Bid Tabulations
Letting of
04/11/2012
LA DOTD Headquarters
| Lead Project: H.005529.6 | |
| Parish: Morehouse | |
| Routes: LA 835 | |
| Description: LA 835 Bridges | |
| Type Const: GRADING, CLASS II BASE COURSE, DRAINAGE STRUCTURES, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, SLAB SPAN BRIDGE, AND RELATED WORK | |
| Estimated Construction Cost: $4,098,471.86 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34567 | James Construction Group LLC | $3,340,082.61 |
| 2 | 12135 | Blount Bros. Construction, Inc. | $3,357,718.25 |
| 3 | 18546 | C W & W Contractors, Inc. | $3,420,566.32 |
| 4 | 14788 | Louisiana Bridge, Inc. | $3,817,313.92 |
| 5 | 39670 | Eutaw Construction Co. Inc. | $3,867,428.60 |
| 6 | 39462 | Jb James Construction Llc | $3,868,760.42 |
| 7 | 14422 | T. L. Wallace Construction, Inc. | $4,113,764.02 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - James Construction Group LLC |
- 2 - Blount Bros. Construction, Inc. |
- 3 - C W & W Contractors, Inc. |
- 4 - Louisiana Bridge, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 80,000.00 | 80,000.00 | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 | 38,000.00 | 38,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STA. 109+20 - 20' x 19' TIMBER TRESTLE BRIDGE | 1 | EACH | 4,500.00 | 4,500.00 | 4,000.00 | 4,000.00 | 4,000.00 | 4,000.00 | 4,500.00 | 4,500.00 |
| 0004 | 202-02-04000 | Removal of Bridge STA. 127+05 - 20' x 97' TIMBER TRESTLE BRIDGE | 1 | EACH | 9,000.00 | 9,000.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 |
| 0005 | 202-02-04000 | Removal of Bridge STA. 146+20 - 24 x 59' TIMBER TRESTLE BRIDGE | 1 | EACH | 7,000.00 | 7,000.00 | 9,000.00 | 9,000.00 | 8,000.00 | 8,000.00 | 8,000.00 | 8,000.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 1,353 | LNFT | 2.00 | 2,706.00 | 11.00 | 14,883.00 | 3.00 | 4,059.00 | 7.00 | 9,471.00 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 13,812.6 | SQYD | 4.55 | 62,847.33 | 5.00 | 69,063.00 | 5.00 | 69,063.00 | 5.00 | 69,063.00 |
| 0008 | 203-02-00100 | Drainage Excavation | 1,174 | CUYD | 8.00 | 9,392.00 | 12.00 | 14,088.00 | 20.00 | 23,480.00 | 15.00 | 17,610.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 118,000.00 | 118,000.00 | 66,500.00 | 66,500.00 | 140,000.00 | 140,000.00 | 270,000.00 | 270,000.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 8,909 | LNFT | 2.45 | 21,827.05 | 3.50 | 31,181.50 | 2.00 | 17,818.00 | 3.00 | 26,727.00 |
| 0011 | 302-02-01561 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,328.3 | SQYD | 20.00 | 26,566.00 | 12.00 | 15,939.60 | 15.00 | 19,924.50 | 30.00 | 39,849.00 |
| 0012 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 13,452.6 | SQYD | 37.00 | 497,746.20 | 26.00 | 349,767.60 | 35.00 | 470,841.00 | 40.00 | 538,104.00 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 104.22 | TON | 240.00 | 25,012.80 | 275.00 | 28,660.50 | 450.00 | 46,899.00 | 341.00 | 35,539.02 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 681.8 | CUYD | 30.00 | 20,454.00 | 80.00 | 54,544.00 | 115.00 | 78,407.00 | 72.00 | 49,089.60 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 350 | CUYD | 35.00 | 12,250.00 | 40.00 | 14,000.00 | 100.00 | 35,000.00 | 120.00 | 42,000.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 2,636.2 | TON | 115.00 | 303,163.00 | 160.00 | 421,792.00 | 160.00 | 421,792.00 | 134.50 | 354,568.90 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 150.5 | TON | 181.00 | 27,240.50 | 170.00 | 25,585.00 | 185.00 | 27,842.50 | 193.00 | 29,046.50 |
| 0018 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 64 | LNFT | 45.00 | 2,880.00 | 40.00 | 2,560.00 | 55.00 | 3,520.00 | 51.00 | 3,264.00 |
| 0019 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 158 | LNFT | 51.00 | 8,058.00 | 70.00 | 11,060.00 | 75.00 | 11,850.00 | 62.00 | 9,796.00 |
| 0020 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 156 | LNFT | 71.00 | 11,076.00 | 90.00 | 14,040.00 | 90.00 | 14,040.00 | 72.00 | 11,232.00 |
| 0021 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 15 | LNFT | 40.00 | 600.00 | 50.00 | 750.00 | 50.00 | 750.00 | 61.50 | 922.50 |
| 0022 | 701-16-02040 | Plastic Pipe (Extension) (24" CPEPDW) | 10 | LNFT | 200.00 | 2,000.00 | 50.00 | 500.00 | 75.00 | 750.00 | 76.00 | 760.00 |
| 0023 | 704-03-00100 | Blocked Out Guard Rail | 475 | LNFT | 18.00 | 8,550.00 | 35.00 | 16,625.00 | 25.00 | 11,875.00 | 20.50 | 9,737.50 |
| 0024 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 75.00 | 15,000.00 | 110.00 | 22,000.00 | 65.00 | 13,000.00 | 60.16 | 12,032.00 |
| 0025 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,000.00 | 16,000.00 | 4,000.00 | 32,000.00 | 1,500.00 | 12,000.00 | 2,270.00 | 18,160.00 |
| 0026 | 708-01-00100 | Right-of-Way Monument | 29 | EACH | 190.00 | 5,510.00 | 300.00 | 8,700.00 | 150.00 | 4,350.00 | 200.00 | 5,800.00 |
| 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 29 | EACH | 95.00 | 2,755.00 | 250.00 | 7,250.00 | 150.00 | 4,350.00 | 200.00 | 5,800.00 |
| 0028 | 712-04-00100 | Flexible Revetment | 842 | SQYD | 60.00 | 50,520.00 | 55.00 | 46,310.00 | 65.00 | 54,730.00 | 67.00 | 56,414.00 |
| 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 27,000.00 | 27,000.00 | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 |
| 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.456 | MILE | 700.00 | 3,119.20 | 1,000.00 | 4,456.00 | 2,500.00 | 11,140.00 | 454.00 | 2,023.02 |
| 0031 | 716-01-00100 | Mulch (Vegetative) | 16.2 | TON | 790.00 | 12,798.00 | 700.00 | 11,340.00 | 800.00 | 12,960.00 | 650.00 | 10,530.00 |
| 0032 | 717-01-00100 | Seeding | 326 | LB | 10.00 | 3,260.00 | 10.00 | 3,260.00 | 8.00 | 2,608.00 | 10.00 | 3,260.00 |
| 0033 | 718-01-00100 | Fertilizer | 10,840 | LB | 0.60 | 6,504.00 | 1.00 | 10,840.00 | 1.00 | 10,840.00 | 0.60 | 6,504.00 |
| 0034 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 656.23 | SQYD | 1.25 | 820.29 | 2.00 | 1,312.46 | 4.00 | 2,624.92 | 2.00 | 1,312.46 |
| 0035 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 227.78 | SQYD | 1.25 | 284.73 | 2.00 | 455.56 | 5.00 | 1,138.90 | 2.00 | 455.56 |
| 0036 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 113.89 | SQYD | 1.95 | 222.09 | 3.00 | 341.67 | 6.00 | 683.34 | 2.00 | 227.78 |
| 0037 | 725-01-00100 | Temporary Detour Roads | 9,040 | SQYD | 60.00 | 542,400.00 | 75.00 | 678,000.00 | 55.00 | 497,200.00 | 65.00 | 587,600.00 |
| 0038 | 725-02-00100 | Temporary Detour Bridging | 140 | LNFT | 1,000.00 | 140,000.00 | 300.00 | 42,000.00 | 500.00 | 70,000.00 | 2,150.00 | 301,000.00 |
| 0039 | 726-01-00100 | Bedding Material | 166.3 | CUYD | 55.00 | 9,146.50 | 80.00 | 13,304.00 | 110.00 | 18,293.00 | 110.00 | 18,293.00 |
| 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 330,000.00 | 330,000.00 | 100,000.00 | 100,000.00 | 250,000.00 | 250,000.00 | 119,200.00 | 119,200.00 |
| 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 55.00 | 110.00 | 100.00 | 200.00 | 85.00 | 170.00 | 74.00 | 148.00 |
| 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 65.00 | 520.00 | 100.00 | 800.00 | 85.00 | 680.00 | 85.13 | 681.04 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 104 | EACH | 5.00 | 520.00 | 12.00 | 1,248.00 | 5.00 | 520.00 | 7.00 | 728.00 |
| 0044 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 1.508 | MILE | 4,000.00 | 6,032.00 | 3,000.00 | 4,524.00 | 1,700.00 | 2,563.60 | 3,100.00 | 4,674.80 |
| 0045 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 0.754 | MILE | 1,000.00 | 754.00 | 2,000.00 | 1,508.00 | 800.00 | 603.20 | 910.00 | 686.14 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 | 40,000.00 | 40,000.00 |
| 0047 | 804-01-00300 | Precast Concrete Piles (16") | 2,888 | LNFT | 61.00 | 176,168.00 | 105.00 | 303,240.00 | 65.00 | 187,720.00 | 62.00 | 179,056.00 |
| 0048 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 35,000.00 | 35,000.00 | 10,000.00 | 10,000.00 | 1,500.00 | 1,500.00 | 14,000.00 | 14,000.00 |
| 0049 | 804-09-00100 | Loading Test Piles | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 1.00 | 1.00 | 10,000.00 | 10,000.00 |
| 0050 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 4,000.00 | 4,000.00 | 1,500.00 | 1,500.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| 0051 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1.00 | 1.00 | 1.00 | 1.00 |
| 0052 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 3,000.00 | 6,000.00 | 2,000.00 | 4,000.00 | 1.00 | 2.00 | 1.00 | 2.00 |
| 0053 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 1,000.00 | 5,000.00 | 2,000.00 | 10,000.00 | 500.00 | 2,500.00 | 900.00 | 4,500.00 |
| 0054 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 26.43 | CUYD | 1,200.00 | 31,716.00 | 1,000.00 | 26,430.00 | 1,200.00 | 31,716.00 | 1,200.00 | 31,716.00 |
| 0055 | 805-01-00700 | Class A Concrete (Bents) | 68.64 | CUYD | 995.00 | 68,296.80 | 650.00 | 44,616.00 | 800.00 | 54,912.00 | 1,000.00 | 68,640.00 |
| 0056 | 805-03-00100 | Class AA Concrete | 271.9 | CUYD | 585.00 | 159,061.50 | 700.00 | 190,330.00 | 800.00 | 217,520.00 | 950.00 | 258,305.00 |
| 0057 | 805-12-03000 | Reinforced Concrete Box Culverts (6' x 6') | 336 | LNFT | 365.00 | 122,640.00 | 500.00 | 168,000.00 | 550.00 | 184,800.00 | 450.00 | 151,200.00 |
| 0058 | 806-01-00100 | Deformed Reinforcing Steel | 62,237.36 | LB | 0.90 | 56,013.62 | 1.00 | 62,237.36 | 1.00 | 62,237.36 | 1.10 | 68,461.10 |
| 0059 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 400 | LNFT | 61.00 | 24,400.00 | 100.00 | 40,000.00 | 90.00 | 36,000.00 | 60.00 | 24,000.00 |
| 0060 | 813-01-00100 | Concrete Approach Slabs | 551.12 | SQYD | 225.00 | 124,002.00 | 300.00 | 165,336.00 | 225.00 | 124,002.00 | 225.00 | 124,002.00 |
| 0061 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,140 | INLF | 1.00 | 1,140.00 | 1.00 | 1,140.00 | 2.00 | 2,280.00 | 3.00 | 3,420.00 |
| 0062 | NS-700-00180 | Impact Attenuator (Construction Zone) | 4 | EACH | 11,000.00 | 44,000.00 | 10,000.00 | 40,000.00 | 5,000.00 | 20,000.00 | 12,300.00 | 49,200.00 |
| 0063 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 8 | EACH | 1,500.00 | 12,000.00 | 2,000.00 | 16,000.00 | 1.00 | 8.00 | 4,000.00 | 32,000.00 |
| CONTRACTOR TOTAL | 3,340,082.61 | 3,357,718.25 | 3,420,566.32 | 3,817,313.92 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Eutaw Construction Co. Inc. |
- 6 - Jb James Construction Llc |
- 7 - T. L. Wallace Construction, Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 133,630.00 | 133,630.00 | 350,000.00 | 350,000.00 | 160,000.00 | 160,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 41,000.00 | 41,000.00 | 45,000.00 | 45,000.00 | 5,700.00 | 5,700.00 |
| 0003 | 202-02-04000 | Removal of Bridge STA. 109+20 - 20' x 19' TIMBER TRESTLE BRIDGE | 1 | EACH | 11,430.00 | 11,430.00 | 7,500.00 | 7,500.00 | 7,800.00 | 7,800.00 |
| 0004 | 202-02-04000 | Removal of Bridge STA. 127+05 - 20' x 97' TIMBER TRESTLE BRIDGE | 1 | EACH | 18,816.00 | 18,816.00 | 11,000.00 | 11,000.00 | 35,600.00 | 35,600.00 |
| 0005 | 202-02-04000 | Removal of Bridge STA. 146+20 - 24 x 59' TIMBER TRESTLE BRIDGE | 1 | EACH | 14,596.00 | 14,596.00 | 7,500.00 | 7,500.00 | 17,800.00 | 17,800.00 |
| 0006 | 202-02-14500 | Removal of Guard Rail | 1,353 | LNFT | 3.00 | 4,059.00 | 4.00 | 5,412.00 | 2.10 | 2,841.30 |
| 0007 | 202-02-38500 | Removal of Surfacing and Stablized Base | 13,812.6 | SQYD | 3.90 | 53,869.14 | 5.00 | 69,063.00 | 6.10 | 84,256.86 |
| 0008 | 203-02-00100 | Drainage Excavation | 1,174 | CUYD | 7.80 | 9,157.20 | 13.00 | 15,262.00 | 12.00 | 14,088.00 |
| 0009 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 169,086.00 | 169,086.00 | 495,000.00 | 495,000.00 | 104,000.00 | 104,000.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 8,909 | LNFT | 2.20 | 19,599.80 | 2.50 | 22,272.50 | 2.90 | 25,836.10 |
| 0011 | 302-02-01561 | Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 1,328.3 | SQYD | 15.50 | 20,588.65 | 16.00 | 21,252.80 | 18.00 | 23,909.40 |
| 0012 | 302-02-06121 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 13,452.6 | SQYD | 27.75 | 373,309.65 | 30.00 | 403,578.00 | 31.00 | 417,030.60 |
| 0013 | 304-05-00100 | Lime Treatment (Type E) | 104.22 | TON | 623.75 | 65,007.23 | 180.00 | 18,759.60 | 520.00 | 54,194.40 |
| 0014 | 401-01-00100 | Aggregate Surface Course (Net Section) | 681.8 | CUYD | 98.25 | 66,986.85 | 50.00 | 34,090.00 | 130.00 | 88,634.00 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 350 | CUYD | 99.00 | 34,650.00 | 65.00 | 22,750.00 | 90.00 | 31,500.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 2,636.2 | TON | 131.75 | 347,319.35 | 115.00 | 303,163.00 | 120.00 | 316,344.00 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 150.5 | TON | 207.50 | 31,228.75 | 181.00 | 27,240.50 | 190.00 | 28,595.00 |
| 0018 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 64 | LNFT | 30.50 | 1,952.00 | 55.00 | 3,520.00 | 59.00 | 3,776.00 |
| 0019 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 158 | LNFT | 41.75 | 6,596.50 | 65.00 | 10,270.00 | 66.00 | 10,428.00 |
| 0020 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) | 156 | LNFT | 53.50 | 8,346.00 | 75.00 | 11,700.00 | 80.00 | 12,480.00 |
| 0021 | 701-16-01000 | Plastic Pipe (Extension) (12" RPVCP) | 15 | LNFT | 24.50 | 367.50 | 140.00 | 2,100.00 | 40.00 | 600.00 |
| 0022 | 701-16-02040 | Plastic Pipe (Extension) (24" CPEPDW) | 10 | LNFT | 63.25 | 632.50 | 150.00 | 1,500.00 | 82.00 | 820.00 |
| 0023 | 704-03-00100 | Blocked Out Guard Rail | 475 | LNFT | 20.50 | 9,737.50 | 18.00 | 8,550.00 | 19.00 | 9,025.00 |
| 0024 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 60.25 | 12,050.00 | 75.00 | 15,000.00 | 79.00 | 15,800.00 |
| 0025 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,268.00 | 18,144.00 | 2,000.00 | 16,000.00 | 2,100.00 | 16,800.00 |
| 0026 | 708-01-00100 | Right-of-Way Monument | 29 | EACH | 159.00 | 4,611.00 | 125.00 | 3,625.00 | 150.00 | 4,350.00 |
| 0027 | 708-02-00100 | Right-of-Way Monument Witness Post | 29 | EACH | 56.75 | 1,645.75 | 125.00 | 3,625.00 | 53.00 | 1,537.00 |
| 0028 | 712-04-00100 | Flexible Revetment | 842 | SQYD | 72.75 | 61,255.50 | 55.00 | 46,310.00 | 67.00 | 56,414.00 |
| 0029 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 19,590.00 | 19,590.00 | 40,000.00 | 40,000.00 | 18,200.00 | 18,200.00 |
| 0030 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 4.456 | MILE | 453.75 | 2,021.91 | 405.00 | 1,804.68 | 420.00 | 1,871.52 |
| 0031 | 716-01-00100 | Mulch (Vegetative) | 16.2 | TON | 794.00 | 12,862.80 | 605.00 | 9,801.00 | 750.00 | 12,150.00 |
| 0032 | 717-01-00100 | Seeding | 326 | LB | 9.10 | 2,966.60 | 10.00 | 3,260.00 | 8.95 | 2,917.70 |
| 0033 | 718-01-00100 | Fertilizer | 10,840 | LB | 0.55 | 5,962.00 | 0.60 | 6,504.00 | 0.65 | 7,046.00 |
| 0034 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 656.23 | SQYD | 3.40 | 2,231.18 | 3.00 | 1,968.69 | 2.10 | 1,378.08 |
| 0035 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 227.78 | SQYD | 4.30 | 979.45 | 3.00 | 683.34 | 2.30 | 523.89 |
| 0036 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 113.89 | SQYD | 5.70 | 649.17 | 3.00 | 341.67 | 2.30 | 261.95 |
| 0037 | 725-01-00100 | Temporary Detour Roads | 9,040 | SQYD | 70.50 | 637,320.00 | 40.00 | 361,600.00 | 66.00 | 596,640.00 |
| 0038 | 725-02-00100 | Temporary Detour Bridging | 140 | LNFT | 2,847.00 | 398,580.00 | 850.00 | 119,000.00 | 3,465.00 | 485,100.00 |
| 0039 | 726-01-00100 | Bedding Material | 166.3 | CUYD | 75.00 | 12,472.50 | 60.00 | 9,978.00 | 65.00 | 10,809.50 |
| 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 175,000.00 | 175,000.00 | 385,000.00 | 385,000.00 | 300,000.00 | 300,000.00 |
| 0041 | 729-16-00200 | Object Marker Assembly (Type 2) | 2 | EACH | 73.75 | 147.50 | 55.00 | 110.00 | 58.00 | 116.00 |
| 0042 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 85.25 | 682.00 | 130.00 | 1,040.00 | 68.00 | 544.00 |
| 0043 | 731-02-00100 | Reflectorized Raised Pavement Markers | 104 | EACH | 6.80 | 707.20 | 6.00 | 624.00 | 6.30 | 655.20 |
| 0044 | 732-02-01000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) | 1.508 | MILE | 3,062.00 | 4,617.50 | 2,800.00 | 4,222.40 | 2,800.00 | 4,222.40 |
| 0045 | 732-03-01000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) | 0.754 | MILE | 907.25 | 684.07 | 810.00 | 610.74 | 840.00 | 633.36 |
| 0046 | 740-01-00100 | Construction Layout | 1 | LUMP | 56,133.00 | 56,133.00 | 40,000.00 | 40,000.00 | 52,100.00 | 52,100.00 |
| 0047 | 804-01-00300 | Precast Concrete Piles (16") | 2,888 | LNFT | 54.25 | 156,674.00 | 55.00 | 158,840.00 | 57.00 | 164,616.00 |
| 0048 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 7,682.00 | 7,682.00 | 25,000.00 | 25,000.00 | 12,600.00 | 12,600.00 |
| 0049 | 804-09-00100 | Loading Test Piles | 1 | EACH | 5,670.00 | 5,670.00 | 2,500.00 | 2,500.00 | 30,800.00 | 30,800.00 |
| 0050 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 5,670.00 | 5,670.00 | 500.00 | 500.00 | 120.00 | 120.00 |
| 0051 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 5,427.00 | 5,427.00 | 500.00 | 500.00 | 5,300.00 | 5,300.00 |
| 0052 | 804-12-00100 | Loading Permanent Piles | 2 | EACH | 5,670.00 | 11,340.00 | 100.00 | 200.00 | 30,800.00 | 61,600.00 |
| 0053 | 804-17-00100 | Dynamic Monitoring | 5 | EACH | 1,701.00 | 8,505.00 | 800.00 | 4,000.00 | 1,900.00 | 9,500.00 |
| 0054 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 26.43 | CUYD | 1,667.00 | 44,058.81 | 1,200.00 | 31,716.00 | 1,600.00 | 42,288.00 |
| 0055 | 805-01-00700 | Class A Concrete (Bents) | 68.64 | CUYD | 830.50 | 57,005.52 | 1,500.00 | 102,960.00 | 1,100.00 | 75,504.00 |
| 0056 | 805-03-00100 | Class AA Concrete | 271.9 | CUYD | 821.50 | 223,365.85 | 750.00 | 203,925.00 | 950.00 | 258,305.00 |
| 0057 | 805-12-03000 | Reinforced Concrete Box Culverts (6' x 6') | 336 | LNFT | 419.75 | 141,036.00 | 425.00 | 142,800.00 | 380.00 | 127,680.00 |
| 0058 | 806-01-00100 | Deformed Reinforcing Steel | 62,237.36 | LB | 1.80 | 112,027.25 | 1.25 | 77,796.70 | 1.15 | 71,572.96 |
| 0059 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 400 | LNFT | 69.25 | 27,700.00 | 65.00 | 26,000.00 | 70.00 | 28,000.00 |
| 0060 | 813-01-00100 | Concrete Approach Slabs | 551.12 | SQYD | 247.25 | 136,264.42 | 215.00 | 118,490.80 | 240.00 | 132,268.80 |
| 0061 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,140 | INLF | 2.00 | 2,280.00 | 1.00 | 1,140.00 | 2.00 | 2,280.00 |
| 0062 | NS-700-00180 | Impact Attenuator (Construction Zone) | 4 | EACH | 8,959.00 | 35,836.00 | 1,000.00 | 4,000.00 | 8,300.00 | 33,200.00 |
| 0063 | NS-700-00182 | Repair and Restoration of Impact Attenuator (Const Zone) | 8 | EACH | 1,701.00 | 13,608.00 | 100.00 | 800.00 | 1,600.00 | 12,800.00 |
| CONTRACTOR TOTAL | 3,867,428.60 | 3,868,760.42 | 4,113,764.02 | |||||||