Bid Tabulations
Letting of
12/12/2012
LA DOTD Headquarters
| Lead Project: H.002760.6-R1 | |
| Parish: Iberia | |
| Routes: LA 668 and LA 671 | |
| Description: US 90 - JCT. LA 182 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK | |
| Estimated Construction Cost: $8,647,898.70 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $8,385,219.74 |
| 2 | 33663 | Glenn Lege Construction Inc | $8,857,276.06 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $9,031,115.94 |
| 4 | 39462 | Jb James Construction Llc | $9,072,568.69 |
| 5 | 55505 | Merrick, LLC | $9,084,139.23 |
| 34263 | La Contracting Enterprise LLC | IRREGULAR |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Glenn Lege Construction Inc |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 55,000.00 | 55,000.00 | 36,200.00 | 36,200.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 15,000.00 | 15,000.00 | 23,300.00 | 23,300.00 | 31,000.00 | 31,000.00 | 28,000.00 | 28,000.00 |
| 0003 | 202-02-00010 | Removal of Yard Drain | 8 | EACH | 400.00 | 3,200.00 | 320.00 | 2,560.00 | 300.00 | 2,400.00 | 220.00 | 1,760.00 |
| 0004 | 202-02-02000 | Removal of Asphalt Drives | 308.4 | SQYD | 13.50 | 4,163.40 | 12.00 | 3,700.80 | 8.60 | 2,652.24 | 8.00 | 2,467.20 |
| 0005 | 202-02-02020 | Removal of Asphalt Pavement | 253.6 | SQYD | 16.50 | 4,184.40 | 12.00 | 3,043.20 | 8.60 | 2,180.96 | 8.00 | 2,028.80 |
| 0006 | 202-02-06060 | Removal of Concrete Catch Basin | 23 | EACH | 200.00 | 4,600.00 | 520.00 | 11,960.00 | 200.00 | 4,600.00 | 200.00 | 4,600.00 |
| 0007 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 490 | LNFT | 12.00 | 5,880.00 | 5.50 | 2,695.00 | 5.00 | 2,450.00 | 6.00 | 2,940.00 |
| 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,524.3 | SQYD | 9.00 | 13,718.70 | 12.00 | 18,291.60 | 9.50 | 14,480.85 | 14.00 | 21,340.20 |
| 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) CDP | 617 | LNFT | 15.00 | 9,255.00 | 15.00 | 9,255.00 | 10.00 | 6,170.00 | 13.00 | 8,021.00 |
| 0010 | 202-02-32120 | Removal of Pipe (Side Drain) SD | 1,425 | LNFT | 15.00 | 21,375.00 | 9.00 | 12,825.00 | 9.00 | 12,825.00 | 14.00 | 19,950.00 |
| 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) SDP | 2,988 | LNFT | 15.00 | 44,820.00 | 9.00 | 26,892.00 | 9.00 | 26,892.00 | 16.00 | 47,808.00 |
| 0012 | 202-02-32160 | Removal of Pipe (Yard Drain) YD | 63 | LNFT | 15.00 | 945.00 | 250.00 | 15,750.00 | 20.00 | 1,260.00 | 16.00 | 1,008.00 |
| 0013 | 202-02-38500 | Removal of Surfacing and Stablized Base | 17,320.9 | SQYD | 5.50 | 95,264.95 | 8.50 | 147,227.65 | 8.50 | 147,227.65 | 3.50 | 60,623.15 |
| 0014 | 202-03-38000 | Relocation of Sign (Sta. 10+00 - Sta. 80+67) | 60 | EACH | 50.00 | 3,000.00 | 70.00 | 4,200.00 | 125.00 | 7,500.00 | 65.00 | 3,900.00 |
| 0015 | 203-01-00100 | General Excavation | 17,432 | CUYD | 10.00 | 174,320.00 | 8.50 | 148,172.00 | 13.50 | 235,332.00 | 18.00 | 313,776.00 |
| 0016 | 203-02-00100 | Drainage Excavation | 554 | CUYD | 16.00 | 8,864.00 | 15.60 | 8,642.40 | 20.00 | 11,080.00 | 18.00 | 9,972.00 |
| 0017 | 203-03-00100 | Embankment | 9,957 | CUYD | 10.00 | 99,570.00 | 19.50 | 194,161.50 | 16.35 | 162,796.95 | 41.00 | 408,237.00 |
| 0018 | 204-02-00100 | Temporary Hay or Straw Bales | 780 | EACH | 15.00 | 11,700.00 | 14.50 | 11,310.00 | 15.00 | 11,700.00 | 12.00 | 9,360.00 |
| 0019 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 17 | EACH | 250.00 | 4,250.00 | 175.00 | 2,975.00 | 175.00 | 2,975.00 | 135.00 | 2,295.00 |
| 0020 | 204-06-00100 | Temporary Silt Fencing | 5,200 | LNFT | 1.50 | 7,800.00 | 2.00 | 10,400.00 | 2.25 | 11,700.00 | 2.50 | 13,000.00 |
| 0021 | 302-02-01040 | Class II Base Course (4" Thick) (Stone) | 29,748 | SQYD | 12.00 | 356,976.00 | 14.00 | 416,472.00 | 15.55 | 462,581.40 | 11.00 | 327,228.00 |
| 0022 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 33,913.3 | SQYD | 15.00 | 508,699.50 | 12.00 | 406,959.60 | 16.05 | 544,308.47 | 8.00 | 271,306.40 |
| 0023 | 302-02-04100 | Class II Base Course (8 1/2" Thick) (Stone) | 744.9 | SQYD | 33.00 | 24,581.70 | 32.00 | 23,836.80 | 26.60 | 19,814.34 | 22.00 | 16,387.80 |
| 0024 | 302-02-05080 | Class II Base Course (10" Thick) (Asphaltic Concrete Base on Embankment Layer) | 93.7 | SQYD | 115.00 | 10,775.50 | 110.00 | 10,307.00 | 115.00 | 10,775.50 | 100.00 | 9,370.00 |
| 0025 | 304-05-00100 | Lime Treatment (Type E) | 533.48 | TON | 320.00 | 170,713.60 | 425.00 | 226,729.00 | 300.00 | 160,044.00 | 327.00 | 174,447.96 |
| 0026 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 188 | CUYD | 50.00 | 9,400.00 | 105.00 | 19,740.00 | 90.00 | 16,920.00 | 65.00 | 12,220.00 |
| 0027 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 300 | CUYD | 50.00 | 15,000.00 | 105.00 | 31,500.00 | 90.00 | 27,000.00 | 28.00 | 8,400.00 |
| 0028 | 502-01-00100 | Superpave Asphaltic Concrete | 6,841.3 | TON | 98.00 | 670,447.40 | 90.00 | 615,717.00 | 95.50 | 653,344.15 | 101.50 | 694,391.95 |
| 0029 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 806.6 | TON | 150.00 | 120,990.00 | 120.00 | 96,792.00 | 127.25 | 102,639.85 | 130.00 | 104,858.00 |
| 0030 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 744.9 | SQYD | 95.00 | 70,765.50 | 90.00 | 67,041.00 | 92.50 | 68,903.25 | 85.00 | 63,316.50 |
| 0031 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 969 | LNFT | 3.30 | 3,197.70 | 3.75 | 3,633.75 | 3.45 | 3,343.05 | 2.00 | 1,938.00 |
| 0032 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,927 | LNFT | 3.00 | 5,781.00 | 3.75 | 7,226.25 | 3.45 | 6,648.15 | 2.00 | 3,854.00 |
| 0033 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 5,979 | LNFT | 55.00 | 328,845.00 | 62.00 | 370,698.00 | 74.50 | 445,435.50 | 62.00 | 370,698.00 |
| 0034 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 656 | LNFT | 65.00 | 42,640.00 | 84.00 | 55,104.00 | 97.00 | 63,632.00 | 80.00 | 52,480.00 |
| 0035 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 713 | LNFT | 75.00 | 53,475.00 | 87.00 | 62,031.00 | 121.00 | 86,273.00 | 74.00 | 52,762.00 |
| 0036 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,313 | LNFT | 100.00 | 131,300.00 | 129.00 | 169,377.00 | 165.00 | 216,645.00 | 106.00 | 139,178.00 |
| 0037 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 2,407 | LNFT | 105.00 | 252,735.00 | 128.00 | 308,096.00 | 181.00 | 435,667.00 | 130.00 | 312,910.00 |
| 0038 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 4,911 | LNFT | 130.00 | 638,430.00 | 129.00 | 633,519.00 | 200.00 | 982,200.00 | 133.00 | 653,163.00 |
| 0039 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 3,654 | LNFT | 180.00 | 657,720.00 | 180.00 | 657,720.00 | 181.50 | 663,201.00 | 172.00 | 628,488.00 |
| 0040 | 701-03-01140 | Storm Drain Pipe (60" RCP) | 888 | LNFT | 215.00 | 190,920.00 | 210.00 | 186,480.00 | 210.00 | 186,480.00 | 230.00 | 204,240.00 |
| 0041 | 701-15-00100 | Concrete Collar | 1 | EACH | 1,100.00 | 1,100.00 | 2,800.00 | 2,800.00 | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 |
| 0042 | 702-03-00100 | Catch Basins (CB-01) | 149 | EACH | 2,400.00 | 357,600.00 | 2,225.00 | 331,525.00 | 2,275.00 | 338,975.00 | 2,500.00 | 372,500.00 |
| 0043 | 702-03-00200 | Catch Basins (CB-02) | 11 | EACH | 4,300.00 | 47,300.00 | 4,450.00 | 48,950.00 | 5,300.00 | 58,300.00 | 4,400.00 | 48,400.00 |
| 0044 | 702-03-00500 | Catch Basins (CB-06) | 45 | EACH | 4,800.00 | 216,000.00 | 3,670.00 | 165,150.00 | 4,200.00 | 189,000.00 | 3,500.00 | 157,500.00 |
| 0045 | 702-03-00600 | Catch Basins (CB-07) | 18 | EACH | 6,300.00 | 113,400.00 | 4,450.00 | 80,100.00 | 4,700.00 | 84,600.00 | 3,700.00 | 66,600.00 |
| 0046 | 702-03-00700 | Catch Basins (CB-08) | 25 | EACH | 8,800.00 | 220,000.00 | 8,675.00 | 216,875.00 | 7,600.00 | 190,000.00 | 6,200.00 | 155,000.00 |
| 0047 | 702-03-00800 | Catch Basins (CB-09) | 10 | EACH | 5,200.00 | 52,000.00 | 4,225.00 | 42,250.00 | 5,000.00 | 50,000.00 | 3,900.00 | 39,000.00 |
| 0048 | 702-04-00100 | Adjusting Manholes | 9 | EACH | 1,200.00 | 10,800.00 | 1,025.00 | 9,225.00 | 500.00 | 4,500.00 | 2,000.00 | 18,000.00 |
| 0049 | 706-01-00100 | Concrete Walk (4" Thick) | 5,052.2 | SQYD | 34.50 | 174,300.90 | 40.00 | 202,088.00 | 47.75 | 241,242.55 | 40.00 | 202,088.00 |
| 0050 | 706-02-00200 | Concrete Drive (6" Thick) | 2,427.8 | SQYD | 60.00 | 145,668.00 | 57.00 | 138,384.60 | 65.00 | 157,807.00 | 65.00 | 157,807.00 |
| 0051 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 76 | SQYD | 90.00 | 6,840.00 | 52.00 | 3,952.00 | 125.00 | 9,500.00 | 100.00 | 7,600.00 |
| 0052 | 706-04-00100 | Handicapped Curb Ramps | 18 | EACH | 1,250.00 | 22,500.00 | 3,700.00 | 66,600.00 | 1,450.00 | 26,100.00 | 1,600.00 | 28,800.00 |
| 0053 | 707-01-00100 | Concrete Curb | 444 | LNFT | 24.00 | 10,656.00 | 8.30 | 3,685.20 | 14.50 | 6,438.00 | 17.00 | 7,548.00 |
| 0054 | 707-03-00100 | Combination Concrete Curb and Gutter | 14,128.8 | LNFT | 22.40 | 316,485.12 | 17.75 | 250,786.20 | 17.55 | 247,960.44 | 20.00 | 282,576.00 |
| 0055 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 70,000.00 | 70,000.00 | 45,250.00 | 45,250.00 | 35,000.00 | 35,000.00 | 300,000.00 | 300,000.00 |
| 0056 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,950 | LNFT | 0.30 | 885.00 | 0.25 | 737.50 | 0.25 | 737.50 | 0.25 | 737.50 |
| 0057 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 704 | LNFT | 0.90 | 633.60 | 0.85 | 598.40 | 0.80 | 563.20 | 0.75 | 528.00 |
| 0058 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.67 | MILE | 500.00 | 1,335.00 | 700.00 | 1,869.00 | 1,200.00 | 3,204.00 | 200.00 | 534.00 |
| 0059 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.878 | MILE | 230.00 | 1,121.94 | 225.00 | 1,097.55 | 215.00 | 1,048.77 | 300.00 | 1,463.40 |
| 0060 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.006 | MILE | 280.00 | 3,921.68 | 280.00 | 3,921.68 | 270.00 | 3,781.62 | 300.00 | 4,201.80 |
| 0061 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 88 | EACH | 30.00 | 2,640.00 | 28.00 | 2,464.00 | 26.50 | 2,332.00 | 20.00 | 1,760.00 |
| 0062 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 32 | EACH | 30.00 | 960.00 | 28.00 | 896.00 | 26.50 | 848.00 | 50.00 | 1,600.00 |
| 0063 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 100.00 | 400.00 | 90.00 | 360.00 | 85.00 | 340.00 | 70.00 | 280.00 |
| 0064 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,444 | EACH | 4.50 | 6,498.00 | 4.50 | 6,498.00 | 5.00 | 7,220.00 | 4.00 | 5,776.00 |
| 0065 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 7,000.00 | 7,000.00 | 26,000.00 | 26,000.00 | 50,000.00 | 50,000.00 | 40,000.00 | 40,000.00 |
| 0066 | 726-01-00100 | Bedding Material | 5,100 | CUYD | 88.00 | 448,800.00 | 100.00 | 510,000.00 | 92.00 | 469,200.00 | 60.00 | 306,000.00 |
| 0067 | 727-01-00100 | Mobilization | 1 | LUMP | 800,000.00 | 800,000.00 | 400,000.00 | 400,000.00 | 265,000.00 | 265,000.00 | 900,000.00 | 900,000.00 |
| 0068 | 729-21-00100 | U-Channel Post | 30 | EACH | 100.00 | 3,000.00 | 170.00 | 5,100.00 | 150.00 | 4,500.00 | 150.00 | 4,500.00 |
| 0069 | 731-02-00100 | Reflectorized Raised Pavement Markers | 722 | EACH | 4.80 | 3,465.60 | 5.00 | 3,610.00 | 5.00 | 3,610.00 | 5.00 | 3,610.00 |
| 0070 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,475 | LNFT | 1.30 | 1,917.50 | 1.30 | 1,917.50 | 1.25 | 1,843.75 | 1.50 | 2,212.50 |
| 0071 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 155 | LNFT | 5.10 | 790.50 | 5.00 | 775.00 | 4.75 | 736.25 | 5.00 | 775.00 |
| 0072 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 5.70 | 136.80 | 5.60 | 134.40 | 5.50 | 132.00 | 5.00 | 120.00 |
| 0073 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.003 | MILE | 2,600.00 | 18,207.80 | 2,560.00 | 17,927.68 | 2,500.00 | 17,507.50 | 2,600.00 | 18,207.80 |
| 0074 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.439 | MILE | 850.00 | 2,073.15 | 850.00 | 2,073.15 | 800.00 | 1,951.20 | 675.00 | 1,646.33 |
| 0075 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 44 | EACH | 210.00 | 9,240.00 | 210.00 | 9,240.00 | 200.00 | 8,800.00 | 220.00 | 9,680.00 |
| 0076 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 16 | EACH | 210.00 | 3,360.00 | 210.00 | 3,360.00 | 200.00 | 3,200.00 | 300.00 | 4,800.00 |
| 0077 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 450.00 | 900.00 | 450.00 | 900.00 | 425.00 | 850.00 | 400.00 | 800.00 |
| 0078 | 732-05-00100 | Removal of Existing Markings | 0.18 | MILE | 5,700.00 | 1,026.00 | 5,560.00 | 1,000.80 | 5,500.00 | 990.00 | 7,000.00 | 1,260.00 |
| 0079 | 735-01-00100 | Mailboxes | 19 | EACH | 13.00 | 247.00 | 28.00 | 532.00 | 11.00 | 209.00 | 25.00 | 475.00 |
| 0080 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 125.00 | 2,375.00 | 200.00 | 3,800.00 | 165.00 | 3,135.00 | 175.00 | 3,325.00 |
| 0081 | 740-01-00100 | Construction Layout | 1 | LUMP | 35,000.00 | 35,000.00 | 200,000.00 | 200,000.00 | 117,000.00 | 117,000.00 | 300,000.00 | 300,000.00 |
| 0082 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 10,000.00 | 10,000.00 | 41,000.00 | 41,000.00 | 50,000.00 | 50,000.00 | 5,000.00 | 5,000.00 |
| 0083 | 741-09-00100 | Adjusting Water House Connections | 40 | EACH | 510.00 | 20,400.00 | 2,525.00 | 101,000.00 | 430.00 | 17,200.00 | 350.00 | 14,000.00 |
| 0084 | 741-10-00100 | Adjusting Water Service Lines | 2,000 | LNFT | 7.50 | 15,000.00 | 20.50 | 41,000.00 | 8.00 | 16,000.00 | 15.00 | 30,000.00 |
| 0085 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 100 | EACH | 650.00 | 65,000.00 | 2,050.00 | 205,000.00 | 850.00 | 85,000.00 | 300.00 | 30,000.00 |
| 0086 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 5,000 | LNFT | 13.50 | 67,500.00 | 50.00 | 250,000.00 | 18.50 | 92,500.00 | 17.00 | 85,000.00 |
| 0087 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,124 | INLF | 2.20 | 2,472.80 | 1.40 | 1,573.60 | 1.05 | 1,180.20 | 0.60 | 674.40 |
| 0088 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,959 | INLF | 1.00 | 2,959.00 | 1.75 | 5,178.25 | 1.35 | 3,994.65 | 1.00 | 2,959.00 |
| 0089 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 20,000.00 | 40,000.00 | 17,100.00 | 34,200.00 | 17,250.00 | 34,500.00 | 16,000.00 | 32,000.00 |
| 0090 | NS-MSC-00120 | Drainage Structure MH - 14 X Open | 2 | EACH | 13,000.00 | 26,000.00 | 12,800.00 | 25,600.00 | 9,000.00 | 18,000.00 | 15,000.00 | 30,000.00 |
| 0091 | 702-02-00100 | Manholes (MH-06) | 50 | EACH | 3,300.00 | 165,000.00 | 5,555.00 | 277,750.00 | 4,500.00 | 225,000.00 | 5,400.00 | 270,000.00 |
| CONTRACTOR TOTAL | 8,385,219.74 | 8,857,276.06 | 9,031,115.94 | 9,072,568.69 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Merrick, LLC |
La Contracting Enterprise LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 40,000.00 | 40,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 55,000.00 | 55,000.00 | 80,000.00 | 80,000.00 |
| 0003 | 202-02-00010 | Removal of Yard Drain | 8 | EACH | 50.00 | 400.00 | 220.00 | 1,760.00 |
| 0004 | 202-02-02000 | Removal of Asphalt Drives | 308.4 | SQYD | 5.00 | 1,542.00 | 6.00 | 1,850.40 |
| 0005 | 202-02-02020 | Removal of Asphalt Pavement | 253.6 | SQYD | 5.00 | 1,268.00 | 8.00 | 2,028.80 |
| 0006 | 202-02-06060 | Removal of Concrete Catch Basin | 23 | EACH | 100.00 | 2,300.00 | 300.00 | 6,900.00 |
| 0007 | 202-02-06080 | Removal of Concrete Combination Curb and Gutter | 490 | LNFT | 3.50 | 1,715.00 | 6.00 | 2,940.00 |
| 0008 | 202-02-06100 | Removal of Concrete Walks and Drives | 1,524.3 | SQYD | 3.75 | 5,716.13 | 7.00 | 10,670.10 |
| 0009 | 202-02-32100 | Removal of Pipe (Cross Drain) CDP | 617 | LNFT | 25.00 | 15,425.00 | 8.00 | 4,936.00 |
| 0010 | 202-02-32120 | Removal of Pipe (Side Drain) SD | 1,425 | LNFT | 7.00 | 9,975.00 | 7.00 | 9,975.00 |
| 0011 | 202-02-32140 | Removal of Pipe (Storm Drain) SDP | 2,988 | LNFT | 7.00 | 20,916.00 | 9.00 | 26,892.00 |
| 0012 | 202-02-32160 | Removal of Pipe (Yard Drain) YD | 63 | LNFT | 190.00 | 11,970.00 | 8.00 | 504.00 |
| 0013 | 202-02-38500 | Removal of Surfacing and Stablized Base | 17,320.9 | SQYD | 5.00 | 86,604.50 | 5.50 | 95,264.95 |
| 0014 | 202-03-38000 | Relocation of Sign (Sta. 10+00 - Sta. 80+67) | 60 | EACH | 80.00 | 4,800.00 | 60.00 | 3,600.00 |
| 0015 | 203-01-00100 | General Excavation | 17,432 | CUYD | 4.00 | 69,728.00 | 6.00 | 104,592.00 |
| 0016 | 203-02-00100 | Drainage Excavation | 554 | CUYD | 5.00 | 2,770.00 | 6.50 | 3,601.00 |
| 0017 | 203-03-00100 | Embankment | 9,957 | CUYD | 13.00 | 129,441.00 | 10.00 | 99,570.00 |
| 0018 | 204-02-00100 | Temporary Hay or Straw Bales | 780 | EACH | 10.00 | 7,800.00 | 14.00 | 10,920.00 |
| 0019 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 17 | EACH | 150.00 | 2,550.00 | 175.00 | 2,975.00 |
| 0020 | 204-06-00100 | Temporary Silt Fencing | 5,200 | LNFT | 2.00 | 10,400.00 | 2.00 | 10,400.00 |
| 0021 | 302-02-01040 | Class II Base Course (4" Thick) (Stone) | 29,748 | SQYD | 14.00 | 416,472.00 | 10.00 | 297,480.00 |
| 0022 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 33,913.3 | SQYD | 16.00 | 542,612.80 | 8.00 | 271,306.40 |
| 0023 | 302-02-04100 | Class II Base Course (8 1/2" Thick) (Stone) | 744.9 | SQYD | 22.00 | 16,387.80 | 28.00 | 20,857.20 |
| 0024 | 302-02-05080 | Class II Base Course (10" Thick) (Asphaltic Concrete Base on Embankment Layer) | 93.7 | SQYD | 110.00 | 10,307.00 | 145.00 | 13,586.50 |
| 0025 | 304-05-00100 | Lime Treatment (Type E) | 533.48 | TON | 275.00 | 146,707.00 | 280.00 | 149,374.40 |
| 0026 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 188 | CUYD | 90.00 | 16,920.00 | 90.00 | 16,920.00 |
| 0027 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 300 | CUYD | 60.00 | 18,000.00 | 86.00 | 25,800.00 |
| 0028 | 502-01-00100 | Superpave Asphaltic Concrete | 6,841.3 | TON | 96.00 | 656,764.80 | 105.00 | 718,336.50 |
| 0029 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 806.6 | TON | 130.00 | 104,858.00 | 140.00 | 112,924.00 |
| 0030 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 744.9 | SQYD | 65.00 | 48,418.50 | 78.00 | 58,102.20 |
| 0031 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 969 | LNFT | 3.50 | 3,391.50 | 2.35 | 2,277.15 |
| 0032 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 1,927 | LNFT | 3.50 | 6,744.50 | 2.35 | 4,528.45 |
| 0033 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 5,979 | LNFT | 56.00 | 334,824.00 | 36.00 | 215,244.00 |
| 0034 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 656 | LNFT | 80.00 | 52,480.00 | 42.00 | 27,552.00 |
| 0035 | 701-03-01040 | Storm Drain Pipe (24" RCP/PP) | 713 | LNFT | 81.00 | 57,753.00 | 58.00 | 41,354.00 |
| 0036 | 701-03-01060 | Storm Drain Pipe (30" RCP/PP) | 1,313 | LNFT | 117.00 | 153,621.00 | 66.00 | 86,658.00 |
| 0037 | 701-03-01080 | Storm Drain Pipe (36" RCP/PP) | 2,407 | LNFT | 120.00 | 288,840.00 | 85.00 | 204,595.00 |
| 0038 | 701-03-01090 | Storm Drain Pipe (42" RCP/PP) | 4,911 | LNFT | 116.00 | 569,676.00 | 109.00 | 535,299.00 |
| 0039 | 701-03-01100 | Storm Drain Pipe (48" RCP/PP) | 3,654 | LNFT | 162.00 | 591,948.00 | 131.00 | 478,674.00 |
| 0040 | 701-03-01140 | Storm Drain Pipe (60" RCP) | 888 | LNFT | 190.00 | 168,720.00 | 200.00 | 177,600.00 |
| 0041 | 701-15-00100 | Concrete Collar | 1 | EACH | 4,500.00 | 4,500.00 | 1,500.00 | 1,500.00 |
| 0042 | 702-03-00100 | Catch Basins (CB-01) | 149 | EACH | 2,250.00 | 335,250.00 | 2,200.00 | 327,800.00 |
| 0043 | 702-03-00200 | Catch Basins (CB-02) | 11 | EACH | 4,500.00 | 49,500.00 | 3,250.00 | 35,750.00 |
| 0044 | 702-03-00500 | Catch Basins (CB-06) | 45 | EACH | 3,750.00 | 168,750.00 | 3,350.00 | 150,750.00 |
| 0045 | 702-03-00600 | Catch Basins (CB-07) | 18 | EACH | 4,500.00 | 81,000.00 | 4,300.00 | 77,400.00 |
| 0046 | 702-03-00700 | Catch Basins (CB-08) | 25 | EACH | 8,250.00 | 206,250.00 | 7,300.00 | 182,500.00 |
| 0047 | 702-03-00800 | Catch Basins (CB-09) | 10 | EACH | 4,000.00 | 40,000.00 | 3,500.00 | 35,000.00 |
| 0048 | 702-04-00100 | Adjusting Manholes | 9 | EACH | 500.00 | 4,500.00 | 400.00 | 3,600.00 |
| 0049 | 706-01-00100 | Concrete Walk (4" Thick) | 5,052.2 | SQYD | 40.00 | 202,088.00 | 42.00 | 212,192.40 |
| 0050 | 706-02-00200 | Concrete Drive (6" Thick) | 2,427.8 | SQYD | 55.00 | 133,529.00 | 52.00 | 126,245.60 |
| 0051 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 76 | SQYD | 100.00 | 7,600.00 | 52.00 | 3,952.00 |
| 0052 | 706-04-00100 | Handicapped Curb Ramps | 18 | EACH | 1,500.00 | 27,000.00 | 425.00 | 7,650.00 |
| 0053 | 707-01-00100 | Concrete Curb | 444 | LNFT | 10.00 | 4,440.00 | 6.50 | 2,886.00 |
| 0054 | 707-03-00100 | Combination Concrete Curb and Gutter | 14,128.8 | LNFT | 13.50 | 190,738.80 | 20.00 | 282,576.00 |
| 0055 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 382,400.00 | 382,400.00 | 60,000.00 | 60,000.00 |
| 0056 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 2,950 | LNFT | 0.50 | 1,475.00 | 0.25 | 737.50 |
| 0057 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 704 | LNFT | 0.75 | 528.00 | 0.70 | 492.80 |
| 0058 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 2.67 | MILE | 210.00 | 560.70 | 350.00 | 934.50 |
| 0059 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.878 | MILE | 210.00 | 1,024.38 | 230.00 | 1,121.94 |
| 0060 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.006 | MILE | 420.00 | 5,882.52 | 465.00 | 6,512.79 |
| 0061 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 88 | EACH | 25.00 | 2,200.00 | 29.00 | 2,552.00 |
| 0062 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 32 | EACH | 25.00 | 800.00 | 29.00 | 928.00 |
| 0063 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 110.00 | 440.00 | 116.00 | 464.00 |
| 0064 | 713-06-00100 | Temporary Reflectorized Raised Pavement Markers | 1,444 | EACH | 4.50 | 6,498.00 | 0.40 | 577.60 |
| 0065 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 55,000.00 | 55,000.00 | 8,000.00 | 8,000.00 |
| 0066 | 726-01-00100 | Bedding Material | 5,100 | CUYD | 90.00 | 459,000.00 | 90.00 | 459,000.00 |
| 0067 | 727-01-00100 | Mobilization | 1 | LUMP | 900,000.00 | 900,000.00 | 500,000.00 | 500,000.00 |
| 0068 | 729-21-00100 | U-Channel Post | 30 | EACH | 60.00 | 1,800.00 | 105.00 | 3,150.00 |
| 0069 | 731-02-00100 | Reflectorized Raised Pavement Markers | 722 | EACH | 5.00 | 3,610.00 | 4.70 | 3,393.40 |
| 0070 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,475 | LNFT | 1.50 | 2,212.50 | 1.20 | 1,770.00 |
| 0071 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 155 | LNFT | 3.50 | 542.50 | 3.50 | 542.50 |
| 0072 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 24 | LNFT | 4.00 | 96.00 | 4.00 | 96.00 |
| 0073 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.003 | MILE | 3,100.00 | 21,709.30 | 2,450.00 | 17,157.35 |
| 0074 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.439 | MILE | 600.00 | 1,463.40 | 700.00 | 1,707.30 |
| 0075 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 44 | EACH | 150.00 | 6,600.00 | 175.00 | 7,700.00 |
| 0076 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 16 | EACH | 150.00 | 2,400.00 | 175.00 | 2,800.00 |
| 0077 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 375.00 | 750.00 | 435.00 | 870.00 |
| 0078 | 732-05-00100 | Removal of Existing Markings | 0.18 | MILE | 20,000.00 | 3,600.00 | 2,300.00 | 414.00 |
| 0079 | 735-01-00100 | Mailboxes | 19 | EACH | 15.00 | 285.00 | 1.20 | 22.80 |
| 0080 | 735-02-00100 | Mailbox Supports (Single) | 19 | EACH | 150.00 | 2,850.00 | 160.00 | 3,040.00 |
| 0081 | 740-01-00100 | Construction Layout | 1 | LUMP | 400,000.00 | 400,000.00 | 100,000.00 | 100,000.00 |
| 0082 | 740-02-00100 | Utility Oversight and Coordination | 1 | LUMP | 250,000.00 | 250,000.00 | 40,000.00 | 40,000.00 |
| 0083 | 741-09-00100 | Adjusting Water House Connections | 40 | EACH | 140.00 | 5,600.00 | 320.00 | 12,800.00 |
| 0084 | 741-10-00100 | Adjusting Water Service Lines | 2,000 | LNFT | 3.00 | 6,000.00 | 6.50 | 13,000.00 |
| 0085 | 742-02-00100 | Adjusting Sanitary Sewer House Connections | 100 | EACH | 130.00 | 13,000.00 | 370.00 | 37,000.00 |
| 0086 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 5,000 | LNFT | 2.00 | 10,000.00 | 13.50 | 67,500.00 |
| 0087 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,124 | INLF | 1.20 | 1,348.80 | 0.75 | 843.00 |
| 0088 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,959 | INLF | 1.20 | 3,550.80 | 1.05 | 3,106.95 |
| 0089 | NS-713-00001 | Dynamic Message Sign Unit | 2 | EACH | 35,000.00 | 70,000.00 | 18,500.00 | 37,000.00 |
| 0090 | NS-MSC-00120 | Drainage Structure MH - 14 X Open | 2 | EACH | 30,000.00 | 60,000.00 | 8,300.00 | 16,600.00 |
| 0091 | 702-02-00100 | Manholes (MH-06) | 50 | EACH | 4,000.00 | 200,000.00 | 3,100.00 | 155,000.00 |
| CONTRACTOR TOTAL | 9,084,139.23 | IRREGULAR | ||||||