Bid Tabulations
Letting of
02/08/2012
LA DOTD Headquarters
| Lead Project: H.006136.6 | |
| Parish: Jefferson | |
| Routes: | |
| Description: METAIRIE COURT BRIDGE OVER CANAL NO. 4 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PORTLAND CEMENT CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $655,804.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 24901 | Hard Rock Construction LLC | $465,809.00 |
| 2 | 48896 | Command Construction Industries LLC | $479,708.00 |
| 3 | 34567 | James Construction Group LLC | $499,317.00 |
| 4 | 00935 | Fleming Construction Co., Inc. | $511,547.20 |
| 5 | 49356 | Kort's Trucking Inc. | $523,011.50 |
| 6 | 46722 | Bld Services Llc | $538,208.50 |
| 7 | 06276 | Barriere Construction Co., LLC | $562,608.62 |
| 8 | 39462 | Jb James Construction Llc | $579,187.10 |
| 9 | 36961 | Cycle Construction Co. L.L.C. | $594,061.90 |
| 10 | 38590 | J.C. Patin Group, LLC | $599,660.40 |
| 11 | 11242 | Gilmore & Son Construction Corp. | $675,366.60 |
| 12 | 38610 | Three C's Properties Inc | $686,199.58 |
| 13 | 12198 | Byron E. Talbot Contractor, Inc. | $709,973.90 |
| 14 | 02179 | Boh Bros. Construction Co., LLC. | $724,599.80 |
| 15 | 04674 | Durr Heavy Construction L.L.C. | $733,971.26 |
| 16 | 04435 | Thigpen Construction Co., Inc. | $777,000.00 |
| 17 | 02074 | Circle, LLC | $806,012.30 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Hard Rock Construction LLC |
- 2 - Command Construction Industries LLC |
- 3 - James Construction Group LLC |
- 4 - Fleming Construction Co., Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 25,000.00 | 25,000.00 | 4,000.00 | 4,000.00 | 27,000.00 | 27,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 105+00.00; 30'X58.3' CONCRETE SLAB SPAN BRIDGE | 1 | EACH | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 25,000.00 | 17,000.00 | 17,000.00 |
| 0003 | 202-02-06020 | Removal of Concrete Box Culverts PARTIAL | 1 | EACH | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 14,000.00 | 14,000.00 | 10,800.00 | 10,800.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 12 | SQYD | 0.00 | 0.00 | 25.00 | 300.00 | 17.00 | 204.00 | 50.00 | 600.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 122 | SQYD | 10.00 | 1,220.00 | 25.00 | 3,050.00 | 27.00 | 3,294.00 | 15.00 | 1,830.00 |
| 0006 | 203-04-00100 | Nonplastic Embankment | 449 | CUYD | 30.00 | 13,470.00 | 10.00 | 4,490.00 | 50.00 | 22,450.00 | 35.00 | 15,715.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 15,000.00 | 15,000.00 | 1,000.00 | 1,000.00 | 15,000.00 | 15,000.00 | 17,000.00 | 17,000.00 |
| 0008 | 203-08-00100 | Geotextile Fabric | 750 | SQYD | 2.00 | 1,500.00 | 1.00 | 750.00 | 2.50 | 1,875.00 | 1.60 | 1,200.00 |
| 0009 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 290.7 | SQYD | 90.00 | 26,163.00 | 100.00 | 29,070.00 | 68.00 | 19,767.60 | 98.00 | 28,488.60 |
| 0010 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 16 | LNFT | 700.00 | 11,200.00 | 40.00 | 640.00 | 79.00 | 1,264.00 | 350.00 | 5,600.00 |
| 0011 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 56 | LNFT | 100.00 | 5,600.00 | 50.00 | 2,800.00 | 90.00 | 5,040.00 | 130.00 | 7,280.00 |
| 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 16 | LNFT | 200.00 | 3,200.00 | 60.00 | 960.00 | 92.00 | 1,472.00 | 218.00 | 3,488.00 |
| 0013 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 6,300.00 | 6,300.00 | 5,600.00 | 5,600.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,000.00 | 4,000.00 | 5,000.00 | 10,000.00 | 3,000.00 | 6,000.00 | 4,200.00 | 8,400.00 |
| 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 79.2 | SQYD | 60.00 | 4,752.00 | 75.00 | 5,940.00 | 60.00 | 4,752.00 | 62.00 | 4,910.40 |
| 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 12.2 | SQYD | 80.00 | 976.00 | 100.00 | 1,220.00 | 215.00 | 2,623.00 | 95.00 | 1,159.00 |
| 0017 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 1,000.00 | 1,000.00 | 1,250.00 | 1,250.00 | 1,350.00 | 1,350.00 | 3,700.00 | 3,700.00 |
| 0018 | 707-01-00200 | Concrete Curb (Barrier) | 118.8 | LNFT | 10.00 | 1,188.00 | 10.00 | 1,188.00 | 30.00 | 3,564.00 | 10.00 | 1,188.00 |
| 0019 | 707-01-00300 | Concrete Curb (Mountable) | 66 | LNFT | 10.00 | 660.00 | 10.00 | 660.00 | 28.00 | 1,848.00 | 15.00 | 990.00 |
| 0020 | 710-01-00100 | Flowable Fill | 200 | CUYD | 200.00 | 40,000.00 | 100.00 | 20,000.00 | 150.00 | 30,000.00 | 145.00 | 29,000.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 4,000.00 | 4,000.00 | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 6,500.00 | 6,500.00 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 500.00 | 100.00 | 6,000.00 | 1,200.00 | 6,000.00 | 1,200.00 | 1,150.00 | 230.00 |
| 0023 | 717-01-00100 | Seeding | 3 | LB | 50.00 | 150.00 | 60.00 | 180.00 | 60.00 | 180.00 | 33.00 | 99.00 |
| 0024 | 718-01-00100 | Fertilizer | 100 | LB | 2.00 | 200.00 | 6.00 | 600.00 | 6.00 | 600.00 | 3.30 | 330.00 |
| 0025 | 726-01-00100 | Bedding Material | 327.9 | CUYD | 100.00 | 32,790.00 | 100.00 | 32,790.00 | 46.00 | 15,083.40 | 108.00 | 35,413.20 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 | 17,000.00 | 17,000.00 | 22,000.00 | 22,000.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 8,000.00 | 8,000.00 | 6,300.00 | 6,300.00 |
| 0028 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 82,500.00 | 82,500.00 |
| 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 640 | INLF | 1.00 | 640.00 | 3.00 | 1,920.00 | 1.25 | 800.00 | 1.10 | 704.00 |
| 0030 | NS-804-00001 | Vibration Monitoring | 22 | EACH | 500.00 | 11,000.00 | 100.00 | 2,200.00 | 75.00 | 1,650.00 | 1.00 | 22.00 |
| 0031 | NS-MSC-00120 | Drainage Structure (RCB 12'X8.5'X60' WITH HEADWALL ON ONE SIDE) | 1 | EACH | 150,000.00 | 150,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 200,000.00 | 154,000.00 | 154,000.00 |
| 0032 | NS-MSC-00120 | Drainage Structure (Temporary Dam Removal & Replacement) | 5 | EACH | 2,000.00 | 10,000.00 | 100.00 | 500.00 | 10,000.00 | 50,000.00 | 2,500.00 | 12,500.00 |
| CONTRACTOR TOTAL | 465,809.00 | 479,708.00 | 499,317.00 | 511,547.20 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Kort's Trucking Inc. |
- 6 - Bld Services Llc |
- 7 - Barriere Construction Co., LLC |
- 8 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 17,000.00 | 17,000.00 | 1,500.00 | 1,500.00 | 5,500.00 | 5,500.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 105+00.00; 30'X58.3' CONCRETE SLAB SPAN BRIDGE | 1 | EACH | 65,000.00 | 65,000.00 | 150,000.00 | 150,000.00 | 13,000.00 | 13,000.00 | 25,000.00 | 25,000.00 |
| 0003 | 202-02-06020 | Removal of Concrete Box Culverts PARTIAL | 1 | EACH | 25,000.00 | 25,000.00 | 8,700.00 | 8,700.00 | 13,000.00 | 13,000.00 | 10,000.00 | 10,000.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 12 | SQYD | 30.00 | 360.00 | 10.00 | 120.00 | 49.00 | 588.00 | 20.00 | 240.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 122 | SQYD | 20.00 | 2,440.00 | 20.00 | 2,440.00 | 45.00 | 5,490.00 | 20.00 | 2,440.00 |
| 0006 | 203-04-00100 | Nonplastic Embankment | 449 | CUYD | 25.00 | 11,225.00 | 28.00 | 12,572.00 | 50.00 | 22,450.00 | 33.00 | 14,817.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 14,000.00 | 14,000.00 | 22,000.00 | 22,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 |
| 0008 | 203-08-00100 | Geotextile Fabric | 750 | SQYD | 2.50 | 1,875.00 | 2.00 | 1,500.00 | 1.60 | 1,200.00 | 2.00 | 1,500.00 |
| 0009 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 290.7 | SQYD | 80.00 | 23,256.00 | 110.00 | 31,977.00 | 74.25 | 21,584.48 | 80.00 | 23,256.00 |
| 0010 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 16 | LNFT | 35.00 | 560.00 | 45.00 | 720.00 | 350.00 | 5,600.00 | 90.00 | 1,440.00 |
| 0011 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 56 | LNFT | 50.00 | 2,800.00 | 55.00 | 3,080.00 | 115.00 | 6,440.00 | 120.00 | 6,720.00 |
| 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 16 | LNFT | 40.00 | 640.00 | 65.00 | 1,040.00 | 410.00 | 6,560.00 | 130.00 | 2,080.00 |
| 0013 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 4,200.00 | 4,200.00 | 11,600.00 | 11,600.00 | 2,200.00 | 2,200.00 | 4,000.00 | 4,000.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,800.00 | 5,600.00 | 4,500.00 | 9,000.00 | 2,200.00 | 4,400.00 | 3,000.00 | 6,000.00 |
| 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 79.2 | SQYD | 55.00 | 4,356.00 | 70.00 | 5,544.00 | 59.25 | 4,692.60 | 50.00 | 3,960.00 |
| 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 12.2 | SQYD | 65.00 | 793.00 | 70.00 | 854.00 | 67.50 | 823.50 | 65.00 | 793.00 |
| 0017 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 1,200.00 | 1,200.00 | 550.00 | 550.00 | 1,500.00 | 1,500.00 | 900.00 | 900.00 |
| 0018 | 707-01-00200 | Concrete Curb (Barrier) | 118.8 | LNFT | 15.00 | 1,782.00 | 19.00 | 2,257.20 | 20.80 | 2,471.04 | 13.00 | 1,544.40 |
| 0019 | 707-01-00300 | Concrete Curb (Mountable) | 66 | LNFT | 15.00 | 990.00 | 11.00 | 726.00 | 21.00 | 1,386.00 | 13.00 | 858.00 |
| 0020 | 710-01-00100 | Flowable Fill | 200 | CUYD | 150.00 | 30,000.00 | 200.00 | 40,000.00 | 150.00 | 30,000.00 | 130.00 | 26,000.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 7,000.00 | 7,000.00 | 12,500.00 | 12,500.00 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 6,000.00 | 1,200.00 | 1,500.00 | 300.00 | 1,800.00 | 360.00 | 6,000.00 | 1,200.00 |
| 0023 | 717-01-00100 | Seeding | 3 | LB | 60.00 | 180.00 | 200.00 | 600.00 | 25.00 | 75.00 | 60.00 | 180.00 |
| 0024 | 718-01-00100 | Fertilizer | 100 | LB | 6.00 | 600.00 | 2.00 | 200.00 | 1.10 | 110.00 | 6.00 | 600.00 |
| 0025 | 726-01-00100 | Bedding Material | 327.9 | CUYD | 55.00 | 18,034.50 | 127.00 | 41,643.30 | 80.00 | 26,232.00 | 53.00 | 17,378.70 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 10,000.00 | 10,000.00 | 21,200.00 | 21,200.00 | 55,000.00 | 55,000.00 | 57,000.00 | 57,000.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 6,000.00 | 6,000.00 | 10,000.00 | 10,000.00 |
| 0028 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 100,000.00 | 100,000.00 | 11,000.00 | 11,000.00 | 28,000.00 | 28,000.00 | 50,000.00 | 50,000.00 |
| 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 640 | INLF | 3.00 | 1,920.00 | 8.00 | 5,120.00 | 1.00 | 640.00 | 2.00 | 1,280.00 |
| 0030 | NS-804-00001 | Vibration Monitoring | 22 | EACH | 500.00 | 11,000.00 | 500.00 | 11,000.00 | 48.00 | 1,056.00 | 250.00 | 5,500.00 |
| 0031 | NS-MSC-00120 | Drainage Structure (RCB 12'X8.5'X60' WITH HEADWALL ON ONE SIDE) | 1 | EACH | 135,000.00 | 135,000.00 | 94,965.00 | 94,965.00 | 226,000.00 | 226,000.00 | 260,000.00 | 260,000.00 |
| 0032 | NS-MSC-00120 | Drainage Structure (Temporary Dam Removal & Replacement) | 5 | EACH | 2,800.00 | 14,000.00 | 700.00 | 3,500.00 | 9,450.00 | 47,250.00 | 2,300.00 | 11,500.00 |
| CONTRACTOR TOTAL | 523,011.50 | 538,208.50 | 562,608.62 | 579,187.10 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Cycle Construction Co. L.L.C. |
- 10 - J.C. Patin Group, LLC |
- 11 - Gilmore & Son Construction Corp. |
- 12 - Three C's Properties Inc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,300.00 | 2,300.00 | 23,210.00 | 23,210.00 | 10,000.00 | 10,000.00 | 14,284.71 | 14,284.71 |
| 0002 | 202-02-04000 | Removal of Bridge STA 105+00.00; 30'X58.3' CONCRETE SLAB SPAN BRIDGE | 1 | EACH | 14,500.00 | 14,500.00 | 19,336.00 | 19,336.00 | 20,000.00 | 20,000.00 | 65,009.93 | 65,009.93 |
| 0003 | 202-02-06020 | Removal of Concrete Box Culverts PARTIAL | 1 | EACH | 4,200.00 | 4,200.00 | 4,356.00 | 4,356.00 | 6,000.00 | 6,000.00 | 48,580.79 | 48,580.79 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 12 | SQYD | 24.00 | 288.00 | 185.00 | 2,220.00 | 50.00 | 600.00 | 64.63 | 775.56 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 122 | SQYD | 11.00 | 1,342.00 | 17.00 | 2,074.00 | 50.00 | 6,100.00 | 34.21 | 4,173.62 |
| 0006 | 203-04-00100 | Nonplastic Embankment | 449 | CUYD | 22.00 | 9,878.00 | 23.00 | 10,327.00 | 24.00 | 10,776.00 | 33.49 | 15,037.01 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 23,000.00 | 23,000.00 | 16,381.00 | 16,381.00 | 18,500.00 | 18,500.00 | 22,707.34 | 22,707.34 |
| 0008 | 203-08-00100 | Geotextile Fabric | 750 | SQYD | 2.00 | 1,500.00 | 2.00 | 1,500.00 | 2.00 | 1,500.00 | 2.58 | 1,935.00 |
| 0009 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 290.7 | SQYD | 97.00 | 28,197.90 | 75.00 | 21,802.50 | 85.00 | 24,709.50 | 89.19 | 25,927.53 |
| 0010 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 16 | LNFT | 120.00 | 1,920.00 | 37.00 | 592.00 | 40.00 | 640.00 | 310.14 | 4,962.24 |
| 0011 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 56 | LNFT | 135.00 | 7,560.00 | 42.00 | 2,352.00 | 60.00 | 3,360.00 | 135.25 | 7,574.00 |
| 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 16 | LNFT | 200.00 | 3,200.00 | 56.00 | 896.00 | 80.00 | 1,280.00 | 226.80 | 3,628.80 |
| 0013 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 5,700.00 | 5,700.00 | 4,678.00 | 4,678.00 | 3,500.00 | 3,500.00 | 5,483.84 | 5,483.84 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 3,100.00 | 6,200.00 | 3,269.00 | 6,538.00 | 25.00 | 50.00 | 3,500.64 | 7,001.28 |
| 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 79.2 | SQYD | 41.00 | 3,247.20 | 26.00 | 2,059.20 | 55.00 | 4,356.00 | 34.13 | 2,703.10 |
| 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 12.2 | SQYD | 140.00 | 1,708.00 | 85.00 | 1,037.00 | 75.00 | 915.00 | 156.47 | 1,908.93 |
| 0017 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 2,100.00 | 2,100.00 | 1,505.00 | 1,505.00 | 1,500.00 | 1,500.00 | 1,520.50 | 1,520.50 |
| 0018 | 707-01-00200 | Concrete Curb (Barrier) | 118.8 | LNFT | 37.00 | 4,395.60 | 16.00 | 1,900.80 | 22.00 | 2,613.60 | 29.08 | 3,454.70 |
| 0019 | 707-01-00300 | Concrete Curb (Mountable) | 66 | LNFT | 40.00 | 2,640.00 | 14.00 | 924.00 | 22.00 | 1,452.00 | 38.46 | 2,538.36 |
| 0020 | 710-01-00100 | Flowable Fill | 200 | CUYD | 137.00 | 27,400.00 | 119.00 | 23,800.00 | 150.00 | 30,000.00 | 117.36 | 23,472.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 6,800.00 | 6,800.00 | 9,052.00 | 9,052.00 | 8,000.00 | 8,000.00 | 8,863.39 | 8,863.39 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 6,100.00 | 1,220.00 | 2,162.00 | 432.40 | 6,000.00 | 1,200.00 | 4.00 | 0.80 |
| 0023 | 717-01-00100 | Seeding | 3 | LB | 61.00 | 183.00 | 61.00 | 183.00 | 60.00 | 180.00 | 74.70 | 224.10 |
| 0024 | 718-01-00100 | Fertilizer | 100 | LB | 6.50 | 650.00 | 7.00 | 700.00 | 8.00 | 800.00 | 7.47 | 747.00 |
| 0025 | 726-01-00100 | Bedding Material | 327.9 | CUYD | 68.00 | 22,297.20 | 45.00 | 14,755.50 | 55.00 | 18,034.50 | 91.36 | 29,956.94 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 79,000.00 | 79,000.00 | 49,117.00 | 49,117.00 | 50,000.00 | 50,000.00 | 46,303.30 | 46,303.30 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 12,835.00 | 12,835.00 | 6,000.00 | 6,000.00 | 30,000.00 | 30,000.00 |
| 0028 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 35,915.00 | 35,915.00 | 41,436.00 | 41,436.00 | 9,500.00 | 9,500.00 | 33,067.29 | 33,067.29 |
| 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 640 | INLF | 1.00 | 640.00 | 4.00 | 2,560.00 | 5.00 | 3,200.00 | 1.77 | 1,132.80 |
| 0030 | NS-804-00001 | Vibration Monitoring | 22 | EACH | 140.00 | 3,080.00 | 510.00 | 11,220.00 | 800.00 | 17,600.00 | 323.93 | 7,126.46 |
| 0031 | NS-MSC-00120 | Drainage Structure (RCB 12'X8.5'X60' WITH HEADWALL ON ONE SIDE) | 1 | EACH | 266,000.00 | 266,000.00 | 299,106.00 | 299,106.00 | 408,000.00 | 408,000.00 | 233,187.81 | 233,187.81 |
| 0032 | NS-MSC-00120 | Drainage Structure (Temporary Dam Removal & Replacement) | 5 | EACH | 3,400.00 | 17,000.00 | 2,155.00 | 10,775.00 | 1,000.00 | 5,000.00 | 6,582.09 | 32,910.45 |
| CONTRACTOR TOTAL | 594,061.90 | 599,660.40 | 675,366.60 | 686,199.58 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 13 - Byron E. Talbot Contractor, Inc. |
- 14 - Boh Bros. Construction Co., LLC. |
- 15 - Durr Heavy Construction L.L.C. |
- 16 - Thigpen Construction Co., Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 1,500.00 | 1,500.00 | 1,165.18 | 1,165.18 | 5,000.00 | 5,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 105+00.00; 30'X58.3' CONCRETE SLAB SPAN BRIDGE | 1 | EACH | 10,000.00 | 10,000.00 | 12,000.00 | 12,000.00 | 24,717.35 | 24,717.35 | 40,000.00 | 40,000.00 |
| 0003 | 202-02-06020 | Removal of Concrete Box Culverts PARTIAL | 1 | EACH | 8,500.00 | 8,500.00 | 7,300.00 | 7,300.00 | 8,159.50 | 8,159.50 | 15,000.00 | 15,000.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 12 | SQYD | 10.00 | 120.00 | 66.00 | 792.00 | 6.54 | 78.48 | 50.00 | 600.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 122 | SQYD | 10.00 | 1,220.00 | 36.00 | 4,392.00 | 7.75 | 945.50 | 100.00 | 12,200.00 |
| 0006 | 203-04-00100 | Nonplastic Embankment | 449 | CUYD | 40.00 | 17,960.00 | 50.00 | 22,450.00 | 29.94 | 13,443.06 | 30.00 | 13,470.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 18,000.00 | 18,000.00 | 14,000.00 | 14,000.00 | 6,986.87 | 6,986.87 | 10,000.00 | 10,000.00 |
| 0008 | 203-08-00100 | Geotextile Fabric | 750 | SQYD | 3.00 | 2,250.00 | 9.00 | 6,750.00 | 2.33 | 1,747.50 | 4.00 | 3,000.00 |
| 0009 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 290.7 | SQYD | 80.00 | 23,256.00 | 165.00 | 47,965.50 | 89.25 | 25,944.98 | 100.00 | 29,070.00 |
| 0010 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 16 | LNFT | 100.00 | 1,600.00 | 115.00 | 1,840.00 | 251.00 | 4,016.00 | 200.00 | 3,200.00 |
| 0011 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 56 | LNFT | 100.00 | 5,600.00 | 135.00 | 7,560.00 | 56.80 | 3,180.80 | 200.00 | 11,200.00 |
| 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 16 | LNFT | 100.00 | 1,600.00 | 160.00 | 2,560.00 | 71.38 | 1,142.08 | 250.00 | 4,000.00 |
| 0013 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 3,200.00 | 3,200.00 | 5,500.00 | 5,500.00 | 4,978.94 | 4,978.94 | 5,500.00 | 5,500.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,200.00 | 4,400.00 | 2,700.00 | 5,400.00 | 2,402.10 | 4,804.20 | 4,000.00 | 8,000.00 |
| 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 79.2 | SQYD | 55.00 | 4,356.00 | 155.00 | 12,276.00 | 181.53 | 14,377.18 | 60.00 | 4,752.00 |
| 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 12.2 | SQYD | 72.00 | 878.40 | 160.00 | 1,952.00 | 181.53 | 2,214.67 | 80.00 | 976.00 |
| 0017 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 1,150.00 | 1,150.00 | 4,200.00 | 4,200.00 | 3,025.49 | 3,025.49 | 2,000.00 | 2,000.00 |
| 0018 | 707-01-00200 | Concrete Curb (Barrier) | 118.8 | LNFT | 15.00 | 1,782.00 | 50.00 | 5,940.00 | 30.25 | 3,593.70 | 20.00 | 2,376.00 |
| 0019 | 707-01-00300 | Concrete Curb (Mountable) | 66 | LNFT | 15.00 | 990.00 | 50.00 | 3,300.00 | 30.26 | 1,997.16 | 20.00 | 1,320.00 |
| 0020 | 710-01-00100 | Flowable Fill | 200 | CUYD | 195.00 | 39,000.00 | 244.00 | 48,800.00 | 168.19 | 33,638.00 | 200.00 | 40,000.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,500.00 | 13,500.00 | 6,000.00 | 6,000.00 | 7,053.19 | 7,053.19 | 10,000.00 | 10,000.00 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 6,400.00 | 1,280.00 | 8,000.00 | 1,600.00 | 7,261.20 | 1,452.24 | 7,000.00 | 1,400.00 |
| 0023 | 717-01-00100 | Seeding | 3 | LB | 70.00 | 210.00 | 60.00 | 180.00 | 72.61 | 217.83 | 50.00 | 150.00 |
| 0024 | 718-01-00100 | Fertilizer | 100 | LB | 6.50 | 650.00 | 19.00 | 1,900.00 | 7.26 | 726.00 | 3.00 | 300.00 |
| 0025 | 726-01-00100 | Bedding Material | 327.9 | CUYD | 85.00 | 27,871.50 | 77.00 | 25,248.30 | 89.91 | 29,481.49 | 100.00 | 32,790.00 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 58,034.00 | 58,034.00 | 109,835.28 | 109,835.28 | 10,000.00 | 10,000.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 8,000.00 | 8,000.00 | 16,000.00 | 16,000.00 | 34,630.00 | 34,630.00 | 10,000.00 | 10,000.00 |
| 0028 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 80,000.00 | 80,000.00 | 215,000.00 | 215,000.00 | 76,726.51 | 76,726.51 | 20,000.00 | 20,000.00 |
| 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 640 | INLF | 1.25 | 800.00 | 2.50 | 1,600.00 | 1.51 | 966.40 | 5.00 | 3,200.00 |
| 0030 | NS-804-00001 | Vibration Monitoring | 22 | EACH | 400.00 | 8,800.00 | 480.00 | 10,560.00 | 500.47 | 11,010.34 | 200.00 | 4,400.00 |
| 0031 | NS-MSC-00120 | Drainage Structure (RCB 12'X8.5'X60' WITH HEADWALL ON ONE SIDE) | 1 | EACH | 288,000.00 | 288,000.00 | 135,000.00 | 135,000.00 | 256,937.34 | 256,937.34 | 463,096.00 | 463,096.00 |
| 0032 | NS-MSC-00120 | Drainage Structure (Temporary Dam Removal & Replacement) | 5 | EACH | 5,000.00 | 25,000.00 | 7,400.00 | 37,000.00 | 8,955.60 | 44,778.00 | 2,000.00 | 10,000.00 |
| CONTRACTOR TOTAL | 709,973.90 | 724,599.80 | 733,971.26 | 777,000.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 17 - Circle, LLC |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 13,500.00 | 13,500.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 105+00.00; 30'X58.3' CONCRETE SLAB SPAN BRIDGE | 1 | EACH | 37,000.00 | 37,000.00 |
| 0003 | 202-02-06020 | Removal of Concrete Box Culverts PARTIAL | 1 | EACH | 6,200.00 | 6,200.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 12 | SQYD | 240.00 | 2,880.00 |
| 0005 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 122 | SQYD | 91.00 | 11,102.00 |
| 0006 | 203-04-00100 | Nonplastic Embankment | 449 | CUYD | 57.00 | 25,593.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 8,000.00 | 8,000.00 |
| 0008 | 203-08-00100 | Geotextile Fabric | 750 | SQYD | 2.60 | 1,950.00 |
| 0009 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 290.7 | SQYD | 216.00 | 62,791.20 |
| 0010 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 16 | LNFT | 196.00 | 3,136.00 |
| 0011 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 56 | LNFT | 60.00 | 3,360.00 |
| 0012 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 16 | LNFT | 115.00 | 1,840.00 |
| 0013 | 702-02-00300 | Manholes (R-CB-11 MOD) | 1 | EACH | 4,425.00 | 4,425.00 |
| 0014 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 4,110.00 | 8,220.00 |
| 0015 | 706-01-00100 | Concrete Walk (4" Thick) | 79.2 | SQYD | 155.00 | 12,276.00 |
| 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 12.2 | SQYD | 160.00 | 1,952.00 |
| 0017 | 706-04-00100 | Handicapped Curb Ramps | 1 | EACH | 2,735.00 | 2,735.00 |
| 0018 | 707-01-00200 | Concrete Curb (Barrier) | 118.8 | LNFT | 30.00 | 3,564.00 |
| 0019 | 707-01-00300 | Concrete Curb (Mountable) | 66 | LNFT | 35.00 | 2,310.00 |
| 0020 | 710-01-00100 | Flowable Fill | 200 | CUYD | 166.00 | 33,200.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,580.00 | 10,580.00 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 0.2 | TON | 7,560.00 | 1,512.00 |
| 0023 | 717-01-00100 | Seeding | 3 | LB | 76.00 | 228.00 |
| 0024 | 718-01-00100 | Fertilizer | 100 | LB | 5.10 | 510.00 |
| 0025 | 726-01-00100 | Bedding Material | 327.9 | CUYD | 79.00 | 25,904.10 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 41,800.00 | 41,800.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 24,200.00 | 24,200.00 |
| 0028 | 803-05-00100 | Temporary Sheeting | 1 | LUMP | 21,000.00 | 21,000.00 |
| 0029 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 640 | INLF | 2.10 | 1,344.00 |
| 0030 | NS-804-00001 | Vibration Monitoring | 22 | EACH | 575.00 | 12,650.00 |
| 0031 | NS-MSC-00120 | Drainage Structure (RCB 12'X8.5'X60' WITH HEADWALL ON ONE SIDE) | 1 | EACH | 401,000.00 | 401,000.00 |
| 0032 | NS-MSC-00120 | Drainage Structure (Temporary Dam Removal & Replacement) | 5 | EACH | 3,850.00 | 19,250.00 |
| CONTRACTOR TOTAL | 806,012.30 | |||||