Bid Tabulations
Letting of
09/12/2012
LA DOTD Headquarters
| Lead Project: H.006052.6 | |
| Parish: Caddo | |
| Routes: | |
| Description: SPARKS DAVIS ROAD BRIDGE OVER TRIB. TO BUCHANAN BAYOU | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $385,303.80 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 40615 | Specialty Trackhoe & Dozer Serv.Inc | $291,050.45 |
| 2 | 28218 | F. J. Burnell, Inc. | $356,251.25 |
| 3 | 12135 | Blount Bros. Construction, Inc. | $378,118.70 |
| 4 | 56288 | Guinn Services, LLC | $382,501.95 |
| 5 | 49239 | WL Bass Construction Inc. | $398,519.90 |
| 6 | 36374 | Best-Yet Builders, Llc | $442,782.67 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Specialty Trackhoe & Dozer Serv.Inc |
- 2 - F. J. Burnell, Inc. |
- 3 - Blount Bros. Construction, Inc. |
- 4 - Guinn Services, LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 4,500.00 | 4,500.00 | 15,000.00 | 15,000.00 | 20,000.00 | 20,000.00 | 7,500.00 | 7,500.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 405+30; 28'X59' PRECAST CONCRETE SLAB SPANS, CONCRETE CAPS, TIMBER PILES | 1 | EACH | 6,000.00 | 6,000.00 | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 |
| 0003 | 202-02-38500 | Removal of Surfacing and Stablized Base | 632.1 | SQYD | 7.50 | 4,740.75 | 5.00 | 3,160.50 | 7.00 | 4,424.70 | 4.50 | 2,844.45 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 12,000.00 | 12,000.00 | 22,500.00 | 22,500.00 | 22,000.00 | 22,000.00 | 25,000.00 | 25,000.00 |
| 0005 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 450.00 | 1,800.00 | 100.00 | 400.00 | 500.00 | 2,000.00 | 750.00 | 3,000.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 200 | LNFT | 2.00 | 400.00 | 2.00 | 400.00 | 3.00 | 600.00 | 2.50 | 500.00 |
| 0007 | 302-01-00700 | Class II Base Course (Stone) | 204.1 | CUYD | 90.00 | 18,369.00 | 75.00 | 15,307.50 | 80.00 | 16,328.00 | 85.00 | 17,348.50 |
| 0008 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 70.00 | 14,000.00 | 50.00 | 10,000.00 | 45.00 | 9,000.00 | 85.00 | 17,000.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 157 | TON | 130.00 | 20,410.00 | 150.00 | 23,550.00 | 200.00 | 31,400.00 | 250.00 | 39,250.00 |
| 0010 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 446 | SQYD | 40.00 | 17,840.00 | 50.00 | 22,300.00 | 70.00 | 31,220.00 | 65.00 | 28,990.00 |
| 0011 | 711-04-00100 | Geotextile Fabric | 446 | SQYD | 2.00 | 892.00 | 2.00 | 892.00 | 3.00 | 1,338.00 | 4.00 | 1,784.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 13,000.00 | 13,000.00 | 6,500.00 | 6,500.00 | 8,000.00 | 8,000.00 | 18,000.00 | 18,000.00 |
| 0013 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 3,000.00 | 1,500.00 | 2,000.00 | 1,000.00 | 3,000.00 | 1,500.00 | 3,500.00 | 1,750.00 |
| 0014 | 717-01-00100 | Seeding | 8 | LB | 20.00 | 160.00 | 20.00 | 160.00 | 20.00 | 160.00 | 25.00 | 200.00 |
| 0015 | 718-01-00100 | Fertilizer | 240 | LB | 1.00 | 240.00 | 1.00 | 240.00 | 3.00 | 720.00 | 1.50 | 360.00 |
| 0016 | 726-01-00100 | Bedding Material | 275.3 | CUYD | 70.00 | 19,271.00 | 120.00 | 33,036.00 | 80.00 | 22,024.00 | 85.00 | 23,400.50 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 13,000.00 | 13,000.00 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 32,000.00 | 32,000.00 |
| 0018 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 175.00 | 700.00 | 100.00 | 400.00 | 150.00 | 600.00 | 150.00 | 600.00 |
| 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 6,000.00 | 6,000.00 | 7,500.00 | 7,500.00 | 8,000.00 | 8,000.00 | 4,000.00 | 4,000.00 |
| 0020 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 17.93 | CUYD | 990.00 | 17,750.70 | 1,300.00 | 23,309.00 | 1,000.00 | 17,930.00 | 1,400.00 | 25,102.00 |
| 0021 | 805-12-22040 | Reinforced Concrete Box Culverts (8' x 6') (Precast) | 208 | LNFT | 555.00 | 115,440.00 | 600.00 | 124,800.00 | 600.00 | 124,800.00 | 535.00 | 111,280.00 |
| 0022 | 806-01-00100 | Deformed Reinforcing Steel | 3,037 | LB | 1.00 | 3,037.00 | 1.25 | 3,796.25 | 2.00 | 6,074.00 | 2.50 | 7,592.50 |
| CONTRACTOR TOTAL | 291,050.45 | 356,251.25 | 378,118.70 | 382,501.95 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - WL Bass Construction Inc. |
- 6 - Best-Yet Builders, Llc |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 |
| 0002 | 202-02-04000 | Removal of Bridge STA 405+30; 28'X59' PRECAST CONCRETE SLAB SPANS, CONCRETE CAPS, TIMBER PILES | 1 | EACH | 15,000.00 | 15,000.00 | 50,000.00 | 50,000.00 |
| 0003 | 202-02-38500 | Removal of Surfacing and Stablized Base | 632.1 | SQYD | 6.00 | 3,792.60 | 4.00 | 2,528.40 |
| 0004 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 11,000.00 | 11,000.00 | 50,000.00 | 50,000.00 |
| 0005 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 4 | EACH | 25.00 | 100.00 | 500.00 | 2,000.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 200 | LNFT | 1.00 | 200.00 | 2.50 | 500.00 |
| 0007 | 302-01-00700 | Class II Base Course (Stone) | 204.1 | CUYD | 180.00 | 36,738.00 | 94.70 | 19,328.27 |
| 0008 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 200 | CUYD | 5.00 | 1,000.00 | 40.00 | 8,000.00 |
| 0009 | 502-01-00100 | Superpave Asphaltic Concrete | 157 | TON | 145.00 | 22,765.00 | 125.00 | 19,625.00 |
| 0010 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 446 | SQYD | 65.00 | 28,990.00 | 75.00 | 33,450.00 |
| 0011 | 711-04-00100 | Geotextile Fabric | 446 | SQYD | 2.00 | 892.00 | 2.00 | 892.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 40,000.00 | 40,000.00 | 10,000.00 | 10,000.00 |
| 0013 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 1,500.00 | 750.00 | 3,000.00 | 1,500.00 |
| 0014 | 717-01-00100 | Seeding | 8 | LB | 10.00 | 80.00 | 25.00 | 200.00 |
| 0015 | 718-01-00100 | Fertilizer | 240 | LB | 1.00 | 240.00 | 1.00 | 240.00 |
| 0016 | 726-01-00100 | Bedding Material | 275.3 | CUYD | 1.00 | 275.30 | 75.00 | 20,647.50 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 |
| 0018 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 75.00 | 300.00 | 120.00 | 480.00 |
| 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 5,000.00 | 5,000.00 | 7,500.00 | 7,500.00 |
| 0020 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 17.93 | CUYD | 1,100.00 | 19,723.00 | 650.00 | 11,654.50 |
| 0021 | 805-12-22040 | Reinforced Concrete Box Culverts (8' x 6') (Precast) | 208 | LNFT | 700.00 | 145,600.00 | 775.00 | 161,200.00 |
| 0022 | 806-01-00100 | Deformed Reinforcing Steel | 3,037 | LB | 2.00 | 6,074.00 | 1.00 | 3,037.00 |
| CONTRACTOR TOTAL | 398,519.90 | 442,782.67 | ||||||