.00 | 6,000.00 | 6,000.00 | 8,500.00 | 8,500.00 |
| 0014 | 716-01-00100 | Mulch (Vegetative) | 0.6 | TON | 400.00 | 240.00 | 1,500.00 | 900.00 | 2,000.00 | 1,200.00 | 2,000.00 | 1,200.00 |
| 0015 | 717-01-00100 | Seeding | 14 | LB | 5.00 | 70.00 | 10.00 | 140.00 | 25.00 | 350.00 | 20.00 | 280.00 |
| 0016 | 718-01-00100 | Fertilizer | 320 | LB | 6.50 | 2,080.00 | 2.00 | 640.00 | 1.00 | 320.00 | 1.00 | 320.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 8,000.00 | 8,000.00 | 12,000.00 | 12,000.00 | 22,500.00 | 22,500.00 | 15,000.00 | 15,000.00 |
| 0018 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 85.15 | 681.20 | 75.00 | 600.00 | 100.00 | 800.00 | 75.00 | 600.00 |
| 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 2,000.00 | 2,000.00 | 5,000.00 | 5,000.00 | 3,500.00 | 3,500.00 | 3,500.00 | 3,500.00 |
| 0020 | 804-01-00200 | Precast Concrete Piles (14") | 612 | LNFT | 58.00 | 35,496.00 | 47.00 | 28,764.00 | 60.00 | 36,720.00 | 75.00 | 45,900.00 |
| 0021 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 0.00 | 0.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| 0022 | 805-10-01300 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) | 3 | SPAN | 28,300.00 | 84,900.00 | 27,600.00 | 82,800.00 | 30,500.00 | 91,500.00 | 32,000.00 | 96,000.00 |
| 0023 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY 90 DEG CROSSING) TAPERED BARRIER RAILS W/O ASPHALT) | 2 | EACH | 8,500.00 | 17,000.00 | 11,000.00 | 22,000.00 | 12,000.00 | 24,000.00 | 10,000.00 | 20,000.00 |
| CONTRACTOR TOTAL | 193,082.20 | 214,838.00 | 243,595.00 | 244,556.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Guinn Services, LLC |
- 6 - Cecil D. Gassiott, LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,500.00 | 5,500.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge (STA 105+15; 24.1'X45' TIMBER BRIDGE) | 1 | EACH | 5,000.00 | 5,000.00 | 10,000.00 | 10,000.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 |
| 0004 | 204-02-00100 | Temporary Hay or Straw Bales | 22 | EACH | 10.00 | 220.00 | 16.00 | 352.00 |
| 0005 | 204-03-00100 | Temporary Slope Drains | 20 | LNFT | 15.00 | 300.00 | 25.00 | 500.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 2 | EACH | 150.00 | 300.00 | 150.00 | 300.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 65 | LNFT | 5.00 | 325.00 | 3.00 | 195.00 |
| 0008 | 403-01-00100 | Aggregate Roadway Surfacing (Vehicular Measurement) | 75.4 | CUYD | 100.00 | 7,540.00 | 100.00 | 7,540.00 |
| 0009 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 36 | LNFT | 65.00 | 2,340.00 | 150.00 | 5,400.00 |
| 0010 | 705-01-00100 | Barbed Wire Fence | 15 | LNFT | 20.00 | 300.00 | 10.00 | 150.00 |
| 0011 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 256 | SQYD | 65.00 | 16,640.00 | 55.00 | 14,080.00 |
| 0012 | 711-04-00100 | Geotextile Fabric | 256 | SQYD | 3.00 | 768.00 | 5.00 | 1,280.00 |
| 0013 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,500.00 | 6,500.00 | 8,500.00 | 8,500.00 |
| 0014 | 716-01-00100 | Mulch (Vegetative) | 0.6 | TON | 2,000.00 | 1,200.00 | 2,500.00 | 1,500.00 |
| 0015 | 717-01-00100 | Seeding | 14 | LB | 20.00 | 280.00 | 20.00 | 280.00 |
| 0016 | 718-01-00100 | Fertilizer | 320 | LB | 1.50 | 480.00 | 1.50 | 480.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 30,000.00 | 30,000.00 | 55,000.00 | 55,000.00 |
| 0018 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 100.00 | 800.00 |
| 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0020 | 804-01-00200 | Precast Concrete Piles (14") | 612 | LNFT | 60.00 | 36,720.00 | 71.00 | 43,452.00 |
| 0021 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 1,000.00 | 1,000.00 |
| 0022 | 805-10-01300 | Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) | 3 | SPAN | 30,000.00 | 90,000.00 | 30,000.00 | 90,000.00 |
| 0023 | NS-800-00040 | Concrete Approach Slabs (24' CLR RDWY 90 DEG CROSSING) TAPERED BARRIER RAILS W/O ASPHALT) | 2 | EACH | 11,000.00 | 22,000.00 | 5,000.00 | 10,000.00 |
| CONTRACTOR TOTAL | 252,214.00 | 280,809.00 | ||||||