Bid Tabulations
Letting of
07/10/2013
LA DOTD Headquarters
| Lead Project: H.003002.6 | |
| Parish: Lafayette | |
| Routes: | |
| Description: LA DOTD LIGHTING REHABILITATION | |
| Type Const: LIGHTING AND RELATED WORK | |
| Estimated Construction Cost: $698,643.85 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 07764 | Grady Crawford Const. Co., Inc. | $673,801.24 |
| 2 | 22027 | Sun Elect. & Instrumentation Inc. | $706,605.28 |
| 3 | 48452 | Webster Electric Co., Inc. | $712,697.50 |
| 4 | 05473 | Jack B. Harper Electrical LLC | $761,538.50 |
| 5 | 01165 | Ernest P. Breaux Electrical, Inc. | $776,662.25 |
| 6 | 08470 | Diamond Electrical Co., Inc. | $777,047.80 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Grady Crawford Const. Co., Inc. |
- 2 - Sun Elect. & Instrumentation Inc. |
- 3 - Webster Electric Co., Inc. |
- 4 - Jack B. Harper Electrical LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 39,032.03 | 39,032.03 | 3,912.00 | 3,912.00 | 48,500.00 | 48,500.00 | 25,000.00 | 25,000.00 |
| 0002 | 727-01-00100 | Mobilization | 1 | LUMP | 35,300.00 | 35,300.00 | 6,000.00 | 6,000.00 | 47,600.00 | 47,600.00 | 20,000.00 | 20,000.00 |
| 0003 | 730-01-00100 | Trenching and Backfilling | 28,860 | LNFT | 1.98 | 57,142.80 | 2.70 | 77,922.00 | 1.05 | 30,303.00 | 3.80 | 109,668.00 |
| 0004 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (W/ 2-#6 & 1-#6 CU Bare Ground) | 26,610 | LNFT | 4.41 | 117,350.10 | 6.63 | 176,424.30 | 6.50 | 172,965.00 | 4.10 | 109,101.00 |
| 0005 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (W/ 2-#2 & 1-#2 CU Bare Ground) | 4,700 | LNFT | 7.05 | 33,135.00 | 10.28 | 48,316.00 | 11.90 | 55,930.00 | 6.75 | 31,725.00 |
| 0006 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (W/ 2-#2 & 1-#2 CU Bare Ground) | 150 | LNFT | 29.00 | 4,350.00 | 16.53 | 2,479.50 | 21.70 | 3,255.00 | 36.00 | 5,400.00 |
| 0007 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (W/ 2-#6 & 1-#6 CU Bare Ground) | 1,695 | LNFT | 26.90 | 45,595.50 | 12.86 | 21,797.70 | 16.50 | 27,967.50 | 32.00 | 54,240.00 |
| 0008 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 2,450 | LNFT | 15.75 | 38,587.50 | 34.82 | 85,309.00 | 24.00 | 58,800.00 | 28.50 | 69,825.00 |
| 0009 | 730-05-11200 | Light Pole (40') (Steel) (Twin Arm) | 2 | EACH | 5,412.50 | 10,825.00 | 6,100.00 | 12,200.00 | 5,900.00 | 11,800.00 | 5,745.00 | 11,490.00 |
| 0010 | 730-07-08000 | Luminaire (1000Watt) (High PressureSodium) | 70 | EACH | 905.25 | 63,367.50 | 1,064.29 | 74,500.30 | 905.00 | 63,350.00 | 925.00 | 64,750.00 |
| 0011 | 730-10-00100 | Fabricated Light Pole Support | 2 | EACH | 260.00 | 520.00 | 2,245.00 | 4,490.00 | 2,500.00 | 5,000.00 | 750.00 | 1,500.00 |
| 0012 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 1,931.25 | 1,931.25 | 5,000.00 | 5,000.00 | 9,500.00 | 9,500.00 | 4,000.00 | 4,000.00 |
| 0013 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (40') | 2 | EACH | 652.50 | 1,305.00 | 745.00 | 1,490.00 | 300.00 | 600.00 | 635.00 | 1,270.00 |
| 0014 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 2 | EACH | 665.00 | 1,330.00 | 1,365.00 | 2,730.00 | 770.00 | 1,540.00 | 900.00 | 1,800.00 |
| 0015 | 730-16-00100 | Underground Junction Box (12" x 12") | 9 | EACH | 622.09 | 5,598.81 | 325.56 | 2,930.04 | 450.00 | 4,050.00 | 400.00 | 3,600.00 |
| 0016 | 730-19-00010 | Modular Breakaway Cable System | 2 | EACH | 2,284.00 | 4,568.00 | 1,865.00 | 3,730.00 | 2,000.00 | 4,000.00 | 2,100.00 | 4,200.00 |
| 0017 | 730-21-00020 | Duct Marker (Concrete) | 70 | EACH | 308.00 | 21,560.00 | 52.71 | 3,689.70 | 370.00 | 25,900.00 | 315.00 | 22,050.00 |
| 0018 | 730-22-00440 | Underground Marker Tape (6")(Non-Detectable) | 31,310 | LNFT | 0.20 | 6,262.00 | 0.22 | 6,888.20 | 0.20 | 6,262.00 | 0.95 | 29,744.50 |
| 0019 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 2,450 | LNFT | 7.46 | 18,277.00 | 12.57 | 30,796.50 | 2.50 | 6,125.00 | 18.50 | 45,325.00 |
| 0020 | NS-700-00700 | High Mast Luminaire Lowering Device Replacement | 11 | EACH | 15,251.25 | 167,763.75 | 12,363.64 | 136,000.04 | 11,750.00 | 129,250.00 | 13,350.00 | 146,850.00 |
| CONTRACTOR TOTAL | 673,801.24 | 706,605.28 | 712,697.50 | 761,538.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Ernest P. Breaux Electrical, Inc. |
- 6 - Diamond Electrical Co., Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 14,540.00 | 14,540.00 |
| 0002 | 727-01-00100 | Mobilization | 1 | LUMP | 35,000.00 | 35,000.00 | 34,777.00 | 34,777.00 |
| 0003 | 730-01-00100 | Trenching and Backfilling | 28,860 | LNFT | 5.30 | 152,958.00 | 2.69 | 77,633.40 |
| 0004 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (W/ 2-#6 & 1-#6 CU Bare Ground) | 26,610 | LNFT | 4.54 | 120,809.40 | 5.95 | 158,329.50 |
| 0005 | 730-02-01100 | Conduit with Conductors (PVC/HDPE) (2") (W/ 2-#2 & 1-#2 CU Bare Ground) | 4,700 | LNFT | 7.41 | 34,827.00 | 8.88 | 41,736.00 |
| 0006 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (W/ 2-#2 & 1-#2 CU Bare Ground) | 150 | LNFT | 20.39 | 3,058.50 | 40.47 | 6,070.50 |
| 0007 | 730-02-03100 | Conduit with Conductors (Rigid Galvanized Steel) (2") (W/ 2-#6 & 1-#6 CU Bare Ground) | 1,695 | LNFT | 13.29 | 22,526.55 | 22.60 | 38,307.00 |
| 0008 | 730-04-00200 | Jacked or Bored Casing (6" Diameter) (PVC/HDPE) | 2,450 | LNFT | 26.58 | 65,121.00 | 24.83 | 60,833.50 |
| 0009 | 730-05-11200 | Light Pole (40') (Steel) (Twin Arm) | 2 | EACH | 3,863.00 | 7,726.00 | 6,585.00 | 13,170.00 |
| 0010 | 730-07-08000 | Luminaire (1000Watt) (High PressureSodium) | 70 | EACH | 862.00 | 60,340.00 | 868.00 | 60,760.00 |
| 0011 | 730-10-00100 | Fabricated Light Pole Support | 2 | EACH | 3,154.00 | 6,308.00 | 3,035.00 | 6,070.00 |
| 0012 | 730-11-00100 | Removal and Disposal of Electrical Equipment | 1 | LUMP | 27,653.00 | 27,653.00 | 19,155.00 | 19,155.00 |
| 0013 | 730-12-00100 | Removal and Storage of Light Poles (Ground Mounted) (40') | 2 | EACH | 183.00 | 366.00 | 1,080.00 | 2,160.00 |
| 0014 | 730-13-00100 | Removal and Disposal of Light Pole Foundation | 2 | EACH | 728.00 | 1,456.00 | 2,022.00 | 4,044.00 |
| 0015 | 730-16-00100 | Underground Junction Box (12" x 12") | 9 | EACH | 708.00 | 6,372.00 | 545.00 | 4,905.00 |
| 0016 | 730-19-00010 | Modular Breakaway Cable System | 2 | EACH | 1,949.00 | 3,898.00 | 2,165.00 | 4,330.00 |
| 0017 | 730-21-00020 | Duct Marker (Concrete) | 70 | EACH | 213.00 | 14,910.00 | 180.00 | 12,600.00 |
| 0018 | 730-22-00440 | Underground Marker Tape (6")(Non-Detectable) | 31,310 | LNFT | 0.63 | 19,725.30 | 0.19 | 5,948.90 |
| 0019 | 736-03-00200 | Jacked or Bored Conduit (2" HPDE, Sch 80) | 2,450 | LNFT | 9.37 | 22,956.50 | 2.44 | 5,978.00 |
| 0020 | NS-700-00700 | High Mast Luminaire Lowering Device Replacement | 11 | EACH | 13,241.00 | 145,651.00 | 18,700.00 | 205,700.00 |
| CONTRACTOR TOTAL | 776,662.25 | 777,047.80 | ||||||