Bid Tabulations
Letting of
05/30/2012
LA DOTD Headquarters
| Lead Project: H.002652.6 | |
| Parish: Madison | |
| Routes: LA 603 | |
| Description: LA 603 RELOCATION | |
| Type Const: GRADING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, LIME TREATMENT, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, COLD PLANING ASPHALTIC PAVEMENT, PAVEMENT WIDENING AND RELATED WORK. | |
| Estimated Construction Cost: $2,855,054.73 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $2,368,044.70 |
| 2 | 36936 | Dirtworks Inc Of Vicksburg | $2,868,523.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Dirtworks Inc Of Vicksburg |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing APPROX. 20 ACRES | 1 | LUMP | 55,000.00 | 55,000.00 | 250,000.00 | 250,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 4,000.00 | 4,000.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) (6 LOCATIONS) | 225 | LNFT | 10.00 | 2,250.00 | 9.00 | 2,025.00 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) (7 LOCATIONS) | 184 | LNFT | 10.00 | 1,840.00 | 9.00 | 1,656.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 22,643.7 | SQYD | 4.50 | 101,896.65 | 3.00 | 67,931.10 |
| 0006 | 203-01-00100 | General Excavation | 17,746 | CUYD | 3.40 | 60,336.40 | 6.00 | 106,476.00 |
| 0007 | 203-03-00100 | Embankment | 43,935 | CUYD | 7.90 | 347,086.50 | 10.00 | 439,350.00 |
| 0008 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,366 | CUYD | 11.00 | 15,026.00 | 20.00 | 27,320.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 282 | EACH | 25.00 | 7,050.00 | 12.00 | 3,384.00 |
| 0010 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 8 | EACH | 250.00 | 2,000.00 | 200.00 | 1,600.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 7,086 | LNFT | 2.70 | 19,132.20 | 2.00 | 14,172.00 |
| 0012 | 302-02-04000 | Class II Base Course (8 1/2" Thick) | 28,857.1 | SQYD | 21.00 | 605,999.10 | 25.00 | 721,427.50 |
| 0013 | 304-01-00100 | Lime | 406.11 | TON | 160.00 | 64,977.60 | 165.00 | 67,008.15 |
| 0014 | 304-04-00400 | Lime Treatment (Type D) (12" Thick) | 28,649 | SQYD | 4.00 | 114,596.00 | 3.00 | 85,947.00 |
| 0015 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 950 | CUYD | 15.00 | 14,250.00 | 35.00 | 33,250.00 |
| 0016 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 1,000 | CUYD | 10.00 | 10,000.00 | 32.00 | 32,000.00 |
| 0017 | 502-01-00100 | Superpave Asphaltic Concrete | 5,395.1 | TON | 98.00 | 528,719.80 | 124.00 | 668,992.40 |
| 0018 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 315.5 | TON | 120.00 | 37,860.00 | 138.00 | 43,539.00 |
| 0019 | 509-01-00100 | Cold Planing Asphaltic Pavement | 444 | SQYD | 20.00 | 8,880.00 | 6.00 | 2,664.00 |
| 0020 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -18 | CUYD | 0.10 | -1.80 | 1.00 | -18.00 |
| 0021 | 510-02-00100 | Pavement Widening | 111.2 | SQYD | 100.00 | 11,120.00 | 132.00 | 14,678.40 |
| 0022 | 701-01-01020 | Cross Drain Pipe (30" RCP/PP) | 54 | LNFT | 90.00 | 4,860.00 | 90.00 | 4,860.00 |
| 0023 | 701-01-01080 | Cross Drain Pipe (48" RCP/PP) | 86 | LNFT | 150.00 | 12,900.00 | 150.00 | 12,900.00 |
| 0024 | 701-02-01020 | Cross Drain Pipe Arch (30" Equiv. RCPA) | 256 | LNFT | 90.00 | 23,040.00 | 100.00 | 25,600.00 |
| 0025 | 701-02-01040 | Cross Drain Pipe Arch (36" Equiv. RCPA) | 144 | LNFT | 120.00 | 17,280.00 | 110.00 | 15,840.00 |
| 0026 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) (CMP OPTION NOT ALLOWED) | 220 | LNFT | 40.00 | 8,800.00 | 35.00 | 7,700.00 |
| 0027 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) (CMP OPTION NOT ALLOWED) | 42 | LNFT | 50.00 | 2,100.00 | 51.00 | 2,142.00 |
| 0028 | 701-05-01080 | Side Drain Pipe (30" RCP/PP/CMP) (CMP OPTION NOT ALLOWED) | 190 | LNFT | 65.00 | 12,350.00 | 70.00 | 13,300.00 |
| 0029 | 701-05-01120 | Side Drain Pipe (42" RCP/PP/CMP) (CMP OPTION NOT ALLOWED) | 48 | LNFT | 110.00 | 5,280.00 | 110.00 | 5,280.00 |
| 0030 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) (CMPA OPTION NOT ALLOWED) | 38 | LNFT | 85.00 | 3,230.00 | 100.00 | 3,800.00 |
| 0031 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 18 | LNFT | 95.00 | 1,710.00 | 100.00 | 1,800.00 |
| 0032 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,800.00 | 3,800.00 | 3,000.00 | 3,000.00 |
| 0033 | 708-01-00100 | Right-of-Way Monument | 44 | EACH | 150.00 | 6,600.00 | 190.00 | 8,360.00 |
| 0034 | 708-02-00100 | Right-of-Way Monument Witness Post | 44 | EACH | 150.00 | 6,600.00 | 120.00 | 5,280.00 |
| 0035 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 23,000.00 | 23,000.00 | 10,000.00 | 10,000.00 |
| 0036 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 3.731 | MILE | 225.00 | 839.48 | 200.00 | 746.20 |
| 0037 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.731 | MILE | 150.00 | 559.65 | 350.00 | 1,305.85 |
| 0038 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 14.924 | MILE | 1.00 | 14.92 | 350.00 | 5,223.40 |
| 0039 | 726-01-00100 | Bedding Material | 316.6 | CUYD | 90.00 | 28,494.00 | 88.00 | 27,860.80 |
| 0040 | 727-01-00100 | Mobilization | 1 | LUMP | 100,000.00 | 100,000.00 | 50,000.00 | 50,000.00 |
| 0041 | 729-19-00100 | Dead End Road Installations (Type A) | 1 | EACH | 4,000.00 | 4,000.00 | 3,000.00 | 3,000.00 |
| 0042 | 731-02-00100 | Reflectorized Raised Pavement Markers | 248 | EACH | 6.00 | 1,488.00 | 5.00 | 1,240.00 |
| 0043 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 7.462 | MILE | 2,700.00 | 20,147.40 | 2,800.00 | 20,893.60 |
| 0044 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.866 | MILE | 800.00 | 1,492.80 | 850.00 | 1,586.10 |
| 0045 | 735-01-00100 | Mailboxes | 6 | EACH | 5.00 | 30.00 | 10.00 | 60.00 |
| 0046 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 200.00 | 800.00 | 117.00 | 468.00 |
| 0047 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 300.00 | 300.00 | 125.00 | 125.00 |
| 0048 | 739-01-00100 | Hydro-Seeding | 14.31 | ACRE | 1,000.00 | 14,310.00 | 1,450.00 | 20,749.50 |
| 0049 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 25,000.00 | 25,000.00 |
| 0050 | NS-200-00020 | Cleaning Existing Ditches | 1,000 | LNFT | 6.00 | 6,000.00 | 3.00 | 3,000.00 |
| CONTRACTOR TOTAL | 2,368,044.70 | 2,868,523.00 | ||||||