Bid Tabulations
Letting of
12/14/2011
LA DOTD Headquarters
| Lead Project: H.002756.6 | |
| Parish: Iberia | |
| Routes: LA 88/89 | |
| Description: LA 88/LA 89: VERMILION P/L - LA 182 | |
| Type Const: GRADING, CLASS II BASE COURSE, IN-PLACE CEMENT STABILIZED BASE COURSE, SUBGRADE LAYER, SUPERPAVE ASPHALTIC CONCRETE, COLD PLANING ASPHALTIC PAVEMENT, DRAINAGE STRUCTURES, AND RELATED WORK. | |
| Estimated Construction Cost: $6,418,342.45 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $6,045,595.30 |
| 2 | 33663 | Glenn Lege Construction Inc | $6,177,944.44 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $6,572,835.90 |
| 4 | 12487 | Diamond B Construction Co., L.L.C. | $7,678,007.25 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - Glenn Lege Construction Inc |
- 3 - Gilchrist Construction Co. LLC |
- 4 - Diamond B Construction Co., L.L.C. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 823 | SQYD | 10.00 | 8,230.00 | 6.57 | 5,407.11 | 14.00 | 11,522.00 | 15.00 | 12,345.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 503 | LNFT | 10.00 | 5,030.00 | 12.46 | 6,267.38 | 9.00 | 4,527.00 | 15.00 | 7,545.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (72" EQUIV. CMPA) | 36 | LNFT | 20.00 | 720.00 | 85.00 | 3,060.00 | 50.00 | 1,800.00 | 55.00 | 1,980.00 |
| 0004 | 202-02-32100 | Removal of Pipe (Cross Drain) (48" CMP) | 40 | LNFT | 20.00 | 800.00 | 50.00 | 2,000.00 | 50.00 | 2,000.00 | 55.00 | 2,200.00 |
| 0005 | 202-02-32100 | Removal of Pipe (Cross Drain) 96" EQUIV. CMPA) | 36 | LNFT | 20.00 | 720.00 | 95.00 | 3,420.00 | 50.00 | 1,800.00 | 85.00 | 3,060.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,288.9 | SQYD | 5.75 | 7,411.18 | 5.50 | 7,088.95 | 8.00 | 10,311.20 | 21.50 | 27,711.35 |
| 0007 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,100 | CUYD | 3.00 | 12,300.00 | 14.50 | 59,450.00 | 18.00 | 73,800.00 | 14.00 | 57,400.00 |
| 0008 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,010 | CUYD | 15.00 | 15,150.00 | 14.50 | 14,645.00 | 16.00 | 16,160.00 | 14.00 | 14,140.00 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 100 | EACH | 110.00 | 11,000.00 | 140.00 | 14,000.00 | 250.00 | 25,000.00 | 300.00 | 30,000.00 |
| 0010 | 302-02-05100 | Class II Base Course (10" Thick) (Stone) | 1,288.9 | SQYD | 25.00 | 32,222.50 | 29.00 | 37,378.10 | 33.00 | 42,533.70 | 35.00 | 45,111.50 |
| 0011 | 303-01-00200 | In-Place Cement Stabilized Base Course (8 1/2" Thick) | 129,003 | SQYD | 6.25 | 806,268.75 | 5.32 | 686,295.96 | 4.85 | 625,664.55 | 9.00 | 1,161,027.00 |
| 0012 | 305-01-03020 | Subgrade Layer (10" Thick) (Treated) | 65,231 | SQYD | 9.50 | 619,694.50 | 9.50 | 619,694.50 | 8.80 | 574,032.80 | 10.00 | 652,310.00 |
| 0013 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 260 | CUYD | 25.00 | 6,500.00 | 35.00 | 9,100.00 | 55.00 | 14,300.00 | 55.00 | 14,300.00 |
| 0014 | 502-01-00100 | Superpave Asphaltic Concrete | 37,319 | TON | 75.50 | 2,817,584.50 | 74.50 | 2,780,265.50 | 88.00 | 3,284,072.00 | 86.00 | 3,209,434.00 |
| 0015 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 2,476.6 | TON | 1.00 | 2,476.60 | 110.00 | 272,426.00 | 120.00 | 297,192.00 | 200.00 | 495,320.00 |
| 0016 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 102,031 | GAL | 3.55 | 362,210.05 | 3.93 | 400,981.83 | 3.75 | 382,616.25 | 4.00 | 408,124.00 |
| 0017 | 507-02-00200 | Aggregate (S2) | 150,046 | SQYD | 1.00 | 150,046.00 | 1.07 | 160,549.22 | 1.05 | 157,548.30 | 1.00 | 150,046.00 |
| 0018 | 507-02-00300 | Aggregate (S3) | 150,046 | SQYD | 0.75 | 112,534.50 | 0.81 | 121,537.26 | 0.78 | 117,035.88 | 0.80 | 120,036.80 |
| 0019 | 509-01-00100 | Cold Planing Asphaltic Pavement | 132,416 | SQYD | 1.15 | 152,278.40 | 1.75 | 231,728.00 | 0.60 | 79,449.60 | 2.50 | 331,040.00 |
| 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -8,732 | CUYD | 0.01 | -87.32 | 1.00 | -8,732.00 | 1.00 | -8,732.00 | 15.00 | -130,980.00 |
| 0021 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 115 | SQYD | 90.00 | 10,350.00 | 92.00 | 10,580.00 | 130.00 | 14,950.00 | 150.00 | 17,250.00 |
| 0022 | 701-01-02160 | Cross Drain Pipe (48" RCP/PP or 54" CMP) | 40 | LNFT | 350.00 | 14,000.00 | 200.00 | 8,000.00 | 265.00 | 10,600.00 | 525.00 | 21,000.00 |
| 0023 | 701-02-02220 | Cross Drain Pipe Arch (60" Equiv. RCPA or 72" Equiv. CMPA) | 36 | LNFT | 425.00 | 15,300.00 | 310.00 | 11,160.00 | 360.00 | 12,960.00 | 800.00 | 28,800.00 |
| 0024 | 701-02-02260 | Cross Drain Pipe Arch (84" Equiv. RCPA or 96" Equiv. CMPA) | 36 | LNFT | 700.00 | 25,200.00 | 725.00 | 26,100.00 | 615.00 | 22,140.00 | 950.00 | 34,200.00 |
| 0025 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 36 | LNFT | 50.00 | 1,800.00 | 44.00 | 1,584.00 | 75.00 | 2,700.00 | 75.00 | 2,700.00 |
| 0026 | 701-05-02080 | Side Drain Pipe (Erosion) (30" PP/CMP) | 100 | LNFT | 75.00 | 7,500.00 | 84.50 | 8,450.00 | 80.00 | 8,000.00 | 80.00 | 8,000.00 |
| 0027 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 4 | LNFT | 55.00 | 220.00 | 145.00 | 580.00 | 220.00 | 880.00 | 500.00 | 2,000.00 |
| 0028 | 701-10-01140 | Reinforced Concrete Pipe (Extension) (48") | 8 | LNFT | 175.00 | 1,400.00 | 220.00 | 1,760.00 | 230.00 | 1,840.00 | 500.00 | 4,000.00 |
| 0029 | 701-12-01080 | Corrugated Metal Pipe (Extension) (30") | 4 | LNFT | 89.00 | 356.00 | 180.00 | 720.00 | 150.00 | 600.00 | 500.00 | 2,000.00 |
| 0030 | 701-15-00100 | Concrete Collar | 3 | EACH | 625.00 | 1,875.00 | 850.00 | 2,550.00 | 980.00 | 2,940.00 | 1,500.00 | 4,500.00 |
| 0031 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,000.00 | 3,000.00 | 2,200.00 | 2,200.00 | 4,000.00 | 4,000.00 | 5,000.00 | 5,000.00 |
| 0032 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 212.5 | LNFT | 57.00 | 12,112.50 | 72.00 | 15,300.00 | 60.00 | 12,750.00 | 62.00 | 13,175.00 |
| 0033 | 704-03-00100 | Blocked Out Guard Rail | 12.3 | LNFT | 25.00 | 307.50 | 32.00 | 393.60 | 25.00 | 307.50 | 29.00 | 356.70 |
| 0034 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 25 | LNFT | 50.00 | 1,250.00 | 66.00 | 1,650.00 | 55.00 | 1,375.00 | 60.00 | 1,500.00 |
| 0035 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,000.00 | 8,000.00 | 2,525.00 | 10,100.00 | 2,200.00 | 8,800.00 | 2,100.00 | 8,400.00 |
| 0036 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 4 | EACH | 2,300.00 | 9,200.00 | 2,900.00 | 11,600.00 | 2,400.00 | 9,600.00 | 2,500.00 | 10,000.00 |
| 0037 | 706-02-00200 | Concrete Drive (6" Thick) | 100 | SQYD | 70.00 | 7,000.00 | 50.00 | 5,000.00 | 98.00 | 9,800.00 | 70.00 | 7,000.00 |
| 0038 | 711-02-00500 | Riprap (130 lb) | 20 | CUYD | 150.00 | 3,000.00 | 175.00 | 3,500.00 | 120.00 | 2,400.00 | 350.00 | 7,000.00 |
| 0039 | 712-02-00100 | Sacked Concrete Revetment | 150 | SQYD | 75.00 | 11,250.00 | 235.00 | 35,250.00 | 75.00 | 11,250.00 | 130.00 | 19,500.00 |
| 0040 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 198,000.00 | 198,000.00 | 100,000.00 | 100,000.00 | 30,000.00 | 30,000.00 |
| 0041 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 604 | LNFT | 0.25 | 151.00 | 0.25 | 151.00 | 0.55 | 332.20 | 0.25 | 151.00 |
| 0042 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 96 | LNFT | 0.30 | 28.80 | 0.35 | 33.60 | 0.80 | 76.80 | 0.35 | 33.60 |
| 0043 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 3,934 | LNFT | 0.75 | 2,950.50 | 0.85 | 3,343.90 | 0.55 | 2,163.70 | 0.80 | 3,147.20 |
| 0044 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 18.771 | MILE | 160.00 | 3,003.36 | 650.00 | 12,201.15 | 350.00 | 6,569.85 | 165.00 | 3,097.22 |
| 0045 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 14.142 | MILE | 200.00 | 2,828.40 | 225.00 | 3,181.95 | 220.00 | 3,111.24 | 225.00 | 3,181.95 |
| 0046 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 54.081 | MILE | 250.00 | 13,520.25 | 280.00 | 15,142.68 | 385.00 | 20,821.19 | 275.00 | 14,872.28 |
| 0047 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 6 | EACH | 45.00 | 270.00 | 50.00 | 300.00 | 50.00 | 300.00 | 50.00 | 300.00 |
| 0048 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 6 | EACH | 45.00 | 270.00 | 50.00 | 300.00 | 50.00 | 300.00 | 50.00 | 300.00 |
| 0049 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 2 | EACH | 80.00 | 160.00 | 90.00 | 180.00 | 110.00 | 220.00 | 85.00 | 170.00 |
| 0050 | 713-06-00200 | Temporary Reflectorized Raised Pavement Markers (Tabs) | 2,367 | EACH | 1.50 | 3,550.50 | 1.95 | 4,615.65 | 1.65 | 3,905.55 | 2.25 | 5,325.75 |
| 0051 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 5,000.00 | 5,000.00 | 8,000.00 | 8,000.00 | 7,000.00 | 7,000.00 | 4,000.00 | 4,000.00 |
| 0052 | 726-01-00100 | Bedding Material | 85 | CUYD | 85.00 | 7,225.00 | 90.00 | 7,650.00 | 100.00 | 8,500.00 | 100.00 | 8,500.00 |
| 0053 | 727-01-00100 | Mobilization | 1 | LUMP | 525,000.00 | 525,000.00 | 135,000.00 | 135,000.00 | 400,000.00 | 400,000.00 | 557,000.00 | 557,000.00 |
| 0054 | 729-16-00300 | Object Marker Assembly (Type 3) | 28 | EACH | 100.00 | 2,800.00 | 95.00 | 2,660.00 | 80.00 | 2,240.00 | 80.00 | 2,240.00 |
| 0055 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,291 | EACH | 5.25 | 6,777.75 | 5.90 | 7,616.90 | 5.50 | 7,100.50 | 5.50 | 7,100.50 |
| 0056 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 302 | LNFT | 1.40 | 422.80 | 1.50 | 453.00 | 2.20 | 664.40 | 1.50 | 453.00 |
| 0057 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 1,967 | LNFT | 4.00 | 7,868.00 | 5.00 | 9,835.00 | 4.40 | 8,654.80 | 5.00 | 9,835.00 |
| 0058 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 48 | LNFT | 2.51 | 120.48 | 2.80 | 134.40 | 3.30 | 158.40 | 2.75 | 132.00 |
| 0059 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 27.04 | MILE | 2,800.00 | 75,712.00 | 3,170.00 | 85,716.80 | 2,700.00 | 73,008.00 | 3,000.00 | 81,120.00 |
| 0060 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 7.071 | MILE | 850.00 | 6,010.35 | 945.00 | 6,682.10 | 940.00 | 6,646.74 | 900.00 | 6,363.90 |
| 0061 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 3 | EACH | 215.00 | 645.00 | 240.00 | 720.00 | 220.00 | 660.00 | 225.00 | 675.00 |
| 0062 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 3 | EACH | 225.00 | 675.00 | 250.00 | 750.00 | 330.00 | 990.00 | 250.00 | 750.00 |
| 0063 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 400.00 | 400.00 | 445.00 | 445.00 | 440.00 | 440.00 | 450.00 | 450.00 |
| 0064 | 732-05-00100 | Removal of Existing Markings | 0.03 | MILE | 5,000.00 | 150.00 | 5,555.00 | 166.65 | 75,000.00 | 2,250.00 | 5,500.00 | 165.00 |
| 0065 | 735-01-00100 | Mailboxes | 285 | EACH | 1.00 | 285.00 | 5.60 | 1,596.00 | 10.00 | 2,850.00 | 1.00 | 285.00 |
| 0066 | 735-02-00100 | Mailbox Supports (Single) | 165 | EACH | 105.00 | 17,325.00 | 160.00 | 26,400.00 | 100.00 | 16,500.00 | 125.00 | 20,625.00 |
| 0067 | 735-03-00100 | Mailbox Supports (Double) | 25 | EACH | 185.00 | 4,625.00 | 222.00 | 5,550.00 | 125.00 | 3,125.00 | 200.00 | 5,000.00 |
| 0068 | 735-04-00100 | Mailbox Supports (Multiple) | 21 | EACH | 310.00 | 6,510.00 | 500.00 | 10,500.00 | 210.00 | 4,410.00 | 300.00 | 6,300.00 |
| 0069 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 18,500.00 | 18,500.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 |
| 0070 | NS-200-00020 | Cleaning Existing Ditches | 608 | LNFT | 5.15 | 3,131.20 | 11.50 | 6,992.00 | 10.00 | 6,080.00 | 15.00 | 9,120.00 |
| 0071 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 17,509 | INLF | 1.25 | 21,886.25 | 1.25 | 21,886.25 | 0.75 | 13,131.75 | 3.50 | 61,281.50 |
| 0072 | 711-04-00100 | Geotextile Fabric | 50 | SQYD | 1.66 | 83.00 | 4.00 | 200.00 | 2.00 | 100.00 | 50.00 | 2,500.00 |
| CONTRACTOR TOTAL | 6,045,595.30 | 6,177,944.44 | 6,572,835.90 | 7,678,007.25 | ||||||||