Bid Tabulations
Letting of
10/12/2011
LA DOTD Headquarters
| Lead Project: H.002633.6 | |
| Parish: West Carroll | |
| Routes: LA 585 | |
| Description: SANDERS RD. TO LA 586 | |
| Type Const: CLEARING AND GRUBBING, GRADING, LIME TREATMENT, IN PLACE CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,523,803.30 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $1,945,478.80 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $2,007,876.52 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 |
| 0002 | 202-02-06100 | Removal of Concrete Walks and Drives | 50 | SQYD | 15.00 | 750.00 | 17.00 | 850.00 |
| 0003 | 202-02-14500 | Removal of Guard Rail | 412 | LNFT | 50.00 | 20,600.00 | 15.00 | 6,180.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 2,380 | CUYD | 18.00 | 42,840.00 | 25.00 | 59,500.00 |
| 0005 | 203-07-00200 | Borrow (Vehicular Measurement) (Selected Soils) | 1,214 | CUYD | 18.00 | 21,852.00 | 20.00 | 24,280.00 |
| 0006 | 304-05-00100 | Lime Treatment (Type E) | 306.64 | TON | 330.00 | 101,191.20 | 500.00 | 153,320.00 |
| 0007 | 308-01-00100 | In-Place Cement Treated Base Course (12" Thick) | 38,939 | SQYD | 10.50 | 408,859.50 | 13.50 | 525,676.50 |
| 0008 | 308-02-00100 | Removal of Existing Patches | 100 | SQYD | 12.00 | 1,200.00 | 30.00 | 3,000.00 |
| 0009 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 679 | CUYD | 80.00 | 54,320.00 | 90.00 | 61,110.00 |
| 0010 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 288.1 | CUYD | 65.00 | 18,726.50 | 77.00 | 22,183.70 |
| 0011 | 502-01-00100 | Superpave Asphaltic Concrete | 7,305.6 | TON | 111.00 | 810,921.60 | 95.00 | 694,032.00 |
| 0012 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 624.6 | TON | 148.00 | 92,440.80 | 150.00 | 93,690.00 |
| 0013 | 704-03-00100 | Blocked Out Guard Rail | 225 | LNFT | 21.00 | 4,725.00 | 20.00 | 4,500.00 |
| 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 70.00 | 7,000.00 |
| 0015 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,100.00 | 8,400.00 | 2,200.00 | 8,800.00 |
| 0016 | 706-02-00200 | Concrete Drive (6" Thick) | 40 | SQYD | 125.00 | 5,000.00 | 75.00 | 3,000.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 72,000.00 | 72,000.00 | 35,700.00 | 35,700.00 |
| 0018 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.864 | MILE | 225.00 | 1,319.40 | 175.00 | 1,026.20 |
| 0019 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.128 | MILE | 200.00 | 425.60 | 220.00 | 468.16 |
| 0020 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.284 | MILE | 350.00 | 2,899.40 | 440.00 | 3,644.96 |
| 0021 | 716-01-00100 | Mulch (Vegetative) | 11.2 | TON | 450.00 | 5,040.00 | 550.00 | 6,160.00 |
| 0022 | 717-01-00100 | Seeding | 336 | LB | 8.00 | 2,688.00 | 8.00 | 2,688.00 |
| 0023 | 718-01-00100 | Fertilizer | 5,600 | LB | 0.50 | 2,800.00 | 0.50 | 2,800.00 |
| 0024 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 7,500.00 | 7,500.00 | 15,000.00 | 15,000.00 |
| 0025 | 727-01-00100 | Mobilization | 1 | LUMP | 145,000.00 | 145,000.00 | 200,000.00 | 200,000.00 |
| 0026 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 90.00 | 720.00 |
| 0027 | 731-02-00100 | Reflectorized Raised Pavement Markers | 387 | EACH | 7.00 | 2,709.00 | 5.00 | 1,935.00 |
| 0028 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.284 | MILE | 3,300.00 | 27,337.20 | 2,900.00 | 24,023.60 |
| 0029 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.128 | MILE | 1,200.00 | 2,553.60 | 925.00 | 1,968.40 |
| 0030 | 735-01-00100 | Mailboxes | 17 | EACH | 5.00 | 85.00 | 15.00 | 255.00 |
| 0031 | 735-02-00100 | Mailbox Supports (Single) | 15 | EACH | 125.00 | 1,875.00 | 125.00 | 1,875.00 |
| 0032 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | 150.00 | 150.00 |
| 0033 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 15,000.00 | 15,000.00 |
| 0034 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 540 | INLF | 3.00 | 1,620.00 | 6.00 | 3,240.00 |
| 0035 | 203-01-00100 | General Excavation | 10 | CUYD | 30.00 | 300.00 | 60.00 | 600.00 |
| 0036 | 701-15-00100 | Concrete Collar | 3 | EACH | 1,000.00 | 3,000.00 | 1,500.00 | 4,500.00 |
| 0037 | 712-02-00100 | Sacked Concrete Revetment | 20 | SQYD | 125.00 | 2,500.00 | 200.00 | 4,000.00 |
| CONTRACTOR TOTAL | 1,945,478.80 | 2,007,876.52 | ||||||