LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.006006.6
Parish: Assumption
Routes:
Description: HIGHWAY 400 BRIDGE OVER CANCIENNE CANAL
Type Const: GRADING, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE, CONCRETE SLAB SPAN BRIDGE and RELATED WORK.
Estimated Construction Cost: $622,329.50


RankLicenseBidderConstruction Bid
1 40312 Gray Construction Corp. $568,298.66
2 00481 Coastal Bridge Co., L.L.C. $668,002.40
3 00044 Guinn Construction, LLC $691,933.50
4 39462 Jb James Construction Llc $729,217.20
5 33678 Sealevel Construction Inc. $878,279.40
6 34567 James Construction Group LLC $971,122.10


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Gray Construction Corp.
- 2 -
Coastal Bridge Co., L.L.C.
- 3 -
Guinn Construction, LLC
- 4 -
Jb James Construction Llc
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 5,000.00 5,000.00 6,000.00 6,000.00 5,000.00 5,000.00 25,500.00 25,500.00
0002 202-01-00100 Removal of Structures and Obstructions (INCLUDES EXISTING GUARD RAILS AND ASPHALT DRIVES) 1      LUMP 500.00 500.00 2,000.00 2,000.00 6,000.00 6,000.00 10,000.00 10,000.00
0003 202-02-04000 Removal of Bridge (STA 115+37.75; 171' X 24' PRECAST WITH TIMBER PILES) 1      EACH 14,800.00 14,800.00 45,000.00 45,000.00 15,000.00 15,000.00 35,000.00 35,000.00
0004 202-02-38500 Removal of Surfacing and Stablized Base 505.9    SQYD 15.40 7,790.86 11.00 5,564.90 5.00 2,529.50 8.00 4,047.20
0005 203-05-00100 Excavation and Embankment 1      LUMP 2,743.00 2,743.00 10,000.00 10,000.00 10,000.00 10,000.00 21,000.00 21,000.00
0006 204-02-00100 Temporary Hay or Straw Bales 43      EACH 27.50 1,182.50 10.00 430.00 10.00 430.00 17.00 731.00
0007 204-06-00100 Temporary Silt Fencing 531      LNFT 5.00 2,655.00 1.50 796.50 2.00 1,062.00 3.00 1,593.00
0008 302-01-00800 Class II Base Course (Stone or Recycled Portland Cement Concrete) 173.6    CUYD 108.00 18,748.80 110.00 19,096.00 90.00 15,624.00 130.00 22,568.00
0009 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 78.00 7,800.00 40.00 4,000.00 75.00 7,500.00 90.00 9,000.00
0010 502-01-00100 Superpave Asphaltic Concrete (INCLUDES 57 TONS FOR EMBANKMENT WIDENING AND ASPHALT DRIVEWAY APRONS) 180.2    TON 205.00 36,941.00 195.00 35,139.00 250.00 45,050.00 205.00 36,941.00
0011 704-03-00100 Blocked Out Guard Rail 37.5    LNFT 20.00 750.00 16.00 600.00 25.00 937.50 15.00 562.50
0012 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 83.3    LNFT 65.00 5,414.50 85.00 7,080.50 75.00 6,247.50 80.00 6,664.00
0013 704-11-00100 Guard Rail End Treatment (Flared) 2      EACH 2,200.00 4,400.00 2,300.00 4,600.00 2,500.00 5,000.00 2,100.00 4,200.00
0014 711-01-03000 Riprap (30 lb, 14" Thick) 307      SQYD 53.50 16,424.50 60.00 18,420.00 70.00 21,490.00 70.00 21,490.00
0015 711-04-00100 Geotextile Fabric 307      SQYD 2.00 614.00 2.50 767.50 5.00 1,535.00 2.50 767.50
0016 713-01-00100 Temporary Signs and Barricades 1      LUMP 6,500.00 6,500.00 12,000.00 12,000.00 13,000.00 13,000.00 5,500.00 5,500.00
0017 716-01-00100 Mulch (Vegetative) 0.2    TON 3,000.00 600.00 2,000.00 400.00 5,000.00 1,000.00 3,500.00 700.00
0018 717-01-00100 Seeding 3      LB 30.00 90.00 55.00 165.00 50.00 150.00 50.00 150.00
0019 718-01-00100 Fertilizer 101      LB 3.00 303.00 2.00 202.00 1.00 101.00 2.00 202.00
0020 727-01-00100 Mobilization 1      LUMP 41,300.00 41,300.00 65,000.00 65,000.00 65,000.00 65,000.00 70,000.00 70,000.00
0021 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 80.00 320.00 85.00 340.00 100.00 400.00 50.00 200.00
0022 731-02-00100 Reflectorized Raised Pavement Markers 26      EACH 30.00 780.00 11.00 286.00 35.00 910.00 10.00 260.00
0023 732-01-01000 Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 1,272      LNFT 3.00 3,816.00 2.25 2,862.00 3.50 4,452.00 2.00 2,544.00
0024 740-01-00100 Construction Layout 1      LUMP 3,000.00 3,000.00 15,000.00 15,000.00 8,000.00 8,000.00 8,500.00 8,500.00
0025 804-01-00300 Precast Concrete Piles (16") 2,520      LNFT 48.00 120,960.00 56.00 141,120.00 75.00 189,000.00 53.00 133,560.00
0026 804-05-00300 Precast Concrete Test Piles (16") 1      EACH 4,100.00 4,100.00 35,000.00 35,000.00 45,000.00 45,000.00 30,000.00 30,000.00
0027 804-09-00100 Loading Test Piles 1      EACH 22,500.00 22,500.00 20,000.00 20,000.00 1.00 1.00 1,500.00 1,500.00
0028 804-10-00100 Reloading Test Piles 1      EACH 4,900.00 4,900.00 100.00 100.00 1.00 1.00 100.00 100.00
0029 804-11-00100 Redriving Test Piles 1      EACH 1,200.00 1,200.00 100.00 100.00 1.00 1.00 100.00 100.00
0030 804-12-00100 Loading Permanent Piles 1      EACH 100.00 100.00 100.00 100.00 1.00 1.00 100.00 100.00
0031 804-17-00100 Dynamic Monitoring 7      EACH 2,900.00 20,300.00 500.00 3,500.00 1,500.00 10,500.00 500.00 3,500.00
0032 805-10-01300 Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) 6      SPAN 29,850.00 179,100.00 30,000.00 180,000.00 28,500.00 171,000.00 40,000.00 240,000.00
0033 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 337      INLF 1.50 505.50 9.00 3,033.00 3.00 1,011.00 1.00 337.00
0034 NS-700-00240 Special Guard Rail Anchor Section 2      EACH 1,500.00 3,000.00 1,650.00 3,300.00 2,000.00 4,000.00 950.00 1,900.00
0035 NS-800-00040 Concrete Approach Slabs (24' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT) 2      EACH 7,580.00 15,160.00 9,500.00 19,000.00 10,500.00 21,000.00 8,000.00 16,000.00
0036 NS-804-00001 Vibration Monitoring 28      EACH 500.00 14,000.00 250.00 7,000.00 500.00 14,000.00 500.00 14,000.00
                         
    CONTRACTOR TOTAL       568,298.66   668,002.40   691,933.50   729,217.20



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Sealevel Construction Inc.
- 6 -
James Construction Group LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 8,000.00 8,000.00 35,000.00 35,000.00
0002 202-01-00100 Removal of Structures and Obstructions (INCLUDES EXISTING GUARD RAILS AND ASPHALT DRIVES) 1      LUMP 8,000.00 8,000.00 3,500.00 3,500.00
0003 202-02-04000 Removal of Bridge (STA 115+37.75; 171' X 24' PRECAST WITH TIMBER PILES) 1      EACH 36,000.00 36,000.00 94,500.00 94,500.00
0004 202-02-38500 Removal of Surfacing and Stablized Base 505.9    SQYD 12.00 6,070.80 10.00 5,059.00
0005 203-05-00100 Excavation and Embankment 1      LUMP 15,000.00 15,000.00 7,200.00 7,200.00
0006 204-02-00100 Temporary Hay or Straw Bales 43      EACH 24.00 1,032.00 15.00 645.00
0007 204-06-00100 Temporary Silt Fencing 531      LNFT 8.00 4,248.00 5.00 2,655.00
0008 302-01-00800 Class II Base Course (Stone or Recycled Portland Cement Concrete) 173.6    CUYD 130.00 22,568.00 119.31 20,712.22
0009 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 86.00 8,600.00 25.00 2,500.00
0010 502-01-00100 Superpave Asphaltic Concrete (INCLUDES 57 TONS FOR EMBANKMENT WIDENING AND ASPHALT DRIVEWAY APRONS) 180.2    TON 240.00 43,248.00 205.00 36,941.00
0011 704-03-00100 Blocked Out Guard Rail 37.5    LNFT 16.00 600.00 15.00 562.50
0012 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 83.3    LNFT 82.00 6,830.60 80.00 6,664.00
0013 704-11-00100 Guard Rail End Treatment (Flared) 2      EACH 2,200.00 4,400.00 2,100.00 4,200.00
0014 711-01-03000 Riprap (30 lb, 14" Thick) 307      SQYD 80.00 24,560.00 93.84 28,808.88
0015 711-04-00100 Geotextile Fabric 307      SQYD 3.00 921.00 3.00 921.00
0016 713-01-00100 Temporary Signs and Barricades 1      LUMP 16,000.00 16,000.00 5,000.00 5,000.00
0017 716-01-00100 Mulch (Vegetative) 0.2    TON 4,000.00 800.00 3,500.00 700.00
0018 717-01-00100 Seeding 3      LB 60.00 180.00 50.00 150.00
0019 718-01-00100 Fertilizer 101      LB 2.00 202.00 2.00 202.00
0020 727-01-00100 Mobilization 1      LUMP 75,000.00 75,000.00 175,000.00 175,000.00
0021 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 82.00 328.00 50.00 200.00
0022 731-02-00100 Reflectorized Raised Pavement Markers 26      EACH 10.00 260.00 30.00 780.00
0023 732-01-01000 Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) 1,272      LNFT 2.50 3,180.00 3.00 3,816.00
0024 740-01-00100 Construction Layout 1      LUMP 9,000.00 9,000.00 15,000.00 15,000.00
0025 804-01-00300 Precast Concrete Piles (16") 2,520      LNFT 82.00 206,640.00 75.00 189,000.00
0026 804-05-00300 Precast Concrete Test Piles (16") 1      EACH 60,000.00 60,000.00 35,000.00 35,000.00
0027 804-09-00100 Loading Test Piles 1      EACH 2,100.00 2,100.00 8,000.00 8,000.00
0028 804-10-00100 Reloading Test Piles 1      EACH 2,100.00 2,100.00 5,000.00 5,000.00
0029 804-11-00100 Redriving Test Piles 1      EACH 24,000.00 24,000.00 500.00 500.00
0030 804-12-00100 Loading Permanent Piles 1      EACH 20,000.00 20,000.00 5,000.00 5,000.00
0031 804-17-00100 Dynamic Monitoring 7      EACH 2,000.00 14,000.00 1,000.00 7,000.00
0032 805-10-01300 Bridge Superstructure and Substructure (24' Clear Roadway; 90 Degree Crossing) 6      SPAN 36,000.00 216,000.00 40,000.00 240,000.00
0033 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 337      INLF 3.00 1,011.00 1.50 505.50
0034 NS-700-00240 Special Guard Rail Anchor Section 2      EACH 1,100.00 2,200.00 950.00 1,900.00
0035 NS-800-00040 Concrete Approach Slabs (24' CLR RDWY, 90 DEG CROSSING) (W/O ASPHALT) 2      EACH 12,000.00 24,000.00 9,000.00 18,000.00
0036 NS-804-00001 Vibration Monitoring 28      EACH 400.00 11,200.00 375.00 10,500.00
                 
    CONTRACTOR TOTAL       878,279.40   971,122.10