LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: H.003424.6-R1
Parish: Livingston
Routes: I-12
Description: I-12: LIVINGSTON PAR APPROACH SLAB REP P1
Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, BRIDGE REPAIRS, ALT. AA1-THIN ASPHALTIC CONCRETE (OGFC) & SUPERPAVE ASPHALTIC CONCRETE; ALT. AA2-THIN ASPHALTIC CONCRETE (OGFC), SUPERPAVE ASPHALTIC CONCRETE & PCCP, AND RELATED WORK.
Estimated Construction Cost: $20,986,818.38
Maximum Number of Days Allowed for Construction: 9999
Calculated Daily User Cost: $5,000.00


RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 34567 James Construction Group LLC $17,882,386.32 404 $19,902,386.32
2 12312 Gilchrist Construction Co. LLC $18,465,155.74 359 $20,260,155.74
3 39462 Jb James Construction Llc $19,609,644.68 390 $21,559,644.68
4 06276 Barriere Construction Co., LLC. $20,324,335.26 360 $22,124,335.26


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
James Construction Group LLC
- 2 -
Gilchrist Construction Co. LLC
- 3 -
Jb James Construction Llc
- 4 -
Barriere Construction Co., LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 60,000.00 60,000.00 450,000.00 450,000.00 230,000.00 230,000.00 32,000.00 32,000.00
0002 202-01-00100 Removal of Structures and Obstructions 1      LUMP 145,000.00 145,000.00 10,000.00 10,000.00 194,000.00 194,000.00 190,000.00 190,000.00
0003 202-02-06000 Removal of Concrete Approach Slabs 933      SQYD 78.00 72,774.00 50.00 46,650.00 28.00 26,124.00 30.00 27,990.00
0004 202-02-06060 Removal of Concrete Catch Basin 8      EACH 375.00 3,000.00 1,500.00 12,000.00 500.00 4,000.00 100.00 800.00
0005 202-02-14500 Removal of Guard Rail 3,620      LNFT 4.75 17,195.00 2.30 8,326.00 4.00 14,480.00 5.00 18,100.00
0006 202-02-32100 Removal of Pipe (Cross Drain) as per table 56      LNFT 30.00 1,680.00 60.00 3,360.00 15.00 840.00 10.00 560.00
0007 202-02-32500 Removal of Portland Cement Concrete Pavement 15,786      SQYD 10.00 157,860.00 15.00 236,790.00 10.00 157,860.00 30.00 473,580.00
0008 202-02-38300 Removal of Sign and U-Channel Post 3      EACH 10.00 30.00 350.00 1,050.00 100.00 300.00 11.00 33.00
0009 202-02-38500 Removal of Surfacing and Stablized Base 15,879      SQYD 6.00 95,274.00 4.40 69,867.60 3.50 55,576.50 9.00 142,911.00
0010 202-03-38000 Relocation of Sign improper height &/or Construction Impact 3      EACH 200.00 600.00 1,000.00 3,000.00 1,000.00 3,000.00 320.00 960.00
0011 203-01-00100 General Excavation 5,463      CUYD 2.50 13,657.50 6.00 32,778.00 9.00 49,167.00 15.00 81,945.00
0012 203-03-00100 Embankment 17,277      CUYD 13.00 224,601.00 16.00 276,432.00 23.00 397,371.00 38.00 656,526.00
0013 204-02-00100 Temporary Hay or Straw Bales 532      EACH 16.00 8,512.00 15.00 7,980.00 10.00 5,320.00 5.00 2,660.00
0014 204-06-00100 Temporary Silt Fencing 21,282      LNFT 3.00 63,846.00 1.50 31,923.00 1.60 34,051.20 0.50 10,641.00
0015 302-02-01060 Class II Base Course (4" Thick) (Stone or Recycled Portland Cement Concrete) 77,442      SQYD 6.00 464,652.00 8.00 619,536.00 9.00 696,978.00 7.00 542,094.00
0016 302-02-03020 Class II Base Course (8" Thick) (Soil Cement) 77,442      SQYD 11.00 851,862.00 11.00 851,862.00 8.00 619,536.00 15.00 1,161,630.00
0017 302-02-06121 Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 2,788      SQYD 14.00 39,032.00 40.00 111,520.00 22.00 61,336.00 28.00 78,064.00
0018 304-05-00100 Lime Treatment (Type E) 1,136      TON 20.00 22,720.00 80.00 90,880.00 50.00 56,800.00 5.00 5,680.00
0020 509-01-00100 Cold Planing Asphaltic Pavement 35,358      SQYD 7.45 263,417.10 1.50 53,037.00 2.00 70,716.00 3.75 132,592.50
0021 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -2,937      CUYD 9.45 -27,754.65 1.00 -2,937.00 0.10 -293.70 75.00 -220,275.00
0022 510-01-00250 Pavement Patching (14 inch Minimum Thickness) 1,200      SQYD 100.00 120,000.00 50.00 60,000.00 100.00 120,000.00 50.00 60,000.00
0023 701-03-01020 Storm Drain Pipe (18" RCP/PP) 425      LNFT 50.00 21,250.00 55.00 23,375.00 50.00 21,250.00 100.00 42,500.00
0024 702-03-00100 Catch Basins (CB-01) 3      EACH 3,500.00 10,500.00 3,000.00 9,000.00 2,500.00 7,500.00 5,700.00 17,100.00
0025 702-04-00200 Adjusting Catch Basins 6      EACH 2,500.00 15,000.00 1,600.00 9,600.00 1,500.00 9,000.00 4,000.00 24,000.00
0026 703-01-00100 Shoulder Underdrain Systems 650      LNFT 10.00 6,500.00 100.00 65,000.00 13.00 8,450.00 14.25 9,262.50
0027 703-03-00100 Perforated Pipe Underdrains 335      LNFT 7.00 2,345.00 35.00 11,725.00 13.00 4,355.00 28.00 9,380.00
0028 703-04-00100 Nonperforated Pipe Underdrains 100      LNFT 45.00 4,500.00 45.00 4,500.00 18.00 1,800.00 75.00 7,500.00
0029 704-02-00100 Guard Rail (Double Faced) 225      LNFT 30.00 6,750.00 26.00 5,850.00 30.00 6,750.00 32.00 7,200.00
0030 704-03-00100 Blocked Out Guard Rail 1,000      LNFT 18.00 18,000.00 22.00 22,000.00 18.00 18,000.00 21.00 21,000.00
0031 704-07-00200 Guard Rail Bridge Attachments (Single Thrie Beam) 198      LNFT 40.00 7,920.00 34.00 6,732.00 40.00 7,920.00 32.00 6,336.00
0032 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 500      LNFT 65.00 32,500.00 60.00 30,000.00 65.00 32,500.00 62.00 31,000.00
0033 704-11-00100 Guard Rail End Treatment (Flared) 8      EACH 2,100.00 16,800.00 2,000.00 16,000.00 2,100.00 16,800.00 1,850.00 14,800.00
0034 704-11-00300 Guard Rail End Treatment (Bi-Directional) 6      EACH 4,900.00 29,400.00 5,000.00 30,000.00 4,900.00 29,400.00 4,800.00 28,800.00
0035 707-01-00100 Concrete Curb 160      LNFT 24.00 3,840.00 50.00 8,000.00 15.00 2,400.00 35.00 5,600.00
0036 710-01-00100 Flowable Fill 184      CUYD 160.00 29,440.00 100.00 18,400.00 160.00 29,440.00 50.00 9,200.00
0037 711-01-06000 Riprap (250 lb, 30" Thick) 171      SQYD 115.00 19,665.00 125.00 21,375.00 110.00 18,810.00 150.00 25,650.00
0038 711-04-00100 Geotextile Fabric 312      SQYD 5.00 1,560.00 2.00 624.00 2.50 780.00 3.00 936.00
0039 712-04-00100 Flexible Revetment 3,550      SQYD 55.00 195,250.00 35.00 124,250.00 45.00 159,750.00 51.00 181,050.00
0040 713-01-00100 Temporary Signs and Barricades 1      LUMP 35,000.00 35,000.00 250,000.00 250,000.00 200,000.00 200,000.00 275,000.00 275,000.00
0041 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 8.05   MILE 285.00 2,294.25 320.00 2,576.00 300.00 2,415.00 300.00 2,415.00
0042 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 16.1    MILE 450.00 7,245.00 500.00 8,050.00 480.00 7,728.00 475.00 7,647.50
0043 713-06-00100 Temporary Reflectorized Raised Pavement Markers 6,386      EACH 4.00 25,544.00 4.85 30,972.10 4.50 28,737.00 6.00 38,316.00
0044 713-07-00100 Temporary Precast Concrete Barrier (Contractor Furnished) 932      EACH 225.00 209,700.00 250.00 233,000.00 450.00 419,400.00 400.00 372,800.00
0045 713-08-00100 Temporary Precast Concrete Barrier (Department Furnished) 419      EACH 225.00 94,275.00 225.00 94,275.00 160.00 67,040.00 190.00 79,610.00
0046 713-10-00100 Temporary Precast Concrete Barrier Movement 1,182      EACH 24.00 28,368.00 15.00 17,730.00 20.00 23,640.00 15.00 17,730.00
0047 721-01-00100 Mowing 13.3    ACRE 300.00 3,990.00 1,000.00 13,300.00 200.00 2,660.00 3,000.00 39,900.00
0048 722-01-00100 Project Site Laboratory 3      EACH 20,100.00 60,300.00 5,000.00 15,000.00 5,000.00 15,000.00 0.01 0.03
0049 726-01-00100 Bedding Material 72.3    CUYD 67.00 4,844.10 90.00 6,507.00 80.00 5,784.00 10.00 723.00
0050 727-01-00100 Mobilization 1      LUMP 550,000.00 550,000.00 1,750,000.00 1,750,000.00 1,850,000.00 1,850,000.00 1,800,000.00 1,800,000.00
0051 729-16-00100 Object Marker Assembly (Type 1) 22      EACH 75.00 1,650.00 75.00 1,650.00 40.00 880.00 80.00 1,760.00
0052 731-02-00100 Reflectorized Raised Pavement Markers 1,542      EACH 4.25 6,553.50 4.80 7,401.60 4.50 6,939.00 6.00 9,252.00
0053 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 8.05   MILE 2,500.00 20,125.00 2,700.00 21,735.00 2,500.00 20,125.00 2,700.00 21,735.00
0054 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.04   MILE 700.00 2,828.00 800.00 3,232.00 700.00 2,828.00 730.00 2,949.20
0055 732-05-00100 Removal of Existing Markings 4.04   MILE 2,500.00 10,100.00 2,800.00 11,312.00 2,500.00 10,100.00 2,500.00 10,100.00
0056 733-01-00200 Concrete Roadway Barrier (Double Faced) 8,666      LNFT 280.00 2,426,480.00 235.00 2,036,510.00 270.00 2,339,820.00 300.00 2,599,800.00
0057 739-01-00100 Hydro-Seeding 3.33   ACRE 1,250.00 4,162.50 1,400.00 4,662.00 2,700.00 8,991.00 1,320.00 4,395.60
0058 740-01-00100 Construction Layout 1      LUMP 100,000.00 100,000.00 70,000.00 70,000.00 200,000.00 200,000.00 200,000.00 200,000.00
0059 804-01-00300 Precast Concrete Piles (16") 10,662      LNFT 55.00 586,410.00 45.00 479,790.00 56.00 597,072.00 59.00 629,058.00
0060 804-13-00100 Precast Concrete Indicator Piles 4      EACH 18,500.00 74,000.00 22,000.00 88,000.00 24,000.00 96,000.00 27,500.00 110,000.00
0061 804-17-00100 Dynamic Monitoring 16      EACH 1,545.00 24,720.00 500.00 8,000.00 1,000.00 16,000.00 1,000.00 16,000.00
0062 805-01-00700 Class A Concrete (Bents) 301.82   CUYD 1,165.00 351,620.30 925.00 279,183.50 1,200.00 362,184.00 1,400.00 422,548.00
0063 805-03-00100 Class AA Concrete 1,671.8    CUYD 565.00 944,567.00 850.00 1,421,030.00 620.00 1,036,516.00 680.00 1,136,824.00
0064 805-09-00100 Expansion Joint Seal 3,848.1    LNFT 20.00 76,962.00 8.00 30,784.80 16.00 61,569.60 18.00 69,265.80
0065 806-01-00100 Deformed Reinforcing Steel 463,784      LB 0.88 408,129.92 0.72 333,924.48 1.25 579,730.00 1.40 649,297.60
0066 810-01-00100 Concrete Railing (Standard Barrier) 2,434.24   LNFT 60.00 146,054.40 65.00 158,225.60 62.00 150,922.88 67.00 163,094.08
0067 810-01-00200 Concrete Railing (Slotted Barrier) 850      LNFT 65.00 55,250.00 70.00 59,500.00 65.00 55,250.00 67.00 56,950.00
0068 813-01-00100 Concrete Approach Slabs 5,354.12   SQYD 220.00 1,177,906.40 198.00 1,060,115.76 210.00 1,124,365.20 220.00 1,177,906.40
0069 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 26,880      INLF 0.75 20,160.00 0.35 9,408.00 0.70 18,816.00 0.01 268.80
0070 NS-700-00180 Impact Attenuator (Construction Zone) 6      EACH 2,500.00 15,000.00 2,500.00 15,000.00 15,000.00 90,000.00 10,000.00 60,000.00
0071 NS-700-00181 Impact Attenuator Relocation (Construction Zone) 12      EACH 800.00 9,600.00 1,200.00 14,400.00 1,000.00 12,000.00 2,000.00 24,000.00
0072 NS-713-00001 Dynamic Message Sign Unit 6      EACH 850.00 5,100.00 12,000.00 72,000.00 5,000.00 30,000.00 5,000.00 30,000.00
0073 NS-724-00002 Rumble Strips (Shoulder Ground-In) 8.06   MILE 300.00 2,418.00 850.00 6,851.00 800.00 6,448.00 1,400.00 11,284.00
0079 202-02-02020 Removal of Asphalt Pavement 6,244      SQYD 2.50 15,610.00 5.50 34,342.00 3.00 18,732.00 2.00 12,488.00
0080 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 579      TON 155.00 89,745.00 150.00 86,850.00 150.00 86,850.00 110.00 63,690.00
0081 725-01-00100 Temporary Detour Roads 7,456      SQYD 87.00 648,672.00 22.00 164,032.00 80.00 596,480.00 58.00 432,448.00
    SUBTOTAL GENERAL       11,264,562   12,279,835   13,323,090   14,389,062
                         
  Alternate AA1                      
                         
0074 501-01-00006 Thin Asphaltic Concrete (OGFC) 5,421      TON 0.00 0.00 155.00 840,255.00 0.00 0.00 123.00 666,783.00
0075 502-01-00100 Superpave Asphaltic Concrete 65,756      TON 0.00 0.00 80.00 5,260,480.00 0.00 0.00 79.00 5,194,724.00
0082 501-02-00001 Tack Coat 19,671      GAL 0.00 0.00 4.30 84,585.30 0.00 0.00 3.75 73,766.25
    SUBTOTAL ALT AA1       00   6,185,320   00   5,935,273
                         
  Alternate AA2                      
                         
0076 501-01-00006 Thin Asphaltic Concrete (OGFC) 3,654      TON 168.00 613,872.00 0.00 0.00 160.00 584,640.00 0.00 0.00
0077 502-01-00100 Superpave Asphaltic Concrete 36,506      TON 87.00 3,176,022.00 0.00 0.00 88.00 3,212,528.00 0.00 0.00
0078 601-01-01100 Portland Cement Concrete Pavement (13" Thick) 42,147      SQYD 64.00 2,697,408.00 0.00 0.00 55.00 2,318,085.00 0.00 0.00
0083 501-02-00001 Tack Coat 13,260      GAL 4.00 53,040.00 0.00 0.00 4.00 53,040.00 0.00 0.00
0084 706-03-00100 Incidental Concrete Paving (4" Thick) 2,039      SQYD 38.00 77,482.00 0.00 0.00 58.00 118,262.00 0.00 0.00
    SUBTOTAL ALT AA2       6,617,824.00   0.00   6,286,555.00   0.00
                         
    ITEM TOTAL (CONSTRUCTION BID)       17,882,386.32   18,465,155.74   19,609,644.68   20,324,335.26
    NUMBER OF DAYS BID AT $5000 PER DAY.       2,020,000.00   1,795,000.00   1,950,000.00   1,800,000.00
    TOTAL BID       19,902,386.32   20,260,155.74   21,559,644.68   22,124,335.26