Bid Tabulations
Letting of
01/25/2012
LA DOTD Headquarters
| Lead Project: H.003193.6-R1 | |
| Parish: Calcasieu | |
| Routes: I-10 | |
| Description: OPASS LA 1256 AT SULPHUR TO WEST END CALCASIEU RIVER BRIDGE | |
| Type Const: GUARD RAIL, SIGNING, AND RELATED WORK. | |
| Estimated Construction Cost: $1,307,123.20 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 35849 | T.L. Construction LLC | $1,005,053.13 |
| 2 | 34068 | Alpha Service and Products, Inc. | $1,037,812.60 |
| 3 | 48896 | Command Construction Industries LLC | $1,096,813.25 |
| 4 | 54939 | Ozark Striping Co. Inc | $1,104,467.08 |
| 5 | 23811 | Highway Technologies Inc | $1,393,434.95 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - T.L. Construction LLC |
- 2 - Alpha Service and Products, Inc. |
- 3 - Command Construction Industries LLC |
- 4 - Ozark Striping Co. Inc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 631.25 | LNFT | 3.30 | 2,083.13 | 4.00 | 2,525.00 | 10.00 | 6,312.50 | 5.30 | 3,345.63 |
| 0002 | 202-02-38220 | Removal of Sign Supports | 207 | EACH | 84.00 | 17,388.00 | 90.00 | 18,630.00 | 50.00 | 10,350.00 | 75.00 | 15,525.00 |
| 0003 | 202-02-38280 | Removal of Sign Fascia Mountings | 2 | EACH | 110.60 | 221.20 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
| 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 48 | EACH | 1.00 | 48.00 | 15.00 | 720.00 | 10.00 | 480.00 | 30.00 | 1,440.00 |
| 0005 | 202-02-38360 | Removal of Sign Faces | 380 | EACH | 5.60 | 2,128.00 | 30.00 | 11,400.00 | 40.00 | 15,200.00 | 50.00 | 19,000.00 |
| 0006 | 202-02-38380 | Removal of Sign Truss and Footings | 4 | EACH | 8,900.00 | 35,600.00 | 1,800.00 | 7,200.00 | 5,000.00 | 20,000.00 | 4,000.00 | 16,000.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 5,500.00 | 5,500.00 | 7,500.00 | 7,500.00 | 1,000.00 | 1,000.00 | 15,000.00 | 15,000.00 |
| 0008 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 125 | LNFT | 58.00 | 7,250.00 | 60.00 | 7,500.00 | 50.00 | 6,250.00 | 68.90 | 8,612.50 |
| 0009 | 704-03-00100 | Blocked Out Guard Rail | 318.75 | LNFT | 20.00 | 6,375.00 | 20.00 | 6,375.00 | 25.00 | 7,968.75 | 21.20 | 6,757.50 |
| 0010 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 31.25 | LNFT | 98.00 | 3,062.50 | 100.00 | 3,125.00 | 100.00 | 3,125.00 | 106.00 | 3,312.50 |
| 0011 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 62.5 | LNFT | 48.00 | 3,000.00 | 75.00 | 4,687.50 | 50.00 | 3,125.00 | 90.10 | 5,631.25 |
| 0012 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 2,000.00 | 6,000.00 | 2,400.00 | 7,200.00 | 2,500.00 | 7,500.00 | 2,650.00 | 7,950.00 |
| 0013 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 990 | SQYD | 56.00 | 55,440.00 | 40.00 | 39,600.00 | 40.00 | 39,600.00 | 44.00 | 43,560.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 33,500.00 | 33,500.00 | 18,000.00 | 18,000.00 | 1,000.00 | 1,000.00 | 25,000.00 | 25,000.00 |
| 0015 | 717-01-00100 | Seeding | 61.5 | LB | 16.60 | 1,020.90 | 17.00 | 1,045.50 | 1.00 | 61.50 | 10.00 | 615.00 |
| 0016 | 718-01-00100 | Fertilizer | 1,050 | LB | 1.00 | 1,050.00 | 0.90 | 945.00 | 0.10 | 105.00 | 1.00 | 1,050.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 102,000.00 | 102,000.00 | 80,000.00 | 80,000.00 | 100,000.00 | 100,000.00 | 70,000.00 | 70,000.00 |
| 0018 | 729-01-00100 | Sign (Type A) | 2,329.2 | SQFT | 8.00 | 18,633.60 | 13.00 | 30,279.60 | 10.00 | 23,292.00 | 14.00 | 32,608.80 |
| 0019 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 243.4 | SQFT | 8.00 | 1,947.20 | 13.00 | 3,164.20 | 10.00 | 2,434.00 | 14.00 | 3,407.60 |
| 0020 | 729-02-00100 | Sign (Type B) | 48.2 | SQFT | 8.00 | 385.60 | 24.00 | 1,156.80 | 10.00 | 482.00 | 14.00 | 674.80 |
| 0021 | 729-04-00100 | Sign (Type D) | 2,074.5 | SQFT | 14.00 | 29,043.00 | 17.00 | 35,266.50 | 15.00 | 31,117.50 | 19.00 | 39,415.50 |
| 0022 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 324 | SQFT | 14.00 | 4,536.00 | 20.00 | 6,480.00 | 15.00 | 4,860.00 | 19.00 | 6,156.00 |
| 0023 | 729-05-00100 | Sign (Type E) | 102 | SQFT | 20.00 | 2,040.00 | 22.00 | 2,244.00 | 20.00 | 2,040.00 | 20.00 | 2,040.00 |
| 0024 | 729-05-00102 | Sign (Type E)(Furnish and Install) | 527 | SQFT | 20.00 | 10,540.00 | 22.00 | 11,594.00 | 20.00 | 10,540.00 | 20.00 | 10,540.00 |
| 0025 | 729-06-00100 | Sign (Overhead Mounted) | 2,205 | SQFT | 14.00 | 30,870.00 | 17.00 | 37,485.00 | 20.00 | 44,100.00 | 20.00 | 44,100.00 |
| 0026 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 6,473.5 | SQFT | 14.00 | 90,629.00 | 17.00 | 110,049.50 | 20.00 | 129,470.00 | 20.00 | 129,470.00 |
| 0027 | 729-08-00100 | Mounting (2 1/2" Size Post) | 112 | EACH | 512.00 | 57,344.00 | 650.00 | 72,800.00 | 500.00 | 56,000.00 | 500.00 | 56,000.00 |
| 0028 | 729-08-00200 | Mounting (3 1/2" Size Post) | 69 | EACH | 660.00 | 45,540.00 | 700.00 | 48,300.00 | 800.00 | 55,200.00 | 595.00 | 41,055.00 |
| 0029 | 729-08-00220 | Mounting (3 1/2" Size Post)(Median Barrier Mount) | 1 | EACH | 990.00 | 990.00 | 1,400.00 | 1,400.00 | 3,000.00 | 3,000.00 | 1,000.00 | 1,000.00 |
| 0030 | 729-08-00500 | Mounting (S3 x 5.7 Size Post) | 4 | EACH | 700.00 | 2,800.00 | 710.00 | 2,840.00 | 3,000.00 | 12,000.00 | 700.00 | 2,800.00 |
| 0031 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 78 | EACH | 885.00 | 69,030.00 | 900.00 | 70,200.00 | 750.00 | 58,500.00 | 750.00 | 58,500.00 |
| 0032 | 729-08-00700 | Mounting (W8 x 18 Size Post) | 14 | EACH | 1,223.00 | 17,122.00 | 1,100.00 | 15,400.00 | 1,000.00 | 14,000.00 | 1,000.00 | 14,000.00 |
| 0033 | 729-09-00500 | Mounting (Overhead Truss) (Ground Mounted) (84' Span) | 2 | EACH | 55,000.00 | 110,000.00 | 52,000.00 | 104,000.00 | 61,000.00 | 122,000.00 | 68,000.00 | 136,000.00 |
| 0034 | 729-09-00700 | Mounting (Overhead Truss) (Ground Mounted) (96' Span) | 1 | EACH | 57,000.00 | 57,000.00 | 54,000.00 | 54,000.00 | 62,000.00 | 62,000.00 | 72,000.00 | 72,000.00 |
| 0035 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 1 | EACH | 27,500.00 | 27,500.00 | 28,000.00 | 28,000.00 | 30,000.00 | 30,000.00 | 28,000.00 | 28,000.00 |
| 0036 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 5 | EACH | 6,480.00 | 32,400.00 | 6,500.00 | 32,500.00 | 5,200.00 | 26,000.00 | 5,000.00 | 25,000.00 |
| 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 7 | EACH | 83.00 | 581.00 | 100.00 | 700.00 | 100.00 | 700.00 | 100.00 | 700.00 |
| 0038 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 1 | EACH | 14,300.00 | 14,300.00 | 24,000.00 | 24,000.00 | 23,000.00 | 23,000.00 | 20,350.00 | 20,350.00 |
| 0039 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 6 | EACH | 14,450.00 | 86,700.00 | 18,000.00 | 108,000.00 | 25,000.00 | 150,000.00 | 20,350.00 | 122,100.00 |
| 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,200.00 | 3,200.00 | 3,000.00 | 3,000.00 | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 |
| 0041 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 5,100.00 | 10,200.00 | 8,000.00 | 16,000.00 | 5,000.00 | 10,000.00 | 4,000.00 | 8,000.00 |
| 0042 | NS-729-00008 | Remove Sign, Flashing Beacon Ground Mounted | 1 | EACH | 55.00 | 55.00 | 500.00 | 500.00 | 1,000.00 | 1,000.00 | 750.00 | 750.00 |
| CONTRACTOR TOTAL | 1,005,053.13 | 1,037,812.60 | 1,096,813.25 | 1,104,467.08 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Highway Technologies Inc |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-14500 | Removal of Guard Rail | 631.25 | LNFT | 4.00 | 2,525.00 |
| 0002 | 202-02-38220 | Removal of Sign Supports | 207 | EACH | 131.00 | 27,117.00 |
| 0003 | 202-02-38280 | Removal of Sign Fascia Mountings | 2 | EACH | 325.00 | 650.00 |
| 0004 | 202-02-38300 | Removal of Sign and U-Channel Post | 48 | EACH | 25.00 | 1,200.00 |
| 0005 | 202-02-38360 | Removal of Sign Faces | 380 | EACH | 25.00 | 9,500.00 |
| 0006 | 202-02-38380 | Removal of Sign Truss and Footings | 4 | EACH | 3,700.00 | 14,800.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 8,500.00 | 8,500.00 |
| 0008 | 704-01-02000 | Guard Rail (DoubleThrie Beam) (3'-1 1/2" post spacing) | 125 | LNFT | 48.00 | 6,000.00 |
| 0009 | 704-03-00100 | Blocked Out Guard Rail | 318.75 | LNFT | 17.00 | 5,418.75 |
| 0010 | 704-06-00200 | Guard Rail Anchor Sections (Trailing End) (Single Thrie Beam) | 31.25 | LNFT | 77.00 | 2,406.25 |
| 0011 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 62.5 | LNFT | 51.00 | 3,187.50 |
| 0012 | 704-11-00100 | Guard Rail End Treatment (Flared) | 3 | EACH | 1,650.00 | 4,950.00 |
| 0013 | 706-03-00100 | Incidental Concrete Paving (4" Thick) | 990 | SQYD | 61.00 | 60,390.00 |
| 0014 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 51,000.00 | 51,000.00 |
| 0015 | 717-01-00100 | Seeding | 61.5 | LB | 16.00 | 984.00 |
| 0016 | 718-01-00100 | Fertilizer | 1,050 | LB | 1.00 | 1,050.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 |
| 0018 | 729-01-00100 | Sign (Type A) | 2,329.2 | SQFT | 11.00 | 25,621.20 |
| 0019 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 243.4 | SQFT | 11.00 | 2,677.40 |
| 0020 | 729-02-00100 | Sign (Type B) | 48.2 | SQFT | 18.00 | 867.60 |
| 0021 | 729-04-00100 | Sign (Type D) | 2,074.5 | SQFT | 18.00 | 37,341.00 |
| 0022 | 729-04-00102 | Sign (Type D)(Furnish and Install) | 324 | SQFT | 20.00 | 6,480.00 |
| 0023 | 729-05-00100 | Sign (Type E) | 102 | SQFT | 17.50 | 1,785.00 |
| 0024 | 729-05-00102 | Sign (Type E)(Furnish and Install) | 527 | SQFT | 18.00 | 9,486.00 |
| 0025 | 729-06-00100 | Sign (Overhead Mounted) | 2,205 | SQFT | 20.00 | 44,100.00 |
| 0026 | 729-06-00102 | Sign (Overhead Mounted)(Furnish and Install) | 6,473.5 | SQFT | 21.50 | 139,180.25 |
| 0027 | 729-08-00100 | Mounting (2 1/2" Size Post) | 112 | EACH | 648.00 | 72,576.00 |
| 0028 | 729-08-00200 | Mounting (3 1/2" Size Post) | 69 | EACH | 799.00 | 55,131.00 |
| 0029 | 729-08-00220 | Mounting (3 1/2" Size Post)(Median Barrier Mount) | 1 | EACH | 882.00 | 882.00 |
| 0030 | 729-08-00500 | Mounting (S3 x 5.7 Size Post) | 4 | EACH | 908.00 | 3,632.00 |
| 0031 | 729-08-00600 | Mounting (W6 x 12 Size Post) | 78 | EACH | 977.00 | 76,206.00 |
| 0032 | 729-08-00700 | Mounting (W8 x 18 Size Post) | 14 | EACH | 1,270.00 | 17,780.00 |
| 0033 | 729-09-00500 | Mounting (Overhead Truss) (Ground Mounted) (84' Span) | 2 | EACH | 59,665.00 | 119,330.00 |
| 0034 | 729-09-00700 | Mounting (Overhead Truss) (Ground Mounted) (96' Span) | 1 | EACH | 63,420.00 | 63,420.00 |
| 0035 | 729-11-00100 | Mounting (Overhead Cantilever) (Ground Mounted) | 1 | EACH | 34,610.00 | 34,610.00 |
| 0036 | 729-13-00100 | Mounting (Bridge Fascia Mounted) | 5 | EACH | 6,850.00 | 34,250.00 |
| 0037 | 729-16-00300 | Object Marker Assembly (Type 3) | 7 | EACH | 63.00 | 441.00 |
| 0038 | 729-20-00600 | Footings for Overhead Mountings (Cantilever) | 1 | EACH | 58,000.00 | 58,000.00 |
| 0039 | 729-20-00700 | Footings for Overhead Mountings (Truss) | 6 | EACH | 48,000.00 | 288,000.00 |
| 0040 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,650.00 | 10,650.00 |
| 0041 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 4,445.00 | 8,890.00 |
| 0042 | NS-729-00008 | Remove Sign, Flashing Beacon Ground Mounted | 1 | EACH | 2,420.00 | 2,420.00 |
| CONTRACTOR TOTAL | 1,393,434.95 | |||||