Bid Tabulations
Letting of
11/16/2011
LA DOTD Headquarters
| Lead Project: H.005343.6 | |
| Parish: Caddo | |
| Routes: | |
| Description: NORTH SPRUCE STREET | |
| Type Const: CONCRETE SIDEWALK ON NORTH SPRUCE STREET | |
| Estimated Construction Cost: $152,869.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 40439 | Ronald G. Carlson Inc. | $127,864.86 |
| 2 | 28218 | F. J. Burnell, Inc. | $155,675.00 |
| 3 | 39001 | Jd's Rebar & Construction Inc. | $193,000.00 |
| 4 | 48462 | Fessler And Bowman, Inc. | $240,937.87 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Ronald G. Carlson Inc. |
- 2 - F. J. Burnell, Inc. |
- 3 - Jd's Rebar & Construction Inc. |
- 4 - Fessler And Bowman, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 | 5,300.00 | 5,300.00 | 12,608.57 | 12,608.57 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 4,800.00 | 4,800.00 | 12,608.57 | 12,608.57 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 40 | SQYD | 25.00 | 1,000.00 | 10.00 | 400.00 | 40.50 | 1,620.00 | 35.30 | 1,412.00 |
| 0004 | 202-02-02020 | Removal of Asphalt Pavement | 80 | SQYD | 6.25 | 500.00 | 10.00 | 800.00 | 29.50 | 2,360.00 | 40.35 | 3,228.00 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 125 | SQYD | 8.00 | 1,000.00 | 10.00 | 1,250.00 | 18.00 | 2,250.00 | 28.37 | 3,546.25 |
| 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 10 | LNFT | 25.00 | 250.00 | 25.00 | 250.00 | 157.00 | 1,570.00 | 81.96 | 819.60 |
| 0007 | 202-02-32000 | Removal of Paved Ditches | 8 | SQYD | 62.50 | 500.00 | 50.00 | 400.00 | 214.00 | 1,712.00 | 63.04 | 504.32 |
| 0008 | 202-02-32100 | Removal of Pipe (Cross Drain) (Sta. 20 + 71) | 54 | LNFT | 4.63 | 250.02 | 20.00 | 1,080.00 | 51.00 | 2,754.00 | 22.70 | 1,225.80 |
| 0009 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 20 | SQYD | 25.00 | 500.00 | 20.00 | 400.00 | 174.00 | 3,480.00 | 204.26 | 4,085.20 |
| 0010 | 204-02-00100 | Temporary Hay or Straw Bales | 8 | EACH | 18.75 | 150.00 | 20.00 | 160.00 | 77.00 | 616.00 | 151.30 | 1,210.40 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 2,400 | LNFT | 1.67 | 4,008.00 | 1.50 | 3,600.00 | 0.60 | 1,440.00 | 3.78 | 9,072.00 |
| 0013 | 510-01-00102 | Pavement Patching (8" Minimum Thickness) | 50 | SQYD | 60.00 | 3,000.00 | 100.00 | 5,000.00 | 57.00 | 2,850.00 | 151.30 | 7,565.00 |
| 0014 | 701-01-02000 | Cross Drain Pipe (24" RCP/PP or 30" CMP) | 62 | LNFT | 70.00 | 4,340.00 | 100.00 | 6,200.00 | 146.00 | 9,052.00 | 110.96 | 6,879.52 |
| 0015 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 34 | LNFT | 58.83 | 2,000.22 | 90.00 | 3,060.00 | 150.00 | 5,100.00 | 84.48 | 2,872.32 |
| 0016 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 18 | LNFT | 55.55 | 999.90 | 100.00 | 1,800.00 | 234.00 | 4,212.00 | 94.56 | 1,702.08 |
| 0017 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) | 4 | LNFT | 62.50 | 250.00 | 150.00 | 600.00 | 470.00 | 1,880.00 | 73.13 | 292.52 |
| 0018 | 702-03-00100 | Catch Basins (CB-01) | 7 | EACH | 4,000.00 | 28,000.00 | 3,500.00 | 24,500.00 | 2,435.00 | 17,045.00 | 3,152.14 | 22,064.98 |
| 0019 | 706-01-00100 | Concrete Walk (4" Thick) | 585 | SQYD | 55.00 | 32,175.00 | 45.00 | 26,325.00 | 49.00 | 28,665.00 | 36.21 | 21,182.85 |
| 0020 | 706-02-00200 | Concrete Drive (6" Thick) | 151 | SQYD | 65.00 | 9,815.00 | 48.00 | 7,248.00 | 67.00 | 10,117.00 | 100.56 | 15,184.56 |
| 0021 | 706-04-00100 | Handicapped Curb Ramps | 14 | EACH | 1,000.00 | 14,000.00 | 1,000.00 | 14,000.00 | 1,199.00 | 16,786.00 | 1,765.20 | 24,712.80 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | 3,500.00 | 3,500.00 | 7,565.14 | 7,565.14 |
| 0023 | 727-01-00100 | Mobilization | 1 | LUMP | 1,500.00 | 1,500.00 | 15,000.00 | 15,000.00 | 30,833.50 | 30,833.50 | 26,982.34 | 26,982.34 |
| 0024 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 525 | LNFT | 7.50 | 3,937.50 | 2.00 | 1,050.00 | 11.00 | 5,775.00 | 8.83 | 4,635.75 |
| 0025 | 732-05-00100 | Removal of Existing Markings | 0.1 | MILE | 7,500.00 | 750.00 | 15,000.00 | 1,500.00 | 25,488.00 | 2,548.80 | 7,565.14 | 756.51 |
| 0026 | 739-01-00100 | Hydro-Seeding | 0.25 | ACRE | 6,800.00 | 1,700.00 | 5,000.00 | 1,250.00 | 7,063.00 | 1,765.75 | 7,565.14 | 1,891.29 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 500.00 | 500.00 | 3,000.00 | 3,000.00 | 6,500.00 | 6,500.00 | 6,304.29 | 6,304.29 |
| 0028 | 741-07-00100 | Relocating Water Valve | 1 | EACH | 1,500.00 | 1,500.00 | 3,000.00 | 3,000.00 | 2,119.00 | 2,119.00 | 6,304.29 | 6,304.29 |
| 0029 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 215 | INLF | 1.86 | 399.90 | 2.00 | 430.00 | 5.37 | 1,154.55 | 18.91 | 4,065.65 |
| 0030 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 236 | INLF | 5.08 | 1,198.88 | 2.00 | 472.00 | 5.40 | 1,274.40 | 18.91 | 4,462.76 |
| 0031 | NS-ENH-03081 | Concrete (Decorative Surface Treatment) (Sta. 11+75.92 to Sta.11+89.85) | 27 | SQYD | 18.52 | 500.04 | 100.00 | 2,700.00 | 96.00 | 2,592.00 | 126.09 | 3,404.43 |
| 0032 | NS-ENH-08000 | Handrails (Sta. 15+54.61 to Sta.17+06.93) | 152 | LNFT | 16.45 | 2,500.40 | 100.00 | 15,200.00 | 59.00 | 8,968.00 | 126.09 | 19,165.68 |
| 0033 | 302-02-01061 | Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) | 40 | SQYD | 16.00 | 640.00 | 25.00 | 1,000.00 | 59.00 | 2,360.00 | 65.56 | 2,622.40 |
| CONTRACTOR TOTAL | 127,864.86 | 155,675.00 | 193,000.00 | 240,937.87 | ||||||||