LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.005529.6
Parish: Morehouse
Routes: LA 835
Description: LA 835 Bridges
Type Const: GRADING, CLASS II BASE COURSE, DRAINAGE STRUCTURES, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, SLAB SPAN BRIDGE, AND RELATED WORK
Estimated Construction Cost: $4,098,471.86


RankLicenseBidderConstruction Bid
1 34567 James Construction Group LLC $3,340,082.61
2 12135 Blount Bros. Construction, Inc. $3,357,718.25
3 18546 C W & W Contractors, Inc. $3,420,566.32
4 14788 Louisiana Bridge, Inc. $3,817,313.92
5 39670 Eutaw Construction Co. Inc. $3,867,428.60
6 39462 Jb James Construction Llc $3,868,760.42
7 14422 T. L. Wallace Construction, Inc. $4,113,764.02


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
James Construction Group LLC
- 2 -
Blount Bros. Construction, Inc.
- 3 -
C W & W Contractors, Inc.
- 4 -
Louisiana Bridge, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 80,000.00 80,000.00 40,000.00 40,000.00 25,000.00 25,000.00 38,000.00 38,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 5,000.00 5,000.00 4,000.00 4,000.00 5,000.00 5,000.00 8,000.00 8,000.00
0003 202-02-04000 Removal of Bridge STA. 109+20 - 20' x 19' TIMBER TRESTLE BRIDGE 1      EACH 4,500.00 4,500.00 4,000.00 4,000.00 4,000.00 4,000.00 4,500.00 4,500.00
0004 202-02-04000 Removal of Bridge STA. 127+05 - 20' x 97' TIMBER TRESTLE BRIDGE 1      EACH 9,000.00 9,000.00 15,000.00 15,000.00 10,000.00 10,000.00 8,000.00 8,000.00
0005 202-02-04000 Removal of Bridge STA. 146+20 - 24 x 59' TIMBER TRESTLE BRIDGE 1      EACH 7,000.00 7,000.00 9,000.00 9,000.00 8,000.00 8,000.00 8,000.00 8,000.00
0006 202-02-14500 Removal of Guard Rail 1,353      LNFT 2.00 2,706.00 11.00 14,883.00 3.00 4,059.00 7.00 9,471.00
0007 202-02-38500 Removal of Surfacing and Stablized Base 13,812.6    SQYD 4.55 62,847.33 5.00 69,063.00 5.00 69,063.00 5.00 69,063.00
0008 203-02-00100 Drainage Excavation 1,174      CUYD 8.00 9,392.00 12.00 14,088.00 20.00 23,480.00 15.00 17,610.00
0009 203-05-00100 Excavation and Embankment 1      LUMP 118,000.00 118,000.00 66,500.00 66,500.00 140,000.00 140,000.00 270,000.00 270,000.00
0010 204-06-00100 Temporary Silt Fencing 8,909      LNFT 2.45 21,827.05 3.50 31,181.50 2.00 17,818.00 3.00 26,727.00
0011 302-02-01561 Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 1,328.3    SQYD 20.00 26,566.00 12.00 15,939.60 15.00 19,924.50 30.00 39,849.00
0012 302-02-06121 Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 13,452.6    SQYD 37.00 497,746.20 26.00 349,767.60 35.00 470,841.00 40.00 538,104.00
0013 304-05-00100 Lime Treatment (Type E) 104.22   TON 240.00 25,012.80 275.00 28,660.50 450.00 46,899.00 341.00 35,539.02
0014 401-01-00100 Aggregate Surface Course (Net Section) 681.8    CUYD 30.00 20,454.00 80.00 54,544.00 115.00 78,407.00 72.00 49,089.60
0015 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 350      CUYD 35.00 12,250.00 40.00 14,000.00 100.00 35,000.00 120.00 42,000.00
0016 502-01-00100 Superpave Asphaltic Concrete 2,636.2    TON 115.00 303,163.00 160.00 421,792.00 160.00 421,792.00 134.50 354,568.90
0017 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 150.5    TON 181.00 27,240.50 170.00 25,585.00 185.00 27,842.50 193.00 29,046.50
0018 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 64      LNFT 45.00 2,880.00 40.00 2,560.00 55.00 3,520.00 51.00 3,264.00
0019 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 158      LNFT 51.00 8,058.00 70.00 11,060.00 75.00 11,850.00 62.00 9,796.00
0020 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) 156      LNFT 71.00 11,076.00 90.00 14,040.00 90.00 14,040.00 72.00 11,232.00
0021 701-16-01000 Plastic Pipe (Extension) (12" RPVCP) 15      LNFT 40.00 600.00 50.00 750.00 50.00 750.00 61.50 922.50
0022 701-16-02040 Plastic Pipe (Extension) (24" CPEPDW) 10      LNFT 200.00 2,000.00 50.00 500.00 75.00 750.00 76.00 760.00
0023 704-03-00100 Blocked Out Guard Rail 475      LNFT 18.00 8,550.00 35.00 16,625.00 25.00 11,875.00 20.50 9,737.50
0024 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 200      LNFT 75.00 15,000.00 110.00 22,000.00 65.00 13,000.00 60.16 12,032.00
0025 704-11-00100 Guard Rail End Treatment (Flared) 8      EACH 2,000.00 16,000.00 4,000.00 32,000.00 1,500.00 12,000.00 2,270.00 18,160.00
0026 708-01-00100 Right-of-Way Monument 29      EACH 190.00 5,510.00 300.00 8,700.00 150.00 4,350.00 200.00 5,800.00
0027 708-02-00100 Right-of-Way Monument Witness Post 29      EACH 95.00 2,755.00 250.00 7,250.00 150.00 4,350.00 200.00 5,800.00
0028 712-04-00100 Flexible Revetment 842      SQYD 60.00 50,520.00 55.00 46,310.00 65.00 54,730.00 67.00 56,414.00
0029 713-01-00100 Temporary Signs and Barricades 1      LUMP 27,000.00 27,000.00 25,000.00 25,000.00 30,000.00 30,000.00 20,000.00 20,000.00
0030 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 4.456  MILE 700.00 3,119.20 1,000.00 4,456.00 2,500.00 11,140.00 454.00 2,023.02
0031 716-01-00100 Mulch (Vegetative) 16.2    TON 790.00 12,798.00 700.00 11,340.00 800.00 12,960.00 650.00 10,530.00
0032 717-01-00100 Seeding 326      LB 10.00 3,260.00 10.00 3,260.00 8.00 2,608.00 10.00 3,260.00
0033 718-01-00100 Fertilizer 10,840      LB 0.60 6,504.00 1.00 10,840.00 1.00 10,840.00 0.60 6,504.00
0034 720-01-01000 Erosion Control System (Slope Protection) (Type A) 656.23   SQYD 1.25 820.29 2.00 1,312.46 4.00 2,624.92 2.00 1,312.46
0035 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 227.78   SQYD 1.25 284.73 2.00 455.56 5.00 1,138.90 2.00 455.56
0036 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 113.89   SQYD 1.95 222.09 3.00 341.67 6.00 683.34 2.00 227.78
0037 725-01-00100 Temporary Detour Roads 9,040      SQYD 60.00 542,400.00 75.00 678,000.00 55.00 497,200.00 65.00 587,600.00
0038 725-02-00100 Temporary Detour Bridging 140      LNFT 1,000.00 140,000.00 300.00 42,000.00 500.00 70,000.00 2,150.00 301,000.00
0039 726-01-00100 Bedding Material 166.3    CUYD 55.00 9,146.50 80.00 13,304.00 110.00 18,293.00 110.00 18,293.00
0040 727-01-00100 Mobilization 1      LUMP 330,000.00 330,000.00 100,000.00 100,000.00 250,000.00 250,000.00 119,200.00 119,200.00
0041 729-16-00200 Object Marker Assembly (Type 2) 2      EACH 55.00 110.00 100.00 200.00 85.00 170.00 74.00 148.00
0042 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 65.00 520.00 100.00 800.00 85.00 680.00 85.13 681.04
0043 731-02-00100 Reflectorized Raised Pavement Markers 104      EACH 5.00 520.00 12.00 1,248.00 5.00 520.00 7.00 728.00
0044 732-02-01000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) 1.508  MILE 4,000.00 6,032.00 3,000.00 4,524.00 1,700.00 2,563.60 3,100.00 4,674.80
0045 732-03-01000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) 0.754  MILE 1,000.00 754.00 2,000.00 1,508.00 800.00 603.20 910.00 686.14
0046 740-01-00100 Construction Layout 1      LUMP 25,000.00 25,000.00 30,000.00 30,000.00 45,000.00 45,000.00 40,000.00 40,000.00
0047 804-01-00300 Precast Concrete Piles (16") 2,888      LNFT 61.00 176,168.00 105.00 303,240.00 65.00 187,720.00 62.00 179,056.00
0048 804-05-00300 Precast Concrete Test Piles (16") 1      EACH 35,000.00 35,000.00 10,000.00 10,000.00 1,500.00 1,500.00 14,000.00 14,000.00
0049 804-09-00100 Loading Test Piles 1      EACH 5,000.00 5,000.00 5,000.00 5,000.00 1.00 1.00 10,000.00 10,000.00
0050 804-10-00100 Reloading Test Piles 1      EACH 4,000.00 4,000.00 1,500.00 1,500.00 1.00 1.00 1.00 1.00
0051 804-11-00100 Redriving Test Piles 1      EACH 1,500.00 1,500.00 1,500.00 1,500.00 1.00 1.00 1.00 1.00
0052 804-12-00100 Loading Permanent Piles 2      EACH 3,000.00 6,000.00 2,000.00 4,000.00 1.00 2.00 1.00 2.00
0053 804-17-00100 Dynamic Monitoring 5      EACH 1,000.00 5,000.00 2,000.00 10,000.00 500.00 2,500.00 900.00 4,500.00
0054 805-01-00300 Class A Concrete (Box Culvert Headwalls) 26.43   CUYD 1,200.00 31,716.00 1,000.00 26,430.00 1,200.00 31,716.00 1,200.00 31,716.00
0055 805-01-00700 Class A Concrete (Bents) 68.64   CUYD 995.00 68,296.80 650.00 44,616.00 800.00 54,912.00 1,000.00 68,640.00
0056 805-03-00100 Class AA Concrete 271.9    CUYD 585.00 159,061.50 700.00 190,330.00 800.00 217,520.00 950.00 258,305.00
0057 805-12-03000 Reinforced Concrete Box Culverts (6' x 6') 336      LNFT 365.00 122,640.00 500.00 168,000.00 550.00 184,800.00 450.00 151,200.00
0058 806-01-00100 Deformed Reinforcing Steel 62,237.36   LB 0.90 56,013.62 1.00 62,237.36 1.00 62,237.36 1.10 68,461.10
0059 810-01-00200 Concrete Railing (Slotted Barrier) 400      LNFT 61.00 24,400.00 100.00 40,000.00 90.00 36,000.00 60.00 24,000.00
0060 813-01-00100 Concrete Approach Slabs 551.12   SQYD 225.00 124,002.00 300.00 165,336.00 225.00 124,002.00 225.00 124,002.00
0061 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 1,140      INLF 1.00 1,140.00 1.00 1,140.00 2.00 2,280.00 3.00 3,420.00
0062 NS-700-00180 Impact Attenuator (Construction Zone) 4      EACH 11,000.00 44,000.00 10,000.00 40,000.00 5,000.00 20,000.00 12,300.00 49,200.00
0063 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 8      EACH 1,500.00 12,000.00 2,000.00 16,000.00 1.00 8.00 4,000.00 32,000.00
                         
    CONTRACTOR TOTAL       3,340,082.61   3,357,718.25   3,420,566.32   3,817,313.92



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Eutaw Construction Co. Inc.
- 6 -
Jb James Construction Llc
- 7 -
T. L. Wallace Construction, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 133,630.00 133,630.00 350,000.00 350,000.00 160,000.00 160,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 41,000.00 41,000.00 45,000.00 45,000.00 5,700.00 5,700.00
0003 202-02-04000 Removal of Bridge STA. 109+20 - 20' x 19' TIMBER TRESTLE BRIDGE 1      EACH 11,430.00 11,430.00 7,500.00 7,500.00 7,800.00 7,800.00
0004 202-02-04000 Removal of Bridge STA. 127+05 - 20' x 97' TIMBER TRESTLE BRIDGE 1      EACH 18,816.00 18,816.00 11,000.00 11,000.00 35,600.00 35,600.00
0005 202-02-04000 Removal of Bridge STA. 146+20 - 24 x 59' TIMBER TRESTLE BRIDGE 1      EACH 14,596.00 14,596.00 7,500.00 7,500.00 17,800.00 17,800.00
0006 202-02-14500 Removal of Guard Rail 1,353      LNFT 3.00 4,059.00 4.00 5,412.00 2.10 2,841.30
0007 202-02-38500 Removal of Surfacing and Stablized Base 13,812.6    SQYD 3.90 53,869.14 5.00 69,063.00 6.10 84,256.86
0008 203-02-00100 Drainage Excavation 1,174      CUYD 7.80 9,157.20 13.00 15,262.00 12.00 14,088.00
0009 203-05-00100 Excavation and Embankment 1      LUMP 169,086.00 169,086.00 495,000.00 495,000.00 104,000.00 104,000.00
0010 204-06-00100 Temporary Silt Fencing 8,909      LNFT 2.20 19,599.80 2.50 22,272.50 2.90 25,836.10
0011 302-02-01561 Class II Base Course (5" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 1,328.3    SQYD 15.50 20,588.65 16.00 21,252.80 18.00 23,909.40
0012 302-02-06121 Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 13,452.6    SQYD 27.75 373,309.65 30.00 403,578.00 31.00 417,030.60
0013 304-05-00100 Lime Treatment (Type E) 104.22   TON 623.75 65,007.23 180.00 18,759.60 520.00 54,194.40
0014 401-01-00100 Aggregate Surface Course (Net Section) 681.8    CUYD 98.25 66,986.85 50.00 34,090.00 130.00 88,634.00
0015 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 350      CUYD 99.00 34,650.00 65.00 22,750.00 90.00 31,500.00
0016 502-01-00100 Superpave Asphaltic Concrete 2,636.2    TON 131.75 347,319.35 115.00 303,163.00 120.00 316,344.00
0017 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 150.5    TON 207.50 31,228.75 181.00 27,240.50 190.00 28,595.00
0018 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 64      LNFT 30.50 1,952.00 55.00 3,520.00 59.00 3,776.00
0019 701-05-01060 Side Drain Pipe (24" RCP/PP/CMP) 158      LNFT 41.75 6,596.50 65.00 10,270.00 66.00 10,428.00
0020 701-05-01080 Side Drain Pipe (30" RCP/PP/CMP) 156      LNFT 53.50 8,346.00 75.00 11,700.00 80.00 12,480.00
0021 701-16-01000 Plastic Pipe (Extension) (12" RPVCP) 15      LNFT 24.50 367.50 140.00 2,100.00 40.00 600.00
0022 701-16-02040 Plastic Pipe (Extension) (24" CPEPDW) 10      LNFT 63.25 632.50 150.00 1,500.00 82.00 820.00
0023 704-03-00100 Blocked Out Guard Rail 475      LNFT 20.50 9,737.50 18.00 8,550.00 19.00 9,025.00
0024 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 200      LNFT 60.25 12,050.00 75.00 15,000.00 79.00 15,800.00
0025 704-11-00100 Guard Rail End Treatment (Flared) 8      EACH 2,268.00 18,144.00 2,000.00 16,000.00 2,100.00 16,800.00
0026 708-01-00100 Right-of-Way Monument 29      EACH 159.00 4,611.00 125.00 3,625.00 150.00 4,350.00
0027 708-02-00100 Right-of-Way Monument Witness Post 29      EACH 56.75 1,645.75 125.00 3,625.00 53.00 1,537.00
0028 712-04-00100 Flexible Revetment 842      SQYD 72.75 61,255.50 55.00 46,310.00 67.00 56,414.00
0029 713-01-00100 Temporary Signs and Barricades 1      LUMP 19,590.00 19,590.00 40,000.00 40,000.00 18,200.00 18,200.00
0030 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 4.456  MILE 453.75 2,021.91 405.00 1,804.68 420.00 1,871.52
0031 716-01-00100 Mulch (Vegetative) 16.2    TON 794.00 12,862.80 605.00 9,801.00 750.00 12,150.00
0032 717-01-00100 Seeding 326      LB 9.10 2,966.60 10.00 3,260.00 8.95 2,917.70
0033 718-01-00100 Fertilizer 10,840      LB 0.55 5,962.00 0.60 6,504.00 0.65 7,046.00
0034 720-01-01000 Erosion Control System (Slope Protection) (Type A) 656.23   SQYD 3.40 2,231.18 3.00 1,968.69 2.10 1,378.08
0035 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 227.78   SQYD 4.30 979.45 3.00 683.34 2.30 523.89
0036 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 113.89   SQYD 5.70 649.17 3.00 341.67 2.30 261.95
0037 725-01-00100 Temporary Detour Roads 9,040      SQYD 70.50 637,320.00 40.00 361,600.00 66.00 596,640.00
0038 725-02-00100 Temporary Detour Bridging 140      LNFT 2,847.00 398,580.00 850.00 119,000.00 3,465.00 485,100.00
0039 726-01-00100 Bedding Material 166.3    CUYD 75.00 12,472.50 60.00 9,978.00 65.00 10,809.50
0040 727-01-00100 Mobilization 1      LUMP 175,000.00 175,000.00 385,000.00 385,000.00 300,000.00 300,000.00
0041 729-16-00200 Object Marker Assembly (Type 2) 2      EACH 73.75 147.50 55.00 110.00 58.00 116.00
0042 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 85.25 682.00 130.00 1,040.00 68.00 544.00
0043 731-02-00100 Reflectorized Raised Pavement Markers 104      EACH 6.80 707.20 6.00 624.00 6.30 655.20
0044 732-02-01000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 40 mil) 1.508  MILE 3,062.00 4,617.50 2,800.00 4,222.40 2,800.00 4,222.40
0045 732-03-01000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 40 mil) 0.754  MILE 907.25 684.07 810.00 610.74 840.00 633.36
0046 740-01-00100 Construction Layout 1      LUMP 56,133.00 56,133.00 40,000.00 40,000.00 52,100.00 52,100.00
0047 804-01-00300 Precast Concrete Piles (16") 2,888      LNFT 54.25 156,674.00 55.00 158,840.00 57.00 164,616.00
0048 804-05-00300 Precast Concrete Test Piles (16") 1      EACH 7,682.00 7,682.00 25,000.00 25,000.00 12,600.00 12,600.00
0049 804-09-00100 Loading Test Piles 1      EACH 5,670.00 5,670.00 2,500.00 2,500.00 30,800.00 30,800.00
0050 804-10-00100 Reloading Test Piles 1      EACH 5,670.00 5,670.00 500.00 500.00 120.00 120.00
0051 804-11-00100 Redriving Test Piles 1      EACH 5,427.00 5,427.00 500.00 500.00 5,300.00 5,300.00
0052 804-12-00100 Loading Permanent Piles 2      EACH 5,670.00 11,340.00 100.00 200.00 30,800.00 61,600.00
0053 804-17-00100 Dynamic Monitoring 5      EACH 1,701.00 8,505.00 800.00 4,000.00 1,900.00 9,500.00
0054 805-01-00300 Class A Concrete (Box Culvert Headwalls) 26.43   CUYD 1,667.00 44,058.81 1,200.00 31,716.00 1,600.00 42,288.00
0055 805-01-00700 Class A Concrete (Bents) 68.64   CUYD 830.50 57,005.52 1,500.00 102,960.00 1,100.00 75,504.00
0056 805-03-00100 Class AA Concrete 271.9    CUYD 821.50 223,365.85 750.00 203,925.00 950.00 258,305.00
0057 805-12-03000 Reinforced Concrete Box Culverts (6' x 6') 336      LNFT 419.75 141,036.00 425.00 142,800.00 380.00 127,680.00
0058 806-01-00100 Deformed Reinforcing Steel 62,237.36   LB 1.80 112,027.25 1.25 77,796.70 1.15 71,572.96
0059 810-01-00200 Concrete Railing (Slotted Barrier) 400      LNFT 69.25 27,700.00 65.00 26,000.00 70.00 28,000.00
0060 813-01-00100 Concrete Approach Slabs 551.12   SQYD 247.25 136,264.42 215.00 118,490.80 240.00 132,268.80
0061 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 1,140      INLF 2.00 2,280.00 1.00 1,140.00 2.00 2,280.00
0062 NS-700-00180 Impact Attenuator (Construction Zone) 4      EACH 8,959.00 35,836.00 1,000.00 4,000.00 8,300.00 33,200.00
0063 NS-700-00182 Repair and Restoration of Impact Attenuator (Const Zone) 8      EACH 1,701.00 13,608.00 100.00 800.00 1,600.00 12,800.00
                     
    CONTRACTOR TOTAL       3,867,428.60   3,868,760.42   4,113,764.02